Address: S/o Mohd. Ateek Khan
Near of Bargad Wali, Colony - Bichhiya
City – REWA, Pin Code - 486001
State - Madhya Pradesh, INDIA
Mobile : +919*********
E- mail : ************@*****.***
CAREER OBJECTIVE
To work in a globally competitive environment on challenging assignments that shall field the twin benefits of the job satisfaction and a steady paced professional growth.
STRENGTHS
Aspiration for Continuous, Quick learning
Positive Attitude, Dedication for work
Compatible with majority working environments
Capable team member
Good Technical Skills.
PROFESSIONAL PROFILE
I have Completed my Refrigeration & air conditioning Diploma EQU. Mechanical Engineering as the stream at MAHATAMARAO JOYTIRAO POLYTECHNIC GOVERNMENT COLLEGE FROM KHANDWA (M.P.)
SUMMARY OF ACADAMIC AND PROFESSIONAL EDUCATION
Diploma in Refrigeration & Air Conditioning EQU Mechanical Engineering (as stream RAC) 3 Year
Regular M.J.P. Government Polytechnic College, Khandwa (M.P.) June 2010 71.62 %
HIGHER SECONDARY 12th 1 Year
Regular Govt. High secondary School No. 2, Rewa (M.P.) Mar,2007 58.14 %
High School 10th 1 Year
Regular Govt. Highsecondery School No. 2, Rewa (M.P.) Mar,2005 70%
PROFESSIONAL COURSE AND EXTRA SKILLS
Auto Cad course (Duration 2 month) affiliated by Perfect Technologies MEERA INFOTECH SOCIETY 2010.
COMPUTER SKILLS: Basic computer knowledge and AUTOCAD and Internet related work.
SUMMARY OF SKILLS AND WORK EXPERIENCE
Current Employer : Recently
Designation : Quality Engineer
Salary : 1.80 Lac per annum (INR) (+ Basic Salary % Bonus)
Duration : 01.06.2011 to 30.06.2012 date
Job Profile : Trainee Engineer
Project : Central Railways A.C. (All over india), Haridwar.
Central Railways air Conditioning machines made in company.
Air conditioning system installation and commissioning.
Building management system setup (i.e. Fire detection alarm system.)
A.C. system fabrication, testing and commissioning.
Project & Operation: CENTRAL RAILWATS AIR CONDITIONING
Check the all safety in factory as a Fire fitting system, factory Buildings structure.
Check the proper electricity in factory and Maintenance the D.G.
View the proper work all M/C (i.e. Cutting m/c, Banding m/c, Drilling m/c, Panching m/c, Welding m/c., Fins’ cutting m/c, Cupper pipe cutting m/c., Rain test m/c and maintenance.
View the proper insulation in A.C.
View the Diagram according Railways after made A.C.
A.C. system setup (i.e. Fire detection alarm system, Energy meter for control of electricity consumption.)
Check the A.C. electrical parts and all wiring and air conditioning calculation.
Daily planning of maintenance activities and responsible for smoothly handling qualified technicians / worker for better maintenance and operation & Make the shift schedule for technical team.
Prepared documentation AFTER testing system as required during (CENTRAL RAILWAYS) certification.
Installation Commissioning the component in A.C.
Inspected work quality of all services (HVAC, PRESS SHOP, WELDING SHOP,COIL SHOP,LEACK TEST SHOP & MEP) during and after completion of work.
Ensure all site activities carried out as per approved work procedures with safety measures.
Monitor the work progress as per the approved factory schedule and its documentation.
Electricity and HVAC load calculation as per its consumption.
Attend site co-ordination meeting for program and progress of work.
Employer : BHEL (KONARK ENG CORPORATION) BHOPAL.
Designation : Supervisor Engineer (Working as a all Air Conditioning plant)
Duration : 05.05.2011 to 10.06.2011
Job Profile : Working with maintenance team . Seismic Retrofit Project:-
Modification or relocation of ducting with insulation and inspection after completion of work.
Modification or relocation of all A.C. panel M/C working proper.
Check the all air Conditioning plant water chiller plant, air chiller plant, M/C panel A.C. Window A.C., Split A.C., Evaporating cooling cooler,Package A.C. and All maintenance work.
Prepaid the daily complain resister.
Ensure all site activities carried out as per approved work procedures with safety measures.
Attend site co-ordination meeting for program and progress of work.
Employer : Voltas ltd ( BHOPAL )
Designation : Side Engineer (Engineering Department)
Duration : 01.01.2011 to 01.04.2011
Job Profile :
Take compliance of preventive maintenance, log sheet, checklist, and machinery history card.
Maintaining routine preventive maintenance document, log sheet, checklist, and machinery history card.
Daily planning of maintenance activities and responsible for smoothly handling qualified technicians / worker for better maintenance.
HVAC System modification in layout ( Ducting, Brine / Chilled water / Hot water Pipeline and its insulation AHU.
DX unit (Direct Expansion) installation, commissioning and maintenance.
Area validation as per DQ (Design Qualification), IQ (Installation Qualification) OQ (Operation Qualification), PQ (Performance Qualification), Air balancing, Pressure balancing, Particle count and DOP test.
Preparation of standard operating procedure of HVAC System (BMS, Chiller, Cooling tower, STL - Thermal Storage System, Dehumidifier, AHU’s,) analysis of frequent break down problem and implementation of permanent solution by necessary modification.
Handling the manpower and make the shift schedule of HVAC team.
Employer : Fortek Technics Pvt. Ltd. (INDORE)
Designation : Supervisor Engineer
Duration : 1.07.2010 to 30.09.2010
Job Profile :
LIQUID PUMP REFREGERANT M/C made by this company and Installation, Commissioning, Service call and Annual maintenance visit, Performance testing and check the M/C. manually start the plant.
Check the use compressor (KIRLOSKAR COM KC1,KC2,KC3,KC4) proper working and check the NH3 leak in comp. (NH3 LEACK DETECTER) use in instruments.
KIRLOSKER compressor repairing and maintenance
Check the proper working ( Water Condenser Coil`s) water come in condenser coin on hole`s. and check the Water Tank in Water. And cleaning water tank.
Check the cold storage temperature and Level of CO2 .
Check the material ( Potato,Fortune material, Banana).
Check the proper solenoid valve, receiver tank working.
Check the all over plant start working and insulation.
WORKED ON FOLLOWING SITES (FOR HIGH & LOW SIDE WORK)
AIR PORT
Raja bhoj air port ( BHOPAL)
COLD STORG
Sabji mandhi cold storage (indore)
INDUSTRIES
BHEL ( BHOPAL), DAULAT RAM INDUSTRIES (HARIDWAR), Voltas ltd (BHOPAL), Fortek technics Pvt. Ltd. (INDORE).
DECLARATION
I hereby declare that the information furnished above is correct to the best of my knowledge.
DATE:- MAZHAR KHAN