Tony Cheng
*** ***** ****** ****, *******, CA 92808
Home: 714-***-****
Mobile: 714-***-****
E-mail: *********@*********.***
Experiences
Magellan Navigation, Inc..
Technical Ops. Project Manager/Lead
San Dimas, CA
June 2008 ~ Jan. 2009
* Technical Ops. Leader of high end portable auto navigation Maestro family;
* Represent Ops. Group in new product development core team and coordinate with Supply Base Management/Purchasing/Manufacturing/HW/SW for all costs/budget and manufacturing related issues;
* Initiate ECO to set up configurations and ensure BOM correctness with Document control and maintain sustaining through out product life cycle;
* Set up NPI tracker with overseas ODM vendors and/or Manufacturing Partner and ensure new products launched in time meeting FCS schedule, as well as legacy product BOM update and correction;
* Leader in weekly ODM ECO meetings and ensure ECO being executed within timeline, and transfer sustaining products to 3rd party assembly house;
* Responsible as Manufacturing Engineer’s role of responsible product lines
- Create kitting assembly instructions for manufacturing assembly partners & continous cost reduction;
- Create S/W update and rework instructions for rework validation
- Working with QA team of failure analysis and finding root causes;
Quantum Corp.
(Quantum merged Certance, previously Seagate Removable Storage Solution, in Mar. 2005)
(Certance Contractor/Product Manager Mar. 2004 ~ June 2004)
PLMS Manager / Sustaining Product Manager
Irvine, CA
June 2004 ~ June 2008
* PLMS (Product Line Management Support), communicate with all functional dept. (Ops./HW/SW/Quality) and coordinate NPI activity and enhanced product development/launch, Oversee project schedule and budget based on business strategy and requirement;
* Product configurations/BOM creation, control & maintenance responsibility and sustaining activities through life cycle. Legacy product BOM update;
* Represent Operations group in new product core team meeting and coordinate Supply Chain/Mfg/SQE/CSO/Repair groups to support multi phase exit efforts and monitor key customer qualification to ensure timely launch for FCS and meeting project budget;
* Attend Change Control Board meeting, MRB review and ECR final approval;
* Support all product related inquiries for both internal & external requests;
* Lead in Request for Product Enhancement (RPE) process and continuous improvement related to material cost and production labor;
* Work with procurement and supply chain group and position Last Time Buy component timeline and disposition.
* Supplier management of business decisions and communicate with tier suppliers of change notices;
Foxconn Electronics, Inc.
Product Marketing/Project Manager
Cypress, CA
Oct. 1997 ~ Jan. 2004
* Responsible of OEM/ODM level for PC & Communication industry. Responsible products include cable assemblies, connectors and chassis. Customers include Cisco, Dell, HPQ, IBM and Motorola, etc.
* Liaison between customers (OEM and CEM), sales and factory of both technical and business issues;
* Project oversight and management for the design, development, implementation, maintenance;
* Create and maintain product catalog; Product training and presentation to end customers on a needed basis;
* Coordinate within departments (design/die cast/stamping/overmolding/assembly) and complete projects within timeline for NPI launch;
* BOM/Configuration set up and maintenance through out life cycle;
* RFQ evaluation, cost control (process & labor time), and component selection;
* Pricing control and sales strategy; Supplier selection and co-develop products with 3rd party vendors; Logistics flow analysis & cost reduction;
* Plastics overmolding connector and cable assembly hood design experience;
* Worked with planning group for customer JIT or Kan Ban production requirement;
I/O Interconnect
Manufacturing Engineer
Santa Ana, CA
Aug. 1994 ~ Oct. 1997
* Set up connector automation assembly lines and celled cable assembly lines;
* Automation assembly machine maintenance; Tooling & fixture design;
* Create work instructions (SOP) and train assembly workers to follow procedures;
* Measure cycle time and continuous process improvement;
* Work with QA to improve processing on existing products; and help set up ISO 9002 procedure;
* Set up manufacturing procedures utilize Lean Manufacturing concept;
* Plastics housing injection molding and overmolding cable assembly hood design experience;
* Facility layout, power and conduit layout experience;
* Temp. assignment as production manager;
A&E Products
Project Engineer
Santa Ana, CA
Aug. 1992 ~ Aug. 1994
* Designed an in-house semi-automatic production machine utilizing printing, cutting, packaging and servo motors with electro-mechanical designs;
* Set up engineering department;
* Set up extrusion and cooling process;
* Designed and developed printing, cutting and packaging processes and fixture;
* Mechanical and electrical design; Tooling & fixture design; Welding and sheet metal bending process;
* Allen-Bradley PLC programming;
Education
- Master of Science, Mechanical Engineering
University of Missouri, Columbia, MO
May, 1992
- Bachelor of Science, Mechanical Engineering
Feng Chia University, Taiwan
June, 1986
Skills
* MS Office (Words, Excel, PowerPoint, Outlook)
* Lotus Notes
* Agile, Team Center PDM, Oracle
* AutoCAD, Solidworks
* Visio
Languages
* Fluent in English, Chinese Mandarin & Taiwanese