PROFESSIONAL RESUME
Of
ELVIS M. FAJUTAGANA
A summary of more than 20 years of continuous extensive experience in the field of mechanical and structural engineering practices. Majority of the role held is in Quality Control and Monitoring inspection for various industries to name the few; refineries, petrochemical ,power generating plants ( such as Hydro power plant,coal fired, diesel powerplant )with more focus in the Oil & Gas sector manufacturing, construction,fabrication & installation facilities . With broad experiences in the fabrication,installation and hook-up/tie-in for offshore platform facilities, jackets(4,6 and 8 legged assembly) topsides modular platforms, decks and sub – sea pipelines.
Good knowledge in using international codes and standards, company procedures and specifications.
The enclosed CV will show that in addition to these broad experiences I mentioned above, I have possessing necessary qualifications which I’m sure could be used to advantage and benefit for working in your company.
Very Truly Yours,
Elvis M. Fajutagana
Registered Mechanical Engineer
PMP- Certified
AWS- Certified Welding Inspector
CSWIP – 3.2
NACE- CIP LEVEL 2 Certified
ELVIS MORES FAJUTAGANA
Address : Balimbing,San Pascual, Batangas
Philippines
Mobile No. +971-050-237-8661 (U.A.E.)
+63-919-***-**** (Phils.)
e-mail : ***************@*****.***
PERSONAL DETAILS:
Full Name : ELVIS MORES FAJUTAGANA
Date of Birth : December 09, 1966
Place of Birth : Labnig, Corcuera, Romblon, Phils.
Nationality : Filipino
Marital Status : Married
Sex : Male
Health : Excellent
Passport No. : EB3312632
PROFESSIONAL QUALIFICATIONS:
• Registered Mechanical Engineer - RME
Phil. license No.….....042855
• Project Management Professional - PMP ( Certified )
PMP No…………….. 0448328
• Certified Senior Welding Inspector – CSWIP 3.2
Certificate No………14499
Certified Welding Inspector _ CSWIP 3.1
Certificate No……… 5078
• Certified Welding Inspector _ AWS-CWI ( former )
Certificate No….......96041551
• NACE Coating Inspector Level 1 – NACE CIP 1 Certified
Certificate No….. 38087
• NACE Coating Inspector Level 2 – NACE CIP 2 Certified
Certificate No……38087
• Certified NDT level II…………… ( RT, MT, PT )
• Qualified SAUDI ARAMCO QC Supervisor ( Offshore and Onshore )
SAP no. …………….70007630
Resume of Elvis M. Fajut…( Cont’d..2 )
DATE
EDUCATION:
Trainings & Courses attended :
March 17 - 29, 2012
Oct.02 - Dec. 11, 2009
Oct. 2 - Oct. 21, 2007
April 2006 - May 2006
Feb. 2007 - May 2007
Jan. 2007 - March 2007
June 2006 - Aug. 2006
Nov. 2003 - Dec. 2003
July 2001 - Aug. 2001
March 1996 - April 1996
June 1993 – July 1993
NATIONAL ASSOCIATION OF CORROSION ENGINEERS-ABU DHABI- U.A.E.
NACE - COATING INSPECTION PROGRAM – LEVEL 1 & 2
CHICAGO MANAGEMENT TRAINING INSTITUTE
COST ENGINEERING – SKILLS and KNOWLEDGE OF COST ENGINEERING FIFTH EDITION.
Cambridge Educational Institute – Abu Dhabi, U.A.E.
Primavera Project Planner P3 - V3.1
Cambridge Educational Institute – Abu Dhabi, U.A.E.
A Registered Education Provider of PMI
Earned a title of Project Management Professional – PMP
FILIPINO ASSOCIATION for COMPUTER EXCELLENCE
Philippine Overseas Labor Office – Abu Dhabi, U.A.E.
• International Computer Driving License ( I.C.D.L. )
• PC ASSEMBLY
OVERSEAS FILIPINO CIVIL ENGINEER ASSOCIATION
Philippine Overseas Labor Office – Abu Dhabi, U.A.E.
• BASIC AUTOCAD
FILIPINO ASSOCIATION for COMPUTER EXCELLENCE
Philippine Overseas Labor Office – Abu Dhabi, U.A.E.
• GRAPHIC DESIGN – Adobe Photoshop & Illustrator
The Welding Institute - Abu Dhabi , U.A.E
• Senior Welding Inspection Course – CSWIP 3.2
The Welding Institute - Manila , Philippines
• Welding Inspection Course – CSWIP 3.1
Nondestructive Testing & Training Center – Al-Kbobar, K.S.A.
• AWS – Certified Welding Inspector
Oilfield Industrial Services (O.I.S.)- Masila, Rep. Of Yemen
• Industrial Radiography
June 1984 - April 1989
Resume of Elvis M. Fajut…( Cont’d..3)
EXPERIENCES :
Technological Institute of the Philippines –(T.I.P)
20th Avenue, Cubao, Quezon City, Philippines
Earned a degree in Bachelor of Science in Mechanical Engineering.
April 2003 - to date
Role
On the job responsibilities National Petroleum Construction Company - NPCC
Musaffah, Abu Dhabi, U.A.E.
Quality Control Supervisor
As Quality Control Supervisor, I ensure that the implementation and overseeing of applicable standards and quality procedures, the product requirements, and its compliance are being followed. (see attached synopsis )
March 1999 – March 2003
Role
On the job responsibilities
Whessoe, Philippines Construction Inc. – WPCI
Makati City , Philippines
Held a various positions namely; Project Engineer, Welding Engineer and Head of Quality Control in which varies from project to project requirements. (see attached synopsis)
Oct. 1997 – June 1998
Role
On the job responsibilities
PT. Transalindo Eka Persada
Batu Ampar, Batam , Indonesia
Head of Quality Control
As Head of Quality Control, I am in-charge of Quality Section with a team of 30 QC inspectors and engineers working hand in hand to ensure that the implementation of the applicable Quality procedures, codes, standards, project specifications and requirements has been adhered to.
Apr. 1995 – June 1996
Role
On the job responsibilities
Belleli Saudi Heavy Industries
Kingdom of Saudi Arabia
Welding Inspector & Laboratory Technician
A Welding Inspector and laboratory technician who assisted the laboratory supervisor in the preparation of all laboratory activities. ( see attached synopsis.)
Apr 1994 – Nov. 1994
Role
On the job responsibilities Engineering Equipment Inc. (Phils.) - EEI
Batangas city, Philippines
Welding Inspector
Worked as a QC Welding Inspector for the fabrication and installation of structural components and power piping for Pilipinas Shell Petroleum Refinery Company.
Consolidated Construction Intl. Company ( C.C.I.C.)
(Masila – Republic of Yemen )
Structural and Pipe Fabricator
Primary job responsibilities was the fabrication and installation of structural components, power piping above and underground pipelines for Central Processing Facility project.
Resume of Elvis M. Fajut…( Cont’d..4)
May 1989- March 1993
Role
On the job responsibilities PH Engineering Works & Machine Shop
San Pascual Batangas , Philippines
Charge hand Fabricator
Involved in various shut down modifications and fabrication of piping and structural services for Caltex Refinery – Batangas
SYNOPSIS OF WORK EXPERIENCES
Role
On the Job responsibilities
Resume of Elvis M. Fajut…Cont’d…5 )
As Quality Control Supervisor
• Direct, supervise and participate in Quality Control
activities to determine product conformity to customer
specification through independent inspection and tests
in accordance with the Project Quality Plan.
• Liaise with QC/NDT/Certification/Welding Engineering and customer to ensure that Quality problems are addressed and technically resolved.
• Identify non conformity for rectification and assure final
resolution.
• Conduct QA audits to verify practice is compliance to project specific procedures.
• Initiate Quality Planning for the project to assure compliance first time through proactive and preventive measures and consult with the Project Quality Manager concerning prevention and appraisal resources and the effectiveness of project Quality Plan/Procedures necessary to achieve the product quality.
• Initiate evaluation for non conforming items.
• Develop Project Quality Plans, Inspection and test Plans in
consultation with Project Quality Manager.
• Appraise product quality in accordance with the Project Quality Plan, Inspection & Test Plan and determine conformity and non-conformity.
• Assess the manpower requirements during the project execution as per the schedule and the progress.
• Co-ordinate interface with Operations, Certifying Authority,Client, and subcontractor assuring conformity to project specifications.
• Verify QC welding Inspectors effectiveness through random audits.
• Exercise proactive approach in prevention of a problem by
interface with production, engineers and management
personnel.
• Conduct internal audits to assess the effectiveness of QualitySystem outlined in Project Quality Plan and Inspection Test Plan onboard the barge and in preparation prior to mobilisation.
• Liaise with customer representatives for ensuring product
conformity and stage release for each activity denoted
within the Project Quality Plan/I.T.P.
• Ensure that inspection stages are carried out in line with approved inspection plans and/or procedures.
• Maintain records for inspection and test status and for stage and final inspections and tests.
• Review periodic reports covering the relevant inspection activities and the resultant observations.
• Experienced in offshore works activities such as pipelaying,hook-up, tie-in and installation of top sides modular platforms and jackets.
• Performed punchlisting and walkdown of outstanding items prior to Hydro testing.
Role
On the Job responsibilities
As Project Engineer
• Reporting directly to project operation manager for the execution and implementation of the projects deliverables.
• Ensure that works has been carried out safely and efficiently in a competent manner.
• Conduct orientation and toolbox meeting to ensure safely and security of all construction activities and workers.
• Direct and manage project team, tracking team member’s performance, resolving issues to enhance project performance.
• Coaching project team members the importance of complying with the applicable Quality standards and project requirements to ensure the project deliverables are completed to the satisfaction of stakeholders.
• Monitor daily work progress against planned schedule.
• Preparation of Work packages for Hydrotesting.
Role
On the Job responsibilities
As QC Head
• Develop Project Quality Plans, Inspection and test Plans in
consultation with Project Quality Manager.
• Appraise product quality in accordance with the Project Quality Plan, Inspection & Test Plan and determine conformity and non-conformity.
• Assess the manpower requirements during the project execution as per the schedule and the progress. Develop and retain understanding of project quality requirements as defined in the project specifications and applicable codes and standards.
• Working hand in hand with a team of QC inspectors and engineers for the implementation of quality procedures and standards.
• Monitor work in progress and the consistency of
procedures application
• Reviewed NDE procedures submitted by sub-contractors
• Evaluate weld radiographic films submitted by NDE – Sub-contractors.
• Ensure that manufacturer data reports are filed progressively and in timely manner.
• Reviewed final documents prior to submission to client/customers.
Role
On the Job responsibilities
Resume of Elvis M. Fajut…Cont’d…6
As Welding Engineer
• Coordinate with the Project manager for the relevant materials to be used for the project and what product requirements needed to be delivered to the customer.
• Prepare welding procedure and specifications
• Performed weld procedure qualification testing.
• Performed and witnessed welder performance and qualification testing.
• Witnessed mechanical and destructive testing for PQR and welders qualification.
•
• Conduct welding inspection crash course for the enhancement of QC inspectors and welders regarding the importance of producing a quality sound welds.
• Monitor with the QC inspectors that the relevant welding procedure requirements has been implemented in the worksite.
Role
On the Job responsibilities
As Laboratory Technician
Prepared mechanical testing plans such as:
• Welders qualification test
• Welding qualification procedure
• Material testing.
Performed mechanical testing that includes :
• Tensile test – using Dartec Universal Testing Machine
• Compression testing
• Impact Testing
• Macro and Micro Hardness Test
• Portable hardness test
Other test and calibration performed
• Pressure gauge and charts calibration
• Periodical instrument calibration
• Ferrite checking
• Surface roughness checking
• Conduct PMI -Positive material identification.
• Chemical etching.
• Prepare relevant documents and mechanical test reports
Role
On the Job responsibilities As a Structural Fabricator & Pipe Fitter
• Involves in the fabrication of pipe spool and installation of power piping and pipelines
• Fabricate pipe spools according to the relevant isometric drawings
• Fit-up,install pipes,erect pipe racks and other pipe supports.
• Cutting and beveling of pipes as per the required drawings.
OFFSHORE PROJECT INVOLVES:
MAY-NOV.2004 QC- INSPECTOR - SAUDI ARAMCO- KSA (ABU SAFAH FIELD )
Onboard DEEMA,AHMED rigs for the Tie-In and Hook-Up of Risers
and various pipe sizes for platforms ABSF TP-2, ABSF 10/15,
ABSF 17/22, ABSF 90 and ABSF 100.
FEB-MAY 2005 QC- INSPECTOR -TOTAL-ABK–ABU DHABI U.A.E.(ABK FIELD )
Onboard rig KAMIKAZI and SEP-350 barge for the installation &
Hook-Up of NKKP jacket, top sides modules, NKKP-KPP bridge
And HP flare.
JULY- SEPT 2005 QC- INSPECTOR - OFFSHORE KHUFF GAS. DEV.– ABU DHABI
U.A.E -UMM SHAIF & ABK COMPLEX ( OKGD PROJECT )
Onboard rig LEEN & SEP-350, barge for the installation and &
Hook- Up of TA jacket, top side module.
NOV 07 - MARCH 08 QC- SUPERVISOR -QATAR PETROLEUM/SIME DARBY –
STATE OF QATAR NORTH FIELD BRAVO -QATAR
Onboard HLS-2000 barge for the installation and & Hook-Up
of BH-D05A jacket & top side platform.
Resume of Elvis M. Fajut…Cont’d…7
APRIL - AUGUST 08 QC- SUPERVISOR - QATAR GAS LIQUIFIED LTD.
STATE OF QATAR NORTH FIELD BRAVO -QATAR
Onboard HLS-2000 & PLB -648 barges for the installation &
and & Hook-Up of WH4 & WH5 top side platform and Heli-deck.
NOV 08- AUG.2009 QC- SUPERVISOR -SAUDI ARAMCO- KSA
( MARJAN & ZULUF FIELD )
Onboard HLS-2000 barge for the installation of Jackets & Top side
Platforms for MRJN TP-5 & 6, ZULUF TP-5,6,7,& 8.
Onboard DEEMA barge for the Tie-In and Hook-Up of Risers,
various pipe sizes for platforms MRJN TP-5,6, ZULUF TP-5,6,7,& 8.
AUG- SEPT.2010 QC- SUPERVISOR - OCCIDENTAL PETROLEUM
(OXY-PETROLEUM) ISSD & ISND FIELD- STATE OF QATAR
Onboard PLB-648 barge for pipe laying of 12” & 20” pipeline.
SEPT- OCT.2010 QC-SUPERVISOR - QATAR PETROLEUM DEV.( QPD )
ISSD & ISND FIELD- STATE OF QATAR
Onboard PLB-648 barge for pipe laying of 6” pipeline.
NOV 2010- MAY.2011 QC-SUPERVISOR - ONGC - MUMBAI ( B-22 & RS-12 FIELD )
Onboard HLS-2000 barge for the installation of Jackets & Top side
Platforms for B-22 & RS-12 field development project BS-13A,
B-149A,B-22A & RS-12, N14,N18 & N20.
Onboard PLB-648 barge for the Tie-In and Hook-Up of Risers,
various pipe sizes for platforms BS-13A, B-149A,B-22A & RS-1.
JULY 2011- PRESENT QC-SUPERVISOR/INSPECTOR – ADMA-OPCO, ABU DHABI U.A.E.
PROJECT : UMMSHAIF WELL HEAD TOWER US 40/24 – INTEGRATED GAS
DEVELOPMENT PROJECT.
ZAKUM CENTRAL SUPER COMPLEX (ZCSC)CSP-PP PLATFORM
DEMOTHBALLING PROJECT-EPC
Onboard SEP-350 barge for the De-mothballing and Re-commissioning
Of Oil production facilities which includes demolition of existing
Facilities ,equipment & piping , Installation of structural extentions
new equipment & piping & refurbishment of existing vessels(
Separators & Gas Scrubbers.)
Isolation/Sectionalizing valves on 16” ring main line by Hot Tapping/
Stoppling and modification & piping Tie-ins on the existing pipelines.
Professional Memberships & International Affiliations :
• Project Management Institute
• American Welding Society (former)
• Philippine Society of Mechanical Engineers ( UAE Chapter )
• Project Management Institute ( Arabian Chapter )
• Project management Institute ( Manila, Phils. Chapter)
Reference:
Available upon request.