RESUME
MOHAMMAD GHALIB FIRDAUS
India
Mobile: 009***********
Email: ***************@**********.***
********************@*****.***
Job Applied For: Instrument Supervisor
CAREER OBJECTIVE:
Seeking a position as an Electrical & Instrument Superintendent /
Instrument Engineer / Senior E & I Supervisor / Suitable to your
requirement where my experience, training and good work habits will be an
asset to your company.
SUMMARY OF QUALIFICATIONS
Technical Qualification : Diploma in "Electronics &
Communication"
From Al-Kabir Polytechnic Jamshedpur, India
Education Qualification : Matriculation passes from B.S.E.B
with 1st Div
SUMMARY OF EXPERIENCE
Over 15 years of experience in project management, engineering support,
erection, testing & Pre- Commissioning & Commissioning in the field of Oil
& Gas (Offshore & Onshore) Energy, Chemicals, Steam Generation, Power &
Water Treatment, Refinery, Gathering station, LNG plant and petrochemical
Industries.
INDUSTRIAL TRAINING
Training Course in process instrument control system, India.
In-house training for quality control inspectors at Dodsal Engg & Const.
(HO).
Training course on ISO 9000 quality management system.
COMPUTER SKILL
Training course in computer software application window, MS Office, Word,
excel, WIN PCS
SAFETY ACTIVITIES
First Aid, Safety Leadership, Sea Survival, PTW, JSA, H2S Awareness,IFR,
CMC, HSE Tools& Skills, Confined space Entry, Gas Testing Procedures
.
Working Experience in detail
Position: Instrument Supervisor
Employer: Dodsal Engineering & Construction
Project: Shah Gas Development Project Hameem Abu Dhabi UAE
Period: June 06, 2012 to 26 June 2013
Engineering and Project Management
Handling project activities involving working involving working out
various requirements with respect to basic engineering,detail
engineering,procurement,construction and commissioning and project
close out which includes manpower & material planning, monitoring
overall operations for ensuring timely completion.
Ensure site operation is carried out smoothly with erection
commissioning & procurement operation.
Managing resources to perform project activities in cost effective
manner.
Participating in pre shutdown safety review.
Monitoring the following field engineering functions:
Providing feedback after conducting a review of the deliverables by
engineering contractor like technical specification, P& ID, Inst
Index, control system configuration diagrams, Instrument Hookup
diagrams, Loop drawings, cable schedules, standard installation
drawings logic diagrams function block diagrams.
Review of selection of various applications.
Preparation for minor projects:
I/O list loading as per the availability of the spares in DCS and PLC
for ESD system.
Inst Index/Junction box wiring details/marshalling panel cross wiring
details/loop drawing applicable
construction assembly drawing for the project.
Position: E & I Supervisor
Employer: GS Engineering & Construction
Project: Petrokemya Jubail KSA
Period: August 10, 2011 to April 06, 2012
Responsibilities:
In charge for the supervision / construction of the part of Petrokemya
Projects. Job Includes,
Planning and scheduling of E&I Activities
Preparation of JSA and method statements for nature of the job to be
performed
Calibration of instruments like differential pressure transmitter, control
valves and PRV etc...
Installation of field instruments, main and secondary cable tray
cables laying and cable termination of instruments.
Installation of hook up Air tubing, Impulse tubing & analyzer tubing.
Erection & Commissioning of Substation Up To 6.6 KV Level, HV/LV MCC &
Switchgear Panel, CCR, RIE
Loop drawing and loop checking of instruments.
Experienced in planning, scheduling, manpower calculation Etc.
Position: Instrument Supervisor (Commissioning)
Employer: Dodsal Engineering & Construction (EPC)
Project: Steam generation & Oil & Gas Project (PDO) Oman
Period: April 02, 2010 to May 04, 2011
Responsibilities:
Carried out Commissioning activities Site Acceptance Test for the Panels,
Loop Checking, and ESD Cause and Effect logic checking
Carried out plant startup
and functional Cause & Effect Testing and Modification of it with process
department
Cold & hot transfer of existing
of process loops to new DCS, ESD, F&G systems and Anti-Surge loops
Replacement of existing DCS Operator
station with new Operator station with vendors Reports Preparation for Pre-
Commissioning activities like Pre-Walk down,Tri-Party Walk-down and Punch
List verification related to Instrumentation and Control System.
Instrument QA/QC Inspector
Employer: GPC WLL.Offshore Base Const.Co.
Project: Escravos Gas to Liquid Project (Chevron) Abu Dhabi UAE
Period: December 01, 2005 to January 10, 2010
Responsibilities :
Installation/Instrumentation Inspections respective to their PID's, HUD's
and LOD's.
Loop check packages review and witness, wiring, review of manufacturers QC
records, calibration check for field installed items, inspection of
instrumentation panel/tubing, verification of label and tag nos.,
Witness leak check of instrumentation tubing, power/signal check,
installation check on fire and gas detection instrumentation.
Inspection of DCS-ESD systems, punch listing, pre commission test
witnessing and review of final "Quality Verification Documents".
Data base, coordination and tracking of loop check folders.
Process/ derive loop status and progress reports for Management.
Red Lining & Verifying As Built Drawings.
Position: E&I Supervisor
Employer: UTS Kent LLC
Project: Power & Water Treatment Taweelah Abu Dhabi UAE
Period: January 01, 2003 to May 09, 2005
Responsibilities :
Controlling the correct mounting of the Electrical & Instrumentation and
control equipment, and supervising the related putting into running works.
Working together with specialists of Sedam and Alastom companies. Also
collaborating in the control and start up of the analysis systems, such as:
analyzers of water oxygen content, carbon oxide and carbon dioxide
analyzer, and analyzer of water conductivity.
Position: E&I Supervisor
Employer: Doha Petroleum &Const.
Project: Opql, Isnd Phase II PS 1K Project Green Field Offshore
Period: October 05, 2001 to September 10, 2002
Responsibilities :
Here, I worked for construction and mounted instrument and electrical
equipment - switchgear and MMCI, pre-commissioning and commissioning, loop
check of different types of instruments and correction, DCS systems-
FOXBORO, PLC, and SCADA.
Maintenance during Pre-start-up activities (operational Tests) and normal
operation.
Position: Instrument Foreman
Employer: S.A.Kent WLL.
Project: Rastanura Refinery Rahima KSA
Period: June 06,1999 to July 02, 2001
Responsibilities :
Here, I Worked as Instrument Foreman. Responsible for the preparation of
instrument, take off material and drawing needed in the project.
Installation of cable tray, conduit, Impulse
Tubing and Instrument air line.
Responsible for Installation & calibration of instrument, loop-checking,
megger and continuity testing of cable. Supervise termination of
primary/secondary cable and PLC panel and junction box.
Position: Instrument Technician
Employer: AL-Hassan Engg.Const.
Project: Integrated Power Station Saihrawl (PDO) Oman
Period: April 14, 1998 to April 11, 1999
Responsibilities :
Handled the complete loop checking from field to control room.
Installed RTD'S, TX'S& process tubing's.
Installation and testing of switches such as level switch and level gauges
Looked after cable lying of field instruments,
effectively calibrated all field instruments. Continuity and
meggering checking of cables.
Prosanal profile
Name : Mohammad Ghalib Firdaus
Father Name : Sarfaraz Alam
Date of Birth : 01/03/1979
Place of Birth : Sheikhpura
Gender : Male
Religion : Islam
Languages Skill : English, Hindi, Urdu
Present Address Kolkata West Bengal
Declaration
I hereby state that all the information prouder in my
curriculum vita is genuine
and correct and I am sure having given and opportunity to work your
organization, I will
apply myself certainly for the benefit of the organization and achievement
of its overall
objectives.
Your faithfully
Mohammad ghalib firdaus