Post Job Free

Resume

Sign in

Manager Engineer

Location:
TOKYO, Tokyo, 105-0014, Japan
Posted:
October 25, 2012

Contact this candidate

Resume:

Tel: 050******** / 080******** Flat No. ****,

j4vzjz@r.postjobfree.com Premeir Stage shibakoen II, 1-10 -8 Shiba,

Minat-ku,Tokyo,Japan 105-0014

JOB PROFILE

To pursue a career that provides platform for continuous learning with an opportunity to prove

myself as worthy asset leading to self-improvement and growth of organization.

WORK EXPERIENCE

6 Years of rich experience as Piping Layout Engg in Oil & Gas Sector.

WORK EXPERIENCE: PREVIOUS EMPLOYER

ORGANIZATION : SAMSUNG ENGINEERING INDIA PVT LTD.(NOIDA)

DESIGNATION : SR. ENGINEER - PIPING

TOTAL EXPERIENCE : JULY 2010- JULY 2012

WORK EXPERIENCE: PREVIOUS EMPLOYER

ORGANIZATION : RELIANCE ENGINEERING ASSOCIATES LTD. (JAMNAGAR)

DESIGNATION : MANAGER - PIPING

TOTAL EXPERIENCE : MARCH 2007- JULY 2010

ORGANIZATION : M/s Crompton Greaves Ltd

DESIGNATION : GET - PIPING

TOTAL EXPERIENCE : JULY 2006- MARCH 2010

TECHNICAL SKILLS

Proficient in Equipment modeling, Piping designer, Isometric drawing manager modules of PDS (7.2, 7.3),PDMS,SP3D.

Proficient in preparation of Equipment and Piping layout and modeling for Pumps, Exchangers, Vessel, pipe rack, towers and drums.

Proficient in preparing Piping Isometrics, Material Take-off.

Proficient in Reading PFD’s, P&ID’s, Instrument hookup drawings, Equipment Data sheets, vendor GA drawings.

Familiar with inter-departmental activities like preparation of inputs for pipe support cleats on columns (vessels), platform inputs for equipments, checking of Equipment Vendor drawings, Inter Disciplinary Checks from other disciplines etc.

Familiar with interference checking of equipment and piping modeling through Smart Plant Review.

Isometric extraction, checking and error fixing.

Preparation of bulk piping MTO & support MTO.

Preparation of steam tracing schedule, piping interface schedule.

Review of vendor drawings, Mechanical data sheets, Process data sheets, Instrument datasheets and civil inputs for structure, platform and civil pipe support (cps).

Preparation of Stress packages for Stress department for Analysis and incorporating their comments in Layouts

Interdisciplinary co-ordination with other department like civil, electrical, mechanical, instrumentation for finalizing the job.

Preparation of input drawings to other disciplines such as nozzle orientation drawing, CPS, Platform details.

Resolution of site queries and site engineering requests.

Preparation of 2D drawings like Plot plan, nozzle orientation drawing, SPS (Special pipe supports), Rack Drawing & various study drawing in Micro station.

As a PDS Co-coordinator done various exercises on Report manager, iso error locating activities, and line/model lock unlock activities, URLC Generation,inhouse software development activities, format development, preparation of job notes with IS CAD department.

As Material Engg worked for 6 months and handled responsibilties.BOM preparation, stock code generation,P.O raising, queries resolution.

PROJECTS HANDLED

A) Under SAMSUNG ENGINEERING INDIA PVT LTD.

1) DHDS- NOCL (Nagarjuna Oil Corporation Ltd.): Handled material realated activities.Prepared Bulk MTO, Specialty MTO, MRs, technical Queries. Creating & updating Piping Class database in In-House material S/W GPIMS.Resolved material errors & queries generated during the MTO Loading. Generated various type of reports required for Materials. Checked the Isometrics with respect to P&ID & Material aspect. Prepared TBE for all piping materials Resolved Queries raised by Layout team regarding piping class & materials. Issued MR for Bulk items & updating the data as per changes. Comparing the MTO & generating the conflict Report & resolving the conflict with the Layout team. Prepared many material related Work instructions. Prepared Steam Tracing schedule.MTO generation with GPIMS S/W.

2) ISPRL- Prepared the Bulk MTO for bidding purpose of Project. Prepared all specialties Items MRs for cost & evaluation purpose. Did piping layout in PDS for lines to estimate pipe length & fittings.Preapared various MTO like bulk MTO, paint MTO, insulation MTO, inch dia report for initial bidding purpose. Did TBE for various piping items & resolved technical query of vendors.

3) FERTILE-2: 3D Piping using Piping S/W PDMS 11.6 .Did 3-D modeling for all small bore & utility lines. Prepared steam tracing schedule. GA Drawings for rack & other process areas using S/W PLANT WAVE. Preparation of input drawings to other disciplines such as nozzle orientation drawing, CPS, Platform details.

4) SHAH U & O GAS: 3D Piping, Equipment modeling, Supporting using Piping S/W SP3D.

5) HDPE:- HIGH DENSITY POLYETHYLENE:-Plot Plan development,equipment modeling, Piping layout,MTO generation, releasing isometric. Developed skills & knowledge in Steam Jacketing piping. Active participation in model review using S/W SPR(Smart Plant Review)

B) Under SEZ-Jamnagar Export Refinery Project (JERP)-RIL worked for:

1) Delayed Coker Unit: Worked for early commissioning of 6 drum of Coker unit.

Bulk MTO generation, engineering deliverable schedule preparation,3D piping modeling using PDS 7.2.Releasing stress critical lines list to Stress Dept. Done several DCNs,SER,resolved site queries. Involved in Yellow line auditing, preparation of steam tracing schedule,nozzle orientation,platform orientation,cleat support inputs. Involved in Model review sessions using SPR.

2) Fluid Catalytic Cracker Unit: 3D Piping & equipment modeling using PDS7.3.

Pipe Rack & other major structure load inputs. Releasing Isometrics for construction. Done DCN’s, Site engineering request (SER),Plant start-up Request. Resolved Site queries, load inputs to civil.Involved in various auditing activities like support audit, process audit, stress audit,yellow line audit,thermal audit for regenerator & reactor.etc. Model review using SPR & its comment updation.Active participation in Pre commisioning activities like,Battery limit interface checking,Plant Start up request,Site queries resolution & Post commisioning activities like PCO,As built in model. Did Plot plan develoment & modification activity under PCO.

C ) M/s Crompton Greaves Ltd

Worked for 4 months as Graduate Engineer Trainee with M/s Crompton Greaves Ltd.

Preparation of firefighting piping system.

Preparation of yard piping layouts

ACADEMIC QUALIFICATIONS

EXAMINATIONS YEAR BOARD/UNIVERSITY MARKS

B.TECH 2002-2006 U.P TECHNICAL UNIVERSITY 76%(HONOURS)

AISSE 2002 CBSE 88%

AISCE 2000 CBSE 88%

SOFTWARE SKILLS

PDS (Equipment Modeling, Piping Designer, and Report Manager)

PDMS 11.5 ( Piping Designer)

SP3D (EQUIPMENT MODELLING,PIPING DESIGNER)

Smart Plant Review,(FOR REVIEW PURPOSE)

Nevis Work (For review purpose),GPIMS (Inbuilt Material management S/W)

Pelican Forge (For Supporting )

Micro station,AutoCAD

PERSONAL DETAILS

Date of Birth : 04.11.1984

Father Name: Mr Amarpal Tyagi

Nationality : INDIAN

Permanent Address: Pooja Tyagi,

Flat No F403 Sec-62

Designer Park Apartment-Block

Sec-62, Noida

U.P-201301



Contact this candidate