|JEAR V. PUNO | |
|e-mail: ********@*****.*** | |
|CONTACT NUMBER: +639********* | |
|PASSPORT NUMBER:XX3932595 | |
|PASSPORT VALIDITY: 9-JUNE-2014 | |
|objective | |
| |. To apply and develop competency in my field of work that will enhance my | |
| |potential skills and become a best asset of my working environment. | |
|Education | |
| |Bachelor of Science in Electronics and Communications Engineering (BSECE) | |
| |Saint Mary's University | |
| |Bayombong 3700, Nueva Vizcaya | |
| |SY 2001-2007 | |
| | | |
| |Electro Technical Officer | |
| |Wartsila Land and Sea Academy | |
| |Subic Bay Free Port Zone, Zambales | |
| |March 2012 - August 2012 | |
|elIGIBILITY | |
|Registered Electronics Engineer |
|Professional Regulation Commission License no. 41940 |
|Registration Date: 16-April-2008 |
| |
|Class A- Grade 2 Level Inspector Classification |
|Certificate Number: QA-2011-GR2-012 |
|Qualification Date: July 1, 2011 |
| |
|Class A- Grade 1 Level Inspector Classification |
|Certificate Number: QA-2010-GR1-007 |
|Qualification Date: August 5, 2010 |
|EMPLOYMENT RECORDS | |
| | |
| | |
|POSITION: Q.A. Inspector/Engineer - Electrical and Machinery Department | |
|July 2009 - Present | |
|COMPANY NAME: HHIC-Phil (Hanjin Heavy Industries & Construction Co. Ltd.) | |
|Greenbeach 1, Redondo Peninsula, Sitio Agusuhin Brgy. Cawag, Subic Freeport | |
|Zone, Zambales, Philippines | |
|COMPANY NATURE: SHIPBUILDING/MARINE INDUSTRY | |
| | |
|JOB DESCRIPTION: | |
|Shipyard Representative for Conducting Onboard Inspections and Test Plan's | |
|Procedures under Electrical and Machinery Department together with the | |
|project Supervisor/Superintendent and classification society's surveyors for | |
|newbuilding vessels. | |
| | |
|These Inspections and Test Plan Procedures includes: | |
|- Electrical power generation and distribution | |
|- Integrated Electrical Propulsion Systems | |
|- Electrical machines | |
|- Electrical protection systems | |
|- Use of electricity in explosive environments | |
|- Power converter systems | |
|- Systems engineering principles | |
|- Principles of software assurance activities | |
|- Use of National and International Standards | |
|- Regulatory compliance | |
|- Marine Electronics and Communications System | |
|- Marine navigation systems | |
|Cable Installation | |
|-checking and survey of electrical wiring installation in all parts of the | |
|vessel if it complies with the standard of installation. | |
|Electrical Equipment Installation | |
|-cheking drawing plan or blue print of the vessel as guide and reference in | |
|the proper installation of the electrical equipments. | |
|Electrical Equipment Safety and Function Test | |
|-Alarms and Monitoring System (AMS) inpection that includes all electrical | |
|and electronics sensors checking and inspection that includes value setting, | |
|alarm point and calibration as it complies to the design plan. | |
|Generator Engine Safety and Function Test | |
|-Alarm and Monitoring System inspection: checking the safety devices | |
|(sensors) of the Generator Engine after installation if it is working | |
|properly at it was designed in accordance with the manufacturer's | |
|specifications and plan. | |
|-Generator Characteristics test (Load Test, etc.): Actual running of the | |
|Generator and testing its supply voltage at different capacity of loads. | |
|Observing and Recording the characteristic of the Generator engine during | |
|load regulation. | |
|Mainswitchboard Safety and Function Test | |
|-Testing the power distribution of the Genenerator through the switcboards | |
|that includes safety functions and alarm monitoring system. | |
|-Actual Checking of the functions of the different switchgears that are | |
|installed at the switcboards if its complies to the makers specifications.| |
| | |
|Main Engine Mooring Trial | |
|-Mooring Trial: Testing the Main engine at running condition at the quay | |
|side,this inclues safety alarms and devices such as SLOW DOWN and SHUT DOWN | |
|FUNCTIONS. | |
|-Actual running of the Ships Main Engine: Checking the Safety | |
|devices(sensors) that are installed in the Engine if it complies with the | |
|manufacturers specification. Observing and recording the characteristis of | |
|the Engine at running condition then review and analize the data | |
|gathered.(e.g. RPM, TEMPERATURE. PRESSURE, etc.) | |
|Operation and Function of Ship's Electronics and Communication System. | |
|-Checking the communication system of the ship that includes Telephone | |
|System, Public Address system, Extension Alarm, Navigation System and Signal | |
|System. etc. | |
|Sea Trial | |
|-Attends sea trial to observe the electrical equipment performance during sea| |
|condition and records problem that will arise for continual improvement | |
|regarding all matters affecting the electrical and machinery operation| |
|of the ship. | |
|B. Prepares, schedules and submit final inspection items for owner | |
|representatives and classification society. | |
|C. Prepares and Submits documents such as equipment certificates and test | |
|records for verification of Classification Society as a requirements before | |
|delivery of the constructed ship. | |
|D. Providing a solution to the Owner's Comment with the accordance of the | |
|Classification Society Rules. | |
|E. Assures that finished products are meeting company standards and customer | |
|quality satisfactions. | |
|M/V PROJECTS HANDLED | |
|M/V Project No. 14 " KAPTANOGLU - 114,000 MT DWT Crude Oil Tanker " | |
|Draft (scantling) : 14.97 m | |
|Length Overall : 250. 0 m | |
|Length Between Perpendiculars (LBP) : 239.0 m | |
|Breadth : 37.3 m | |
|Owner : KAPTANOGLU Shipping | |
|Classification Society : Lloyd's Register (LR) | |
| | |
|M/V Project No.19 " CMA-CGM Africa 4 - 3600 TEU Class Container Carrier " | |
| | |
|Draft (scantling) : 12.0 m | |
|Length Overall : 228. 0 m | |
|Length Between Perpendiculars (LBP) : 217.3 m | |
|Breadth : 37.3 m | |
|Owner : CMA -CGM | |
|Classification Society : Bureau Veritas (BV) | |
| | |
|M/V Project No.18 " CMA-CGM Africa 3 - 3600 TEU Class Container Carrier " | |
| | |
|Draft (scantling) : 12.0 m | |
|Length Overall : 228. 0 m | |
|Length Between Perpendiculars (LBP) : 217.3 m | |
|Breadth : 37.3 m | |
|Owner : CMA -CGM | |
|Classification Society : Bureau Veritas (BV) | |
| | |
|M/V Project No.52 " HCM New Mighty - 180,000 MT Bulk Carrier " | |
|Draft (scantling) : 16.5 m | |
|Length Overall : 292.0 m | |
|Length Between Perpendiculars : 283.0 m | |
|Breadth : 45.0 m | |
|Owner : Hsin Chien Marine Co., LTD | |
|Classification Society : Nippon Kaiji kyokai (Class NK) | |
| | |
|M/V Project No.57 "MPC - 180,000 MT Bulk Carrier " | |
|Draft (scantling) : 16.0 m | |
|Length Overall : 292.0 m | |
|Length Between Perpendiculars : 283.0 m | |
|Breadth : 45.0 m | |
|Owner : MPC | |
|Classification Society : Det Norske Veritas (DNV) | |
| | |
| | |
| | |
|POSITION: Electro Technical Officer Cadet/Marine Electrician | |
|March 2012 - August 2012 | |
|COMPANY NAME: Wartsila Land And Sea Academy | |
|Subic Bay Freeport Zone, Subic Zambales | |
|COMPANY NATURE: MARINE TRAINING SCHOOL/ENGINE MANUFACTURER | |
| | |
|JOB DESCRIPTION: | |
|Five months contract to undergo structured training under the program of | |
|WARTSILA which covers maintenance, repair and installations of Electrical, | |
|Electronic, Instrumentation and Automation Parts and systems in power plants | |
|and ships. | |
| | |
| | |
|POSITION: Manufacturing Lead Technician-Production Operator | |
|April 28, 2008-June 2009 | |
|COMPANY NAME: SUNPOWER MANUFACTURING CORPORATION | |
|Laguna TechnoPark, Binan Laguna | |
|COMPANY NATURE: SOLARCELLS MANUFACTURER.. | |
|N | |
|JOB DESCRIPTION: | |
|Manufacturing Lead technician/Machine Operator | |
|Ensures production downtimes are properly recorded and attendance on commit. | |
|Monitors and record the performance of the machine and evaluates the data | |
|gathered. | |
|Perform minor Tool Set-up and machine adjustment | |
|Perform preventive maintenance, calibration and operation adjustment of the | |
|machine/equipment. | |
|Take lead role in improvement progress like SPC(Statistically Processed | |
|Control) and 5's. | |
| | |
| | |
| | |
| | |
| | |
| | |
|Trainings and seminars | |
| |. WARTSILA LAND AND SEA ACADEMY Trainings, Topics and Course Completed | |
| |Subic Bay Freeport Zone, Zambales | |
| |March 2012 - August 2012 | |
| |-Basic Engine Room Training | |
| | | |
| |-Crane Maintenance and Troubleshooting | |
| | | |
| |-Marine Auxiliary Equipments Operation and Maintenance | |
| | | |
| |-Marine Electrician Routines Familiarizations | |
| | | |
| |-Steering Gear and Thruster Operation and Maintenance | |
| | | |
| |-PC Operation and Networking | |
| | | |
| |-Maritime Navigation and Communication Equipment Operation and Maintenance | |
| | | |
| |-Pre-Trip Inspection-Reefer Containers | |
| | | |
| |-Refrigeration Principles and Applications | |
| | | |
| |-Programmable Logic Controllers | |
| | | |
| |-Electric Motors Operation and Controls | |
| | | |
| |-Instrumentation and Automation Principles and Applications | |
| | | |
| |-Hydraulics and Pneumatics Principles and Applications | |
| | | |
| |-Electrification Course | |
| | | |
| |-Marine High Voltage Training | |
| | | |
| | | |
| |. AUTOMATION | |
| |Sacred Heart Center,Saint Mary's University-Bayombong Nueva Vizcaya | |
| |August 24, 2005 | |
| | | |
| |. FIRE PREVENTION, SUPPRESSION AND SAFETY | |
| |AVR1-Saint Mary's University | |
| |Bayombong, Nueva Vizcaya | |
| |December 7, 2005 | |
| | | |
|personal data | |
| |Born in the Province of Nueva Vizcaya, Philippines on January 15, 1984. | |
| |Single, Filipino citizenship, Roman Catholic. Above-average communication | |
| |skills, fluent in English and Filipino. Willing to be trained for personal | |
| |and productive development of this firm. Dependable, analytical and | |
| |hardworking. Can work under pressure with minimal supervision. | |
|References | |
| |ENGR. CRISANTO AGUSTIN |ENGR. HERBERT CARIAGA | |
| |Electro Technical Officer |SUNPOWER MANUFACTURING PHIL. | |
| |Redeerie Bluestar Gmbh |LIMITED | |
| |Cell number: +639********* |Laguna TechnoPark, Binan Laguna | |
| | |Cell number: +639********* | |
| | | | |
| |MR. ROGELIO MOZO | | |
| |Classification Society Surveyor | | |
| |Lloyds Register of Shipping | | |
| |Makati, Philippines | | |
| |Cell number: +639********* | | |
| | | | |
Certified True and Correct,
Jear Puno-ece