Post Job Free

Resume

Sign in

MultiCraft Maint/Engineering

Location:
Sylacauga, AL, 35150
Posted:
November 02, 2010

Contact this candidate

Resume:

Jeff Blocker

*** ****** **** ******* ******

Sylacauga, AL 35150

256-***-****

ilqlcp@r.postjobfree.com

Objective

To secure a position that will utilize my training and experience

Education

1982-1986 Sylacauga High School

1986-1987 Alexander City Junior College

1988-1990 Jacksonville State University

Experience

April 2004-August 2009 Honda Manufacturing of Alabama 205-***-****

1600 Honda Drive, Lincoln AL 35096

Equipment Service Associate

- Troubleshoot and/or repair production equipment during mass production operations

- Done daily, weekly and monthly preventive maintenance on all departmental equipment

- Engineered and fabricated process new model lineside jigs and fixtures

- Coordinated work with contractors on outsourced projects

- Coordinated with Engineering Group on implementation of new process production equipment

- Installed, programmed and debugged all mechanical, electrical, robotic and pneumatic equipment

- Kept daily logs on equipment performance and reports on equipment downtime

- Implemented safety training for process associates on proper operation of newly installed equipment

- Troubleshooting skills and working knowledge of Rototics task (Fanuc, ABB, Motoman, Kamau)

March 2000-April 2004 BE&K Maintenance Group

Honda Manufacturing of Alabama 205-***-**** Ext. 3314

1600 Honda Drive, Lincoln AL 35096

Facilities Maintenance Technician (Multi-craft)

- During construction of plant I oversaw installation of equipment and made sure it was per customers

drawings and codes.

- Preventative maintenance on Boilers, Chillers, HVAC Units, Lift Stations, Pumps

- Troubleshoot lighting problems, Overhead Doors, Jib Cranes

- Programmed all HVAC, Chill Water and Hot Water systems into Facility Maintenance System

so it could be monitored via control room computers

- Installed,calibrated and maintained plant instrumatation.

- Programmed plant lighting systems into a time controlled program for energy consumption

- Monitored and operated air compressors and dryers for plant air system

- General breakdown maintenance that included motor, pump change outs

- High Voltage substation switching (5kv)

July 1996-March 2000 BE&K Construction Group

2000 International Park Drive

Birmingham, AL 35243

205-***-****

Journeyman Electrician

- Install Motor control centers

- Build Stress Cones, High voltage terminations

- Run conduit, pull wire and terminate

- Install lighting

- Wire up Three Phase motors

Skills

- Ability to read and interpret blue prints

- OHSA certified in Aerial lifts, Confined spaces, Fire Fighting and common work place safety

- Mig and Stick welder

- Knowledge of Word, Excel, Power Point and Auto Cad

- Ability to use shop Mill and Lathe

- Knowledge of PLC (Omron), Robotics (Fanuc) and HMI's (Omron, Proface)

- Equipment operator Fork Lifts, Bobcat, Backhoe, Lull, Aerial Lifts, Overhead Cranes

- Ability to train and supervise

- Ability to analyze and resolve problems

- Good communication skills, written and verbaly

References available upon request



Contact this candidate