Cody Bagwell
*** ****** **, *********, ** *****
*********@*******.***
Objective: Seeking to enhance the technical skills I have acquired in I&C/I&E with challenging opportunities and upward mobility in a heavy industrial setting.
Education:
Aug. 06 – July 08 Northwest Louisiana Technical College Minden, LA
Degree in Industrial Instrumentation Technology
Course included:
Practical hands-on training on the principles of operation and application of electrical, hydraulic mechanical and pneumatic control loops with their respective components: valve positioners, actuators, control valves, solenoid valves and limit switches.
Flow, level, pressure and temperature transmitters.
PLC and microprocessor installation, programming and troubleshooting of (Rosemount DeltaV DCS, Honeywell TPS/GUS DCS).
Three phase A/C motor, motor controls and variable speed drives, principles of AC/DC electricity, and solid state components, digital signal processing and circuits.
Training also included Field-Bus technology’s applications and the theory of operation in modern Plant industries.
Additional certs/qualifications:
T.W.I.C
OSHA 10
T-2 off-shore training
Professional Experience:
Dec. 10- Present Udelhoven Oilfield System Services Anchorage, AK
Start-up & Commissioning for ENI oil and gas refinery (North Slope, AK)
Complete walk downs on components of full systems
Powering up, calibrations, and system checks of all instruments and electronics
Recording all data and syncing to Dakart system
Checking all safety interlocks in all systems
Sept. 10- Oct, 2010 Mills Electric Tacoma, WA
Assisting with TA for U.S. Oil Refinery
Rebuilding of Fieldvue level transmitters
Functional loop checks of all new instruments in new unit addition and functional loop checks of other instruments in refinery.
Assisting in-house I/E techs with other needs on start-up.
Aug. 10-Sept. 2010 Turner Industries Point Comfort, TX
Assisting in Start-up of new units for Formosa plastics
Functional loop checks of new construction control systems and instruments including Yokogawa pressure, temperature, level, and flow transmitters using Honeywell 2020 loop calibrator
Repairing and rebuilding of control valves
June 10-Aug. 2010 GMHR Mandan, ND
Assisting with turnaround for Tesoro oil refinery
Functional loop checks of newly installed PLC’s on flow, level, pressure, and temperature transmitters and temperature elements.
Programming and initial setup of newly installed pressure transmitters.
Programming and initial setup of newly installed valves and Fisher DVC 6000 positioners
Nov. 09-Feb. 2010 Technical Diagnostic Services Milton, KY
Start-up & Commissioning for LG&E coal burning power plant.
Functional loop checks and commissioning of flow, level, pressure and temperature x-mtrs and complete operational acceptance testing documents.
Performed functional checks of flow, level, press and temp valves (CCI, Fisher control valves, Copes Vulcan, Elomatic with siemens positioners.)
Responsibilities also consisted of, when required, field calibrations with completed instrument calibration sheets.
Worked with Mark VI control system for the Hitachi turbine, assisting the technical advisor with function checks and calibrations.
July 09-Aug. 09 Tristar Constructors Evanston, WY.
Assisting with TA for Exxon natural gas refinery.
Functional loop checks on flow, level, temp., and pressure x-mtrs back to the house.
The checking and calibrating of Wizard pneumatic controllers and Fisher I/P’s.
Function check of valves and rebuilding actuators when needed.
Checking and calibrating of Fisher, Bailey, ITT pneumatic positioners and rebuilding and replacing them if needed also.
Jan. 09- July 09 Technical Diagnostic Services Rockdale, TX.
Performing Start-up & commissioning for Sandow 5 coal power plant
Functional loop checks and commissioning of flow, level, pressure and temperature x-mtrs and complete operational acceptance testing documents.
Performed functional checks of flow, level, press and temp valves (DVC fisher, Copes-Vulcan, ABB, Fieldvue Positioner, CCI...etc)
Digital and analog I/O signal back to Emerson Ovation DCS
Responsibilities also consisted of, when required, field calibrations with completed instrument calibration sheets.
Nov. 08 - Jan.09 Industrial Control Systems West Monroe, LA
Operational acceptance loop/functional checks and commissioning of flow, level, pressure, and temperature x-mtrs and complete operational acceptance testing documents.
Including functional checks of flow, level, press and temp valves (DVC fisher, Masonilian, Fieldvue Positioner, CCI..etc)
Digital and analog I/O signal back to Distributed Control System.
Responsibilities also consisted of, when required, field calibrations with completed instrument calibration sheets.
Aug. 08- Nov. 08 Patton Service Comp. Ruston, LA.
Instrumentation Tech/Electrician Level I
Replacing Breaker panels and relays
Running conduit and pulling and replacing wire
Calibrate, install and functional check of replaced valves.
Replace ballast’s and rewiring industrial lighting
Performing function checks on all newly installed PLC’s and instruments.
References: