RESUME
TOHEED ANWARTOTOHEED ANWAR +971-*********
OBJECTIVES:
I am a challenge loving person, looking for a career opportunity in, but not limited to, any of fields in Telecommunication. Academic studies with my huge professional experience in reputed Telecom organizations, which helped to develop Team working skills, Administration proficiency, Verbal and written communication skills and Technical/Commercial awareness in my personality.
STRENGTHS
• Intelligent & a fast learner.
• Huge experience to work offshore.
• Positive, hard working and a self-starter.
• Highly motivated creative & energetic.
• Excellent leadership qualities.
• Good elocution and command of language.
• Technology perceptive and well informed.
EDUCATION/TRAINING:
• S.S.C., 2005– Board of Intermediate & Secondary Education, Rawalpindi Pakistan.
• Diploma in Electronics Engineering
• B.Tech Electronics (Still in Process)
• Auto Cad
• Computer Knowledge
• Corning Training [5days] : Installation of Corning Fiber Optic connectors, Network systems and cable manager systems
• Huwaei Training [21 days] : PDH, SDH, WDM equipments installation.
• Completed one day training course in Basic Fire Fighting,Gas Testing and Advanced First Aid
• PTW holder for all Dolphins pipelines.
• Two year of experience working with gas pipeline
PRESENTLY
Working as a Assistant Engineer With Intelligent Telecommunication Systems [ITS], Sharjah, UAE (Al Otaiba Group of Companies) since January 2007,
RESPONSIBILITIES:
• Consult with clients after completion of work to resolve problems and to provide ongoing support.
• Implementation of splicing and testing of long distance voice and data networks on Fibre Optics and UTP cables and Installation of related equipment.
• Responsible to arrange safety on work site and for all workers on site.
• Commissioning of the Projects.
• Presentation of Projects.
• Managing sites of Projects.
EXPERIENCE
• Manage various aspects of projects with respect to planning, site establishment, resource allocation, procurement, erection, commissioning, maintenance, as-built drawings, interfacing with clients and consultant in UAE
• Have exposure to all forms of project including maintenance, Operation, construction etc. I have also been involved with termination the fibre optics for DEWA, ADWEA, SEWA, FEWA, DUBAI CIVIL AVIATION, RTA, DUBAI MUNCIPALITY, DOLPHIN ENERGY, TABREED, DU, ABU DHABI MUNCIPALITY, DIC, DUBAL and different OIL&GAS COMPANIES in UAE.
• Over all supervision/site in-charge of various Fibre Optics projects, term contracts and major/minor shut down works of Fibre Optics, Sub Marine Fibre Optics, Power cable, OPGW and UTP cables and related equipment.
• I have been involved in commissioning of communication & data networks and maintenance of Telecom equipment in State of UAE.
• I have completed two projects in QATAR,I have spent more than eight months in QATAR.
DUBAI ELECTRICITY &WATER AUTHORITY [DEWA]
Supervision of installation of Cables, Accessories (Patch Panels, Joint Boxes, Pigtails, Patch Cords,Outdoor Jointing, Indoor Termination, Testing & Commissioning of sub station has done for the following projects.
• DEWA Water Scada Project.: Total length of the cables : 80km
Fiber Size : 24C Single mode.Contract No.CW-481,512E.512D
• DEWA Water Scada Project Total Length of the cables 132km
Fiber size : 24C ,Single Mode.Contract No : 119B
• Contract No: CE/187/04](400kv OHL for Jafza south and Bukhidra 400 / 132kv Sub stn), Total Cable Length : issued by client , Fiber Size : 12c & 24c Single mode Cables.
• Dewa- 400/132kv Bukhadra substn –Areva T & D.
• Dewa- 400/132kv Jafza substn –Areva T & D.
• Dewa- 400/132kv Dhaid substn –Areva T & D.
• Contract No: CE/409A/05](132/11kv sub stn and associated works), Total Cable Length : 85km , Fiber Size : 12c & 24c Single mode Cables.
• Contract No: CE/002E/05](132/11kv sub stn and associated works), Total Cable Length : 52km , Fiber Size : 12c & 24c Single mode Cables.
• Contract No: CE/002G/05](132/11kv sub stn and associated works), Total Cable Length : 56km , Fiber Size :24c Single mode Cables.
• Contract No: CE/002F/05](132/11kv sub stn and associated works), Total Cable Length : 16km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/323B/05](132/11kv sub stn and associated works), Total Cable Length : 53km , Fiber Size : 24c Single mode Cables and 32c OPGW cables.
• Contract No: CE/300H/05]Total Cable Length : 98km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/300G/05](132/11kv sub stn and associated works), Total Cable Length : 28km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/024C/05](132/400kv/11kv sub stn and associated works), Total Cable Length : 34.8km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/300H/06], Total Cable Length : 42km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/300F/06], Total Cable Length : 40.2km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/455B/06], Total Cable Length : 17.20km , Fiber Size : 24c Single mode Cables..
• Contract No: CE/299C/07], Total Cable Length : 7.6km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/107C/07], Total Cable Length : 42.2km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/327D/07], Total Cable Length : 46km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/4481/07], Total Cable Length : 75km , Fiber Size : 24c Single mode Cables.
• Contract No: CE/448H/07], Total Cable Length : 53km , Fiber Size : 24c Single mode Cables.
ABU DHABI WATER & ELECTRICITY AUTHORITY [ADWEA]
Scope: Supervision of installation of Cables, Accessories (Patch Panels, Joint Boxes, Pigtails, Patch Cords,Outdoor Jointing, Indoor Termination, Testing & Commissioning of sub station has done for the following projects
• Water Supply to Saadiyat Island [N-2622.1]
• 400/132/22kV at Saadiyat Island [Siemens PTD H]
• DN1000 Transmission Pipeline from Sweihan to Remah [N-4604]
• New 400/132kV Grid Station at Fujairah [N-3237]
• TRANSCO CONTRACT No N-3273 – Power Supply to Delma Island Lot – 1: New 220/132kV Substation at Shuweihat and New 132/11kV Substation at Delma Island and Associated Works.
• TRANSCO CONTRACT No. N-4263.1B – New 132/33kV GIS Substation in Khor Khwair.
• W16 Substation (11kV & 132kV SCMS) for ABB T & D
• G1408 – Five (5) New 33/11kV Primary Substations with Associated 33kV Overhead lines & 33kV Cables for ABB T & D
• N4623 - 400/132kV Grid Station at Ras Al Khaimah(Lot 1 A) for Toshiba
• 01743-C-1204 for Utility Substation Modification Al-Dar-10, Khalifa – 2 for Siemens LLC
ROAD TRANSPORT AUTHORITY (RTA)
Project: Fiber Optic Cabling Work for ITS., Contract No: T-124
• Scope: a) Removal of ITS Gantries; Testing before Removal of Lane Control Signs, Speed Control Signs & RVDS Signs; Cut-off of power supply from Feeder Pillar to Outstation Cabinet; Pulling back of Power Cable from Feeder Pillar to Outstation Cabinet; Pulling of Power and Data Cable from Signs; Tag and Coil disconnected Cable and Secure them; Removal of Outstation Cabinet; Packing and Logistic transport to the Contractor yard.
(b) Reinstallation of ITS Gantries; Mechanical & Electrical Installation of Lane Control Signs, Speed Control Signs & RVDS Signs; Supply, Installation of Fibre Optic Cable, Data Cable and Power Cable along with their respective accessories.; Supply of FO Switches: Modification of Existing Cabinet to accommodate additional devices; Testing and Commissioning of Complete Cable Network and Installed Devices.
Project: Comprehensive Improvement of Al Ittihad Road – Phase 2., Contract No: R885
• Scope: Removal and the installation of Gantries,Fiber optic Networking,Installation of Signs, Commissioning and testing.
Project : CSS/BUF/868- Fiber Optic Cable Works for Connection for New RTA HQ
• Scope of Work includes Supplying,Installation and testing of Fiber optic backbone communication system complete including splicing,termination & Testing and all required for constructing a passive network.
TAWEELAH FUJAIRAH GAS PIPE LINE PROJECT
DOLPHIN
Supervision of installation of Cables, Accessories (Patch Panels, Joint Boxes, Pigtails, Patch Cords, Outdoor Jointing, Indoor Termination, Testing & Commissioning .
• Scope: TFP Project requires installation and testing of Fiber optic Cables in desert and mountainous conditions.Two types of FOC’s are involved as listed below
1 24 SMF, armoured cable from TAWEELAH to FUJAIRAH control centre taweela(K P 0.0) to K P 245 QIDFA including ten control room terminations of FOC cables
Contract no UPJ-TFP-SUB-971-016-M05-006
2 24F SM 9.0/125µm,Corrugated Steel Tape Armoured Cable direct buried along the Pipe Line
3 One cable of 24F,unarmoured cable from Al-Ain Control Center(K.P 0.0) to K.P 43.0 on AFP Pipe Line and HDPE Conduit
4 Installation of telecom equipments in controls rooms of dolphins
PERSONAL DETAILS:
Name : Toheed Anwar
Date of Birth : 02-11-1986
Nationality : Pakistan
Languages Known : English, Hindi, Urdu
Contact No. : 055 - 4039543
Visa Status : Valid UAE visa till 2013
Driving License Status : Valid UAE license 2021
Email : **********@*****.***