Post Job Free
Sign in

Electrical Project

Location:
Batangas Province, CALABARZON, Philippines
Posted:
April 05, 2012

Contact this candidate

Resume:

ISAGANI G. MANALO

Address: Pitugo, Bauan,Batangas

Philippines

Mobile No. +639********* / +639*********

E-mail address: **********@*****.***

Passport No.: EB1027873

Personal Employment Pass (PEP): G6082698L

CAREER OBJECTIVE:

To be able to work in the Commissioning of oil and gas plant where I can utilize my skills and experience in the field of electrical and at the same time enhance my knowledge in my chosen endeavor.

Company : EMAS CONSTRUCTION AND PRODUCTION

Under contract to TECNOMAR ASSOCIATES

Client : PREMIER OIL VIETNAM OFFSHORE BV

Project : BLOCK 12W FIELD DEVELOPMENT

FPSO LEWEK EMAS

Address : KEPPEL SHIPYARD, BINOE YARD

15 BINOE ROAD, SINGAPORE

Date : MARCH 25, 2011 to JUNE 30, 2011

Position : ELECTRICAL COMMISSIONING TECHNICIAN

JOB DESCRIPTION:

Pre-Commissioning and Commissioning motor running test and lighting system to complete PC’s and MC’s inspection test record. Supervision of electrical crew for the installation, cable termination and walk down inspection for the lighting and heat tracing system. Pre- Commissioning and Commissioning Heat Tracing System to complete Inspection test record. Wire checking point to point, insulation resistance test, Energization of power supply small power and from UPS power to instrument panel. Production, Quality, Cost and Safety.

Company : LINDE AG ENGINEERING

Under contract to NES GLOBAL OVERSEAS LLC

Project : PEARL GTL PROJECT

Address : RAS LAFFAN, QATAR

Date : OCTOBER 24, 2010 to MARCH 17, 2011

Position : E&I QUANTITY SURVEYOR

JOB DESCRIPTION:

Production, Quality, Cost and Safety. Perform material take offs prior to the purchase requisitions for the projects and report any irregularities or discrepancies to the project management. Works involved in electrical / instrumentation quantity surveyor re-measurements. Preparing material take-off and budget quantity, cost monitoring. Preparing work progress report. Performs all related field work involved in re-measurement and determination of quantities for projects. Assists in monitoring projects and conducting site visits to ensure conformity with project scope and specifications. Implementation and adherence to HSE and quality system procedures and plans Carry out any other activities directed to by the supervisor.

Company : TANKER PACIFIC OFFSHORE TERMINAL Pte. Ltd.

Under contract to WARTSILLA AUTOMATION Pte. Ltd.

Project : FPSO MONTARA VENTURE PROJECT

Address : #5 JALAN SAMULUN JURONG SHIPYARD, SINGAPORE

Date : APRIL 16, 2009 to November 06, 2009

Position : E&I MECHANICAL COMPLETION / COMMISSIONING

Company : CONOCO PHILIPS

Under contract to AIR ENERGI GROUP SINGAPORE Pte. Ltd.

Project : BOHAI BAY

FPSO PHASE II DEVELOPMENT PROJECT

Address : SIMBAWANG SHIPYARD,SINGAPORE

Date : May 6, 2008 to DECEMBER 14, 2008

Position : ELECTRICAL COMMISSIONING TECHNICIAN

Company : SAKHALIN ENERGY INVESTMENT COMPANY

Under contract to KENTZ RUSSIA

Project : SAKHALIN II PHASE II ONSHORE PROCESSING FACILITIES

Address : SAKHALIN, LUNSKOYE, RUSSIA

Date : AUGUST 8, 2007 to APRIL 30, 2008

Position : ELECTRICAL COMMISSIONING TECHNICIAN

Company : EXXON NEFTEGAS LIMITED

Under contract to KENTZ RUSSIA

Project : EXXON NEFTEGAS LIMITED

ONSHORE PROCESSING FACILITIES

SAKHALIN 1, EPC-1, PROJECT

and OLYMPIA PROJECT YUSHNO SAKHALIN

Address : SAKHALIN, CHAYVO, RUSSIA,YUSHNO, RUSSIA

Date : DECEMBER 13, 2005 to JUNE 30, 2007

Position : ELECTRICAL COMMISSIONING TECHNICIAN

JOB DESCRIPTION:

Perform 10kV-6kV-400V motor running test. Completed Inspection and Test Record commissioning Electrical check list. Conduct high potential test and insulation resistance test of transformer, cables and motor windings. Energization of 6KV and 10KV transformer and Pre-commissioning and Commissioning of UPS. Assign in MCC for start-up the Power Generation Gas Turbine 38MG Watt. Perform ESD shut down cause and effect testing. Execute trouble shooting and rectification works on all Electrical involving the system. Dynamic commissioning for the Instrument air compressor and turbine compressor. Assign in ECS console Boardman sending auto command to PCS and closing the contactor, start and stop command in ECS to running of motor. Functional testing of motor starter thru ECS, PCS, and protection relays. Operate and monitoring in HMI Insum the status of the motor protection, starter configuration, protection, alarms, and tripping. Commissioning of Electrical Trace Heating System. Assigned walk down inspection electrical sub-system. Commissioning of electrical lightings. Perform E/I completion of mechanical check sheets,(fill up MC forms) with some punchlist items submitted prior for pre commissioning. Make as built drawings and prepare pre-commissioning check sheets for commissioning (fill up ITR’s) and final completion of the system.Perform Inspection of Electrical equipment, HVAC, Instrument device installation and cable testing to completed check list Inspection Testing Record Mechanical Completion. Review. E/I mechanical completion & Pre commissioning Dossiers per sub-system as per index.

Company : MASCO ZEPAM SPECIALIST

Under the company of LUMMUS ALIREZA Ltd. Co.

Project : MARJAN OFFSHORE FACILITIES

GAS AND OIL SEPERATION PLANT UP-GRADE PROJECT

Client : SAUDI ARAMCO, Saudi Arabia

Date : NOVEMBER 2003 to JANUARY 2005

Position : ELECTRICAL FOREMAN

Company : MASCO ZEPAM SPECIALIST/

SAUDI TOYO ENG’G COMPANY

Project : PETROKEMYA POLYETHELENE (PKPE)

Address : AL-JUBAIL KINGDOM SAUDI ARABIA

Date : MARCH 2003 to OCTOBER 2003

Position : ELECTRICAL FOREMAN

JOB DESCRIPTION:

Pre-commissioning and commissioning of 13.8KV & 4.16KV switchgear, 400V MCC. Conduct functional testing of motor starter and its control protective equipment. Perform torquing of termination Electrical bolt and check the Bus Bar conductivity test or ductor test micro-ohmmeter. Pre-commissioning and commissioning of lighting system. Execute trouble shooting and rectification work on all Electrical involving the system. Conduct installation of local field instrument and termination of control cable and instrument cables. Responsible for the proper work execution and workmanship by guiding the skilled workers on how to perform the correct working procedure minimizing loss of time and materials. Prepare accomplishment report and evaluate the outstanding works activities. Perform as- built drawing.

Company : TAILEM INTERNATIONAL

KASSEM DARWISH FAKRO & SON

Project : NGL-4 EPC PROJECT

Address : DUKHAN DOHA QATAR

Client : QATAR GENERAL PETROLEUM COMPANY

Date : JUNE 2001 to JUNE 2002

Position : ELECTRICAL FOREMAN

JOB DESCRIPTION

Responsible for Production, Quality, Cost and Safety. See to it that prior to any activities, work permit was accomplished and the areas of work were cleared of any unsafe things for personal SAFETY. Study the plan and drawing details approve for construction layout and for the scope of works to be done. Take off the materials needed for the construction activities prepare equipment and tools. Organize man power for the activities of the day. Responsible for the proper work execution and workmanship by guiding the skilled workers on how to perform the correct working procedure minimizing loss of time and materials. Prepare accomplishment report and evaluate the balance activities. Perform and solve some problems arising during construction by coordinating with supervisor and superintendent.

Company : DAILEM ENGINEERING

Project : CO-GENERATION POWER PLANT

Address : INDUSTRIAL PARK, MAI-LIAO, YUNLIN

TAIWAN REPUBLIC OF CHINA

Client : FORMOSA CHEMICAL & FIBRE CORP.

Date : MAY 1999 to APRIL 2000

Position : ELECTRICAL TECHNICIAN

JOB DESCRIPTION:

Perform the functional checking of motors and its controls and protective equipment. Conduct loop checking continuity, insulation resistance test and high potential test of cables. Motor winding resistance test and equipment. Energization of equipment, transformer and perform check the voltage and phase rotation. Torquing of bus bar connection. Perform to check the battery cell voltage before energization of UPS. Perform rectification of punch list items. Point to point for the AC & DC schematic diagram 13.8Kv and 4160 volts switchgear.

Company : EEI CORPORATION

Project : IC PLANT SEMI CONDUCTOR

Address : CALAMBA LAGUNA PHILS.

Client : PHILLIPS

Date : MAY 1998 to FEBRUARY 1999

Position : ELECTRICAL TECHNICIAN

Company : EEI CORPORATION

Project : BATANGAS PETROCHEMICAL

Address : SIMLONG BAT’S CITY PHILS.

Client : JG SUMMIT PETROCHEMICAL CORP.

Date : MARCH 1996 to APRIL 1998

Position : ELECTRICAL TECHNICIAN

Company : EEI CORPORATION

Project : REPUBLIC CEMENT

Address : NORZAGARAY, BULACAN, PHILS.

Date : JANUARY 1995 to MARCH 1996

Position : ELECTRICAL TECHNICIAN

JOB DESCRIPTION:

Installation of field instrument and termination of cables. Perform the pre-commissioning and commissioning of lighting system. Perform cable and equipment testing including insulation resistance and high potential test. Install and connection all wiring between piece of electrical equipments and electrical loads. Fabrication and installation of cable tray and conduit. Assign in power cable termination. Glanding and termination of multi-core control cable between Marshalling boxes of both low and high voltage switchgear control panel. Assign rectification of punch list items.

TRAINING:

OFFICE 2000 PACKAGE

(win2000 / ms word / ms excel / ms power point)

64 hours course

October 7, 2006 – October 25, 2006

Meralco Foundation Institute (MFI)

City of Pasig, Philippines

CALIBRATION OF PROCESS INSTRUMENT

36 hours course

June 17, 2000 – July 29, 2000

Meralco Foundation Institute (MFI)

City of Pasig, Philippines

PERMIT TO WORK TRAINING

Permit Authorized Aplicant & Permit Acceptor

Company LINDE AG ENGINEERING, QATAR

December 20, 2010

PEARL GTL PROJECT

Ras Laffan, Qatar

SHIPYARD SAFETY INSTRUCTION COURES

NTUC Workplace Safety & Health Training Centre

NTUC Learning Hub Pte Ltd

Batch No.: JBSGT1110668/05

Date of expiry: 27 March, 2013

239 Jalan Baesar

Singapore 208912

EDUCATIONAL ATTAINMENT :

College : GOLDEN GATE COLLEGES

Batangas City, Philippines

Bachelor of Science in Electrical Engineering

Graduated October 1994

PERSONAL DETAILS:

Full Name Isagani de Guzman Manalo

Date of Birth: November 26, 1973

Status Married

Nationality: Filipino

End



Contact this candidate