Post Job Free
Sign in

Design Engineering

Location:
Murray, UT, 84123
Salary:
55.00 an hour
Posted:
June 27, 2012

Contact this candidate

Resume:

Lori Donlay: Piping Designer **** Middlesex Road, SLC, UT 84123

**********@*****.*** • Cellular 801-***-**** • Home 801-***-****

OBJECTIVE

To be gainfully employed as Piping Designer.

AREA OF EXPERTISE

• Plant and Equipment layouts; Engineering Conceptual sketches, area plates and vender cut sheets to 2D/3D Cad intelligent format.

• Piping GA plans; from New Design phase through Engineering Specifications, P&ID’s and Connections from vender cut sheets or new designed. Field sketches of existing layouts of interconnections through existing drawing and surveying Facilities existing configuration.

• Equipment Design: Vessel, Pumps, Compressors, Chillers, Cells, Cat -walks, ladder and stairs from conceptual, detailing, renovating and restoration, full constructible design packages.

• Isometrics; readable Field sketches, design cad intelligent production through the aid of Isogen batch files.

• Walk downs of P&ID’s, for tie in operation, and design upgrades putting together full functional work packages together for implementing of new designs and maintenance upgrades.

• Layout of Piping Racks & Supports; from industrial Standard practices and procedures new design concept to spicing and renovating existing pipe racks.

• Understand and Apply Industrial Standards code references: ASME, API, ANSI, ISA, NEC, and UBC.

SOFTWARE TRAINING

• 2D/3D AutoCAD currently 2007

• 3D Auto plant Rebus 2004 addition

• 3D Cadworx’s Plant, 2005 & 2012

• 3D Cadworx’s P&ID, 2005 & 2012

• 3D Cadworx’s Equipment, 2005 & 2012

• 3D Navies works Jet stream 5

• 3D Muti-Structual Steel

• 2D Micro station

• 2D Mechanical Desk top

• Cad-overlay/Raster imagining

• Designer

• Microsoft office suite 2003

• Microsoft Projects task management

• Rebus Pro-piping Series

• 3D Studio max

• PDS

EDUCATION

A.A.S. Degree-Computer Aided Design Drafting Technology December- 1989

ITT Technical Institute, S. L.C., UT

Hands on experience and Technical training through forming an Alliance with Local Businesses for small projects according to the quarters outlined manifest.

Management Certificate of Completion September 1993

Magcorporation, Rowley, UT

Safety practices and procedures for Construction process activates; Safety Reporting to control room and outlining the work to be preformed, the area outline of possible hazards to look for. Safety and how it affects all of us.

3D-Studio Certification of Completion February 1996

Autodesk Training Center, S.L.C., UT

PROFESSIONAL EXPERENCE

Brinderson, Costa Mesa March 2011 to 2012

Piping Designer: Design layout of chemical hcl process and petrochemical process plant using Cadworx’s release 12

Lockheed Martin, Spartanburg, South Carolina Oct 2008 to Jan 2010

Piping Designer: Design layout of facilities systems for manufacturing CYTEC. Including HVAC, Equipment, Utilities, and ETC.. Layout utilities. Using Autoplant XJ

Anvil, Bellingham Washington June 2008 to Oct 2008

Piping Designer: Working in partnership with in house Engineers and Constructors to design and implement small cap projects and implementing new design of petrochemical processing for companies as BP, Conoco Phillips, Chevron. Using Autoplant X

Jacobs Engineering/Constructor, Golden Colorado June 2007 to June 2008

Senior Piping Designer : Acting Liaison for a multi-project engineering firm. Senior Designer Drafter/Checker for 2000 btu. Uranium process facility, 1000 BTU Facility, Suncor= Conoco/Phillips upgrades to the FCC unit added new purge system, constructible work packages for maintenance turn around, Shell new process facility in Wyoming, Questar, new compressor station, new storage facility for LPG. Program and Setup intelligent configuration, specification (spec writer), and build intelligent piping, off spec., components for the Isogen specification files for the individual client’s preferences for the Bill of material layout. Using Cadworks Plant Professional 2008 and Autocad 2008

Brinderson/Jacobs, Bakersfield California January 2006 to June 2007

Senior Piping Designer: Project Design was to design and install New Clean fuels projects. Duties included as senior piping designer, Design New gasoline blender, including skid mounted 9 pump station and all the interconnecting pipe and new pipe raceway, supports. Designs locate of pumps and new interconnect piping for in-plant isobutene system to supply new Meraux unit to remove the sulfurs in the LPG. Other duties was to support engineering for all other piping interconnection for; New FCC Unit, Hydrogen Unit, Heat exchangers, for the Big West/Flying J Petrol Chemical downstream facility. Upstream Construction Design for a New Temporary Storage Facility, and to maintain process equipment fabrication drawings for, ICL skid manifolds, Well head mounting supports. Using Cadworks Plant Profession 2005 ACAD 2005

CCI Mechanical/Kennecott, Salt Lake City, Utah March 2005 to January 2006

Senior Piping/HVAC Designer: Project to design and install industrial Chiller system for all electrical rooms and control rooms at Kennecott, Retrofit of all existing HVAC systems, fabrication drawing of of old and new duct. Detailed Equipment placement drawing installations and ongoing update O&M for refrigerate systems and fire systems. Using Acad 2004, Cadworx

Redd Engineering/Constructor, Salt Lake City, Utah/ Green River, Wyoming

Senior Piping/Mechanical Designer February 1999 to March 2005

Multi-disciplined engineering construction firm. Worked in partnership with in house Engineers and Constructors, on Petrochemical companies as BP, Amoco, Chevron/Texaco, Exxon Mobil and Flying J. Gas transmission, William Bros, Questar, Sinclair, Fina, and Shell. Mining was Kennecott. Cadworx 2004 and Acad 2000

Booth and Associates, Pocatello, Idaho/ Anniston, Alabama February 2003 to March 2004

Senior Piping/Mechanical Designer Drafter March 2000 to September 2001

Chemical Demilitarization for munitions stockpile piping plans of system configurations. Familiar with Federal Sop’s. RFI, Wads and ECP procedures. Work order packages consisting of walk down of P&ID’s piping plans and Iso’s packages of existing system configurations for a change in the sops. Small Projects as consulting, for Automation forklift company (Dafukie), Chevron, Gas transmission, William Bros, Questar and nuclear waste. Acad 2000 and Itergraph

Bryan A Stir rat & Associates, West Covina, California September 2001 to February 2003

Senior Piping Designer: Landfill Gas Extraction piping drawing including system plans and details with direct interface interconnection to; well locations, Headers, storage tanks,. Calculate slopes of header and Sub-Header piping. Flare Station Assemblies. Plans, Details, and Bill of Materials. Field walk down and site verification. Corrections and modifications to P&ID’s and Electrical Schematic drawings. Acad 2000

in the sops.

C.E. Entry/Layton Construction, Salt Lake City, Utah/ Rawlins, Wyoming February 1998 to February 1999

Senior Piping Designer Drafter: Multi-disciplined engineering construction firm. Worked in partnership with in house Engineers and Constructors, on Petrochemical companies as BP, Amoco, Chevron/Texaco, Exxon Mobil and Flying J. Gas transmission, William Bros, Questar, Sinclair, and Shell. Mining was Kennecott .Acad 14

TEC-Thomas Engineering/Peterson Fabrication, Bountiful, Utah January 1997 to February 1998

Senior Mechanical Designer Drafter: Project to design new waste compactor 3 piece unit (Baler, Helirap, and Tilt conveyor), responsibilities included design up new concepts as per engineering specifications and project meetings. Track all equipment data sheets per piece of equipment, and create equipment operation manuals. Acad R14



Contact this candidate