Post Job Free
Sign in

Manager Design

Location:
Denver, CO
Salary:
5000 $us net per month
Posted:
May 18, 2012

Contact this candidate

Resume:

Mr. ANDRO ALIENDRE GARCIA

Casa *-A, Calle * y Ave. Gobles, Zona Irpavi

Bolivia – La Paz •Phonne: +591********

Email: j6pzwt@r.postjobfree.com

Skype ID: androaliendre

Resume

Degreed Professional Mining Engineer, with a wide range of international experience at Central & South America, in the field of open pit mining; with a high level in Planning Management. Able to work on own initiative and as part of a team. Proven leadership skills, involving managing, developing and motivating, with a dedication to maintaining high quality standards. Trained and knowledgeable in the areas of health, safety, personnel and requirements in the field of the environment laws and mining industry.

Consequently I’ve coordinated technical and financial aspects with the mining management, for a long time plan (LTP) and short time plan (STP), always elaborating a budget and to settle budgets per year. Also with a great experience in many software’s certificated by international companies as datamine, gemcom, miner, autocad. Completing with the courses of training of these software’s. However I have the experience in evaluation and estimation of mining resources, pit’s design, dumps and roads design, drill holes and blasting simulation design, fleet truck and cost optimization, cost mining control, evaluation and optimization the new mining projects.

Have good understanding of an International Mining Companies, and working with different cultures, also with a great experience in the field of outside operations as planning, drilling and blasting rocks, mining, dumping, loading, hauling, trucking, dewatering; day by day helping with creative solutions to problems.

Education

• 1982 -1989 Universidad Técnica de Oruro Oruro, Bolivia

Bachelor’s degree of Mining Engineering.

Thesis Subject: Geo-statistical reserves estimations to Colquiri mine and Tin vein deposits.

• 2008 - 2011 Universidad Simon Bolivar Sucre, Bolivia

Master’s degree in Environment Science applies to Mining Industry

Thesis Subject: Aerobic treatment of sewage water by activated sludge “Bioreactor-type”

Experience

2010 - 2011 Petaquilla Gold S.A., Canadian Company Coclesito, Panama

MINING MANAGER

Mining Manager of pit mining in “Molejon” Gold mine. Main Responsible of mining pit. Responsible of Long time plan mine design in GEMCOM software, I have prepared a Budget and 4 times forecast yearly planning. Responsible of Short time plan mine design in GEMCOM software, I have prepared Pit mining, stockpile and dump weekly planning. Responsible of access roads mine design by 15 m with, 10% slope. Pit and stockpile monthly update of topographic advance drawings in CAD. Responsible of drill-holes design and blasting simulations. Control manpower hours and of all machine hours used in the mine of 20,000 TPD mining production and 2,500 TPD ore mining. Control of “SOCOCO” Mining Contractor and “ORICA” blasting rocks contractor.

12 direct reports per year

55 salaried employees, engineers, technician, buyers, planners and supervisors worked under my supervision

Safety Team leader

ACHIEVEMENT

I have make a pit cone design expanding from 24 Mtons to 79 Mt mining, increasing to 800 mil ounces gold reserves and life of mine, the Behre of Dolbear contractor down supervision

2009 - 2010 Paititi S.A, Orvana Gold & Copper Company Santa Cruz, Bolivia

ASSISTANT MINING MANAGER

Assistant Mining Manager of pit mining in “Don Mario” Gold mine. Main Responsible of mining pit. Responsible of Long time plan mine design in GEMCOM software, I have prepared a Budget and 4 times Forecast yearly planning. Responsible of Short time plan mine design in GEMCOM software, I have prepared Pit mining, stockpile and dump weekly planning. Responsible of access roads mine design by 12 m with, 12% slope. Responsible of drill-holes design and blasting simulations. Pit and stockpile monthly update of topographic advance drawings in CAD. Control manpower hours and of all machine hours used in the mine of 20,000 TPD mining production and 2,500 TPD ore mining. Control of “OROSCONS” transportation truck contractor.

12 direct reports per year

45 salaried employees, engineers, technician, buyers, planners and supervisors worked under my supervision

Safety Team leader

ACHIEVEMENT

I have maked a pit cone “Las Tojas” design, 6 Mt mining by 46 mil ounces gold reserves, the AMEC contractor down supervision.

2007 - 2009

Manquiri S.A., Coeur d alene Silver Company

Potosí, Bolivia

PLANNER MINING SUPERINTENDENT

Planner Mining Manager of superficial rock mining in famous “Cerro Rico de Potosi” Silver mine. Responsible of Long time plan mine design in GEMCOM software, I have prepared a Budget and 4 times Forecast yearly planning. Responsible of Short time plan mine design in GEMCOM software, I have prepared ore superficial remove mining, stockpile and dump weekly planning. Responsible of access roads mine design by 10 m with, 12% slope. Responsible of risk superficial remove rocks in the mountain and don t touch the bed rock, strengthening and dewatering solutions in old underground mine impact. Superficial mining and stockpile monthly update of topographic advance drawings in CAD. Control manpower hours and of all machine hours used in the mine of 10,000 TPD mining production and 5,000 TPD ore mining. Control of transportation truck contractor

12 direct reports per year

51 salaried employees, engineers, technician, buyers, planners and supervisors worked under my supervision

Safety Team leader

ACHIEVEMENTS

I have planned of superficial remove mining in famous “Cerro Rico de Potosi” of high risk and carefulling don t impact the morphology conic shape of mountain for excessive underground mining from colonial time. The reserves in famous “Cerro Rico de Potosi” were 2 billion ounces of Silver.

2004 - 2007

Inti Raymi, Newmont Gold Company

Oruro, Bolivia

PLANNER MINE

Planner mining of pit in “Llallagua” Gold mine. Responsible of Long time plan mine design in MINER & MINESIGHT software, I have prepared a Budget and 4 times forecast yearly planning. Responsible of Short time plan mine design in MINER & MINESIGHT software, I have prepared Pit mining, stockpile and dump weekly planning. Responsible of access roads mine design by 15 m with, 10% slope. Pit and stockpile monthly update of topographic advance drawings in CAD. Responsible of drill-holes design and blasting simulations. Control manpower hours and of all machine hours used in the mine of 60,000 TPD mining production and 20,000 TPD ore mining. Control of “ORICA” blasting rocks contractor

12 direct reports per year

55 salaried employees, engineers, technician, buyers, planners and supervisors worked under my supervision

Safety Team leader

ACHIEVEMENT

I took part in the seventh leach pad expand, calculating of economics parameters as Net present value and analysis of sensitivity.

2001 - 2004

Atlas Copco Bolivian

Santa Cruz, Bolivia

SELLER ENGINEER

Periodicals visit of miner companies and technical assessment sales of drillers, compressors and electrical generators machines. Elaborate monthly and yearly plans of sales. Elaborated pro-forms for quotations equipments and spare parts machines. Air compressors installation, line inspections into ISO 9001 e ISO 14001 norm.

12 direct reports per year

1993 - 2001

Soboce, Bio Bio Chilean Company

La Paz, Bolivia

MINING SUPERINTENDENT

Main Responsible of 4 pits mining locate into Bolivia. Manager production of 4 pit mining as limestone, clay, gypsum, clay, hematite oxide for 4 cement plants into Bolivia as Viacha, El Puente, Warnes, and Fancesa. Responsible of LTP and STP mining plans and control mine. I have prepared a technical and cost budget for principal minerals mining of 4 cement plants. Mining, drilling and blasting rocks, hauling and trucking supervision. Control manpower hours and of all hours machine used in limestone mining and coordinate for maintenance of mechanical and electrical machines. Control of transportation truck contractor

12 direct reports per year

35 salaried employees, engineers, technician, buyers, planners and supervisors in each mine under my supervision

4 pit mining supervision

Safety Team leader

Professional Reference

1.- Mr. Eugene Jerry Snider (English conversation)

General Manager Torex Gold Resources Company

Fix phonnes:+52.777.102.1452 o +52.736-***-**** office, Cuernavaca, Mexico

Mobile phones: +591.72006144, Bolivia, +52.777-***-****, Mexico

j6pzwt@r.postjobfree.com

Gene.snider - skype

2.- Ms. Patricia Agrasar (English conversation)

Controller Project Mining , Petaquilla Gold Company

Fix Phone.- +507.98300400, La Pintada , Panama

Mobile Phone.-+507.64910367, Penonome, Panama

j6pzwt@r.postjobfree.com

3.- Mr. Jarix Maylle (Spanish conversation)

Geologist Senior Mining, Petaquilla Gold Company

Fix Phonne.- +507.67838182, La Pintada, Panama

Mobile Phonne.- +507.98300400, Penonome, Panama

j6pzwt@r.postjobfree.com, j6pzwt@r.postjobfree.com

Monthly net salary expectations

I would like to win 5000 U$ (American dollar) per month



Contact this candidate