Keith L. Tattersall
Phone: 410-***-**** E-mail: **.*******@*****.***
Career Goal: Project Superintendent
Top-performing professional with 19 years of experience as a project superintendent. Motivated leader and superintendent with outstanding personnel, technical, and safety support capabilities. Communicative problem solver who identifies needs and implements practical, cost-effective solutions.
Areas of Strength
Leadership
Proactive Management
Architect/Engineer/Owner Interface
Subcontractor Relations
Contract/Scope Analysis
Problem Resolution
Operations
Schedule & Coordination
Job Task Analysis
Quality Control
Safety
OSHA Standards
Policies & Procedures
Regulatory Compliance
First Aid/CPR • Maintain open-door management style to encourage and build trusting relationships with subcontractors, vendors, clients, and colleagues.
• On-site weekly meetings with design staff and owners to identify and resolve constructability issues.
• Direct weekly progress meetings with subcontractor superintendents to ensure milestones and objectives are met.
• Review contract documents and specific scopes to minimize risk.
• Resolve issues as they occur on site, generate RFI’s as required, contact appropriate subcontractors to ensure compliance.
• Scheduling and coordinating multiple subcontractors simultaneously supervising performance, productivity, material deliveries, staging, quality, and safety measures.
• Analyze and optimize processes, systems, and procedures; purchase select materials, and manage inventory.
• Perform routine Quality Control inspections of general work, concentrated supervision for more technical tasks.
• Investigate and examine safety concerns, policies, and procedures.
• Identify hazardous situations and underlying causes and implement preventive measures to secure public safety.
Professional Experience
Asset Construction Services LLC, Arlington, VA
Project Superintendent
Carriage House Historical Renovation, Washington DC $2M
Renovation of Historical Carriage House to include structural steel, reclaimed brick facia, concrete, new utility services, geo-thermal wells, radiant floor heating, photovoltaic solar panels, and interior space build out.
Aerotek/Dvorak Electrical Contracting, LLC, Baltimore, MD.
Quality Control Manager
Early Utility Relocation Project – Runway Extension DCA $4M
Relocation of all medium voltage feeder cables, installation of new transformers and panels, installation of new concrete manholes between ductbanks, runway lighting, FAA communications cabling, diesel generators, storm drains and associated devices. All electrical cabling (low voltage, communication and MV feeders) installed in concrete ductbanks with innerduct liners for FAA communications cabling.
Marquis Construction Inc, Burke VA
Project Superintendent
The Duke $40M
40 luxury condo units with high end finishes featuring 18 luxury townhomes over underground parking . Detailed exterior to maintain architectural continuity with the surrounding historic district. Post tension and conventional concrete decks, augured cast piles and caps foundation. Project was constructed on contaminated site, which required extensive and detailed vapor and water migration reclamation systems.
Paradigm Construction/S.E. Foster Construction
Project Superintendent
Highland Park of D.C. $70M
8 story, mixed-use residential & retail with 229 units, 3-story under-ground parking garage, fitness center, community room and billiard room. Concrete column and post-tension construction of 455,000 ft/sq. residential. Ground floor was retail space/tenant fit-out.
Smoot Construction Inc.,Washington, D.C.
Project Superintendent
Dulles International Airport $29M
26 story, 325 foot, Air Traffic Control Tower and 2 story Base Building.
Structural steel and cast in place concrete construction.
Chapin St. Condominiums $9.3M
3-story stick built high end condominiums with 1 story drive under garage. Urban infill, neighborhood revitalization project.
Dietze Construction, Chantilly, VA
Project Superintendent
715 6th St. $9.2M
12-story post tension concrete luxury condominiums, 46 units, for JBG,
Bethesda Metro Center $1.6M
100,000 ft/2 exterior renovation, brick pavers/2 water fountains and art council sculpture, hardscape and landscaping,
JD Byrider Automotive $900K
2.1 acre site development & 2- Bio-ponds, 8,000ft/2 base building /Load bearing Masonry Construction w/split face block, Offices and Service area with 5 bays.
CETROM Consulting Engineers, Gaithersburg, MD
Project Superintendent
National Institutes of Health $9.2M
3 & 7 Tesla addition to Building # 10 & Building #49 Primate Imaging Facility.
Two MRI Additions (3 Imaging suites-2 prototype), structural steel and concrete. USACE QA/CQM project
management control format.
BOVIS LEND LEASE, Bethesda, MD
Project Superintendent (CQ)
National Institutes of Health $36M
Clinical Center, Building 10 Essential Maintenance and Safety Program at NIH
National Institutes of Health $9M
NMR 1, 3 & 4 additions to Building # 10. Two MRI Imaging Facilities & 1-two story Mechanical/Electrical vault. Chemistry laboratories, research and office space.
MARTIN Mechanical, New York, N.Y. Mechanical PM
Center for Disease Prevention, Columbia University (Manhattan) $9.2M
Animal Research Facility, Biohazard Level III, 10 stories, offices, laboratories, and animal
housing.
King’s Hospital, Brooklyn Long Term Healthcare (Brooklyn) $10M
Eight story Psychiatric Tower and renovation.
City of NY, Dept. of Transportation Bus Facility (Queens) $17M
Two individual two story Bus Maintenance buildings.
Education / Affiliations
N.V.C.C./U of MD-Enrolled/Pursuing B.S.-Construction Management & Technology (CEU’s-44)
Computer Skills Summary
Microsoft Office applications, MS Project, Prolog Project Management.
Military
United States Air Force, 1976-1984 Honorable Discharge
Clearances Held
DoD TS
Coursework
USACE CQM Certification-July 2010
First Aid and CPR, 2008
OSHA 30 Hour, 2006
Refrigerant Transition and Recovery Certification, 1994
MD State Erosion and Sediment Control (Green Card) Training #10469