Post Job Free
Sign in

Senior Electrical Engineer

Location:
Dhohaa, DA, Qatar
Salary:
Negotiation
Posted:
November 10, 2011

Contact this candidate

Resume:

PERSONAL DATA

Full Name : Dharmawan Wahyu Hidayat

Address : Rawaterate RT005 RW001 No. 84

Rawaterate –Cakung JAKARTA TIMUR 13920

Phone : +620*********

: +974******** (Dhohaa-Qatar)

Default E-mail-1 : hq4gce@r.postjobfree.com

Default E-mail-2 : hq4gce@r.postjobfree.com

Place / Date of Birth : Jakarta / 30 August 1980

Religion : Islam

Marital Status : Married

EDUCATIONAL BACKGROUND

Technical High School : STMN PEMBANGUNAN (SMKN 26) Rawamangun - JAKARTA

University : D-1 Teknik Instrument – UNISMA (45 ISLAMIC UNIVERSITY) - BEKASI

: Bachelor Degree (ST) – Electrical & Power – UNKRIS JAKARTA

TRAINING & COURSE

PLC (Programmable Logic Control) Course for OMRON Type

OJT PLC and Controller of Melsec-Medoc MITSUBISHI, Alan Bradley, Micrex-FUJI ( From PT. NOK)

OJT Servo Driver and Motor Controller of OMRON, FUJI and YAMAHA Servo (From PT. NOK)

Handling, Operation, Maintenance Training for TOYOTA Battery Forklift (From PT. Traktor Nusantara)

In house Training for A-HU, Chiller and Air Cond. System (From PT. YORK)

In house Training for KOBELCO Screw Compressor (From PT. KOBELINDO)

Handling, Operation and Maintenance Training for Power Distribution, Metering and Transformer 20KV/0.42KV (From PT. Cikarang Listrindo)

In house training for Handling of Trouble Shooting Power Failure such as : HV Transformer, LV Transformer, Generator, Relay Protection System, Circuit Breaker and Disconnect Switch

(from PT. Cikarang Listrindo)

In house Training for Project Management & Budget-Cost Control (From PT. Kinden)

In house Training for Grounding System Solution (From JGC Indonesia Corp.)

In house Training for Relay Protection System (From JGC Indonesia Corp.)

In house Training for LV & MV MCC, Brand : ABB & Scheneider

In house Training for Hazardous Area Classification & Philosophy

FOREIGN LANGUAGE

Indonesian Excellent (Native)

English Excellent

Arabic Good

COMPUTER SKILL

ACAD 2008

PLC PROGRAMMABLE SOFTWARE

MS OFFICE & MS PROJECT

ETAPS

LIGHTING CALCULATION SOFTWARE : CALCULUX , LUXICON, CHALMITE

EMPLOYMENT HISTORY

PT. SAIPEM INDONESIA -E NI September 2011– Present

PT. NISCONI (Nippon Steel Construction Indonesia) May 2010 – September 2011

JGC Indonesia Corp. October 2007 - May 2010

Kinden Corp. Jakarta September 2005 - October 2007

NOK Corp. Jakarta December 1999 - August 2005

CAREER HIGHLIGHTS

Overseas Project On Going (October 2011 – Present)

Off Shore Ras Gas - Wellhead

Additional Lifeboat for Well Head 2, 3,4,5,6,7,8,9,10,11 – Ras Gas Offshore Platform

Jobs Detail :

1. MH Estimation

2. Low Voltage SLD for typical additional lifeboat and tie in for each WH

3. Retrofit PDB at each typical Well Head plan and design

4. Electrical layout design for additional lifeboat

Helium Recovery Project Ras Gas

Ras Laffan Industrial City – QATAR (October 2011 – Present)

Jobs Detail :

1. Detail Engineering for Electrical Tie Point.

2. Develope Single Line Diagram for new plant and existing Tie Point.

3. Analysis load capacity and short circuit rating bus, SWGR, and Distribution Board for tie point.

4. Prepare 6.6 Kv Medium Voltage MCC data sheet, requisition and upgrade specification.

5. Cathodic Protection calculation for additional sacrificial anode under ground for On Shore Helium Plant.

Position Held : Senior Electrical Engineer

Project at PT. Saipem Indonesia – ENI ( September 2011 – October 2011 )

FLNG - PETROBRASS

Client: PETROBRASS

FLNG Platform – Front End Engineering Detail (FEED)

Jobs Responsible:

1. Basic design FEED preparation.

2. Checker Project Specification and general requirement.

3. Checker Basic Data Sheet.

4. Endorsement and Technical Query preparation for COMPANY.

5. FEED electrical engineering manhour spent estimation.

Position Held : Senior Electrical Engineer

Project Experience at PT. NISCONI (Nippon Steel Construction Indonesia) May 2010 – 5 September 2011

SOUTH MAHAKAM (SMK) Project Platform

Client: TOTAL Exploration and Production Indonesie (TEPI)

1. Main Stupa (SP1) Platform – Detailed Engineering

Jobs Responsible:

1.a. Checker for Power System Study: Relay Coordination Study, Short Circuit Calculation, Load Flow, Cable Sizing,

Cable schedule, Battery and charger sizing.

1.b. Checker Project Specification as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

1.c. Checker Data Sheet as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System,

1.d. Prepare MTO (Material Take Off), Technical Clarification, Requisition, Technical Bid & Evaluation Report as follow :

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

1.e. Design of Hazardous Area Layout Main Stupa Platform and Ex-Equipment List

1.f. Checker Lighting Calculation, Lighting Layout and Installation Detail

1.g. Checker Overall Single Line Diagram, Particular Single Line Diagram : 400 V AC System and 24V DC system, Connection Diagram and Interfaces of Main Stupa Platform.

1.h. Checker Overall Main Stupa Platform Layout: Power & Control Cable Routing, Equipment Layout, Earthing and bonding Layout, Cable Tray Layout, Support Tray Detail Layout.

1.i. PDMS review suggestion for equipment layout of Main Stupa Platform of each level deck: upper deck, main deck, cellar deck, suspended deck and top of jacket.

2. West Stupa (SP2) Platform – Detailed Engineering

Jobs Responsible:

2.a. Checker for Power System Study: Relay Coordination Study, Short Circuit Calculation, Load Flow, Cable Sizing,

Cable schedule, Battery and charger sizing.

2.b. Checker Project Specification as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

2.c. Checker Data Sheet as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System,

2.d. Prepare MTO (Material Take Off), Technical Clarification, Requisition, Technical Bid & Evaluation Report as follow :

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

2.e. Design of Hazardous Area Layout West Stupa Platform and Ex-Equipment List

2.f. Checker Lighting Calculation, Lighting Layout and Installation Detail

2.g. Checker Overall Single Line Diagram, Particular Single Line Diagram : 400 V AC System and 24V DC system, Connection Diagram and Interfaces of West Stupa Platform.

2.h. Checker Overall West Stupa Platform Layout: Power & Control Cable Routing, Equipment Layout, Earthing and bonding Layout, Cable Tray Layout, Support Tray Detail Layout.

2.i. PDMS review suggestion for equipment layout of West Stupa Platform of each level deck: upper deck, main deck, cellar deck, suspended deck and top of jacket.

3. East Mandu (MD1) Platform – Detailed Engineering

Jobs Responsible:

3.a. Checker for Power System Study: Relay Coordination Study, Short Circuit Calculation, Load Flow, Cable Sizing,

Cable schedule, Battery and charger sizing.

3.b. Checker Project Specification as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

3.c. Checker Data Sheet as follow:

ORMAT Energy Converter (OEC), Diesel Engine Generator, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System,

3.d. Prepare MTO (Material Take Off), Technical Clarification, Requisition, Technical Bid & Evaluation Report as follow :

ORMAT Energy Converter (OEC), Diesel Engine Generator, Cable Tray, Lighting Fixtures, Power and Control

and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger,

Solar Panel & NavAids System, General Alarm System, Earthing and bonding, Lightning Protection System.

3.e. Design of Hazardous Area Layout East Mandu Platform and Ex-Equipment List

3.f. Checker Lighting Calculation, Lighting Layout and Installation Detail

3.g. Checker Overall Single Line Diagram, Particular Single Line Diagram : 400 V AC System and 24V DC system, Connection Diagram and Interfaces of East Mandu Platform.

3.h. Checker Overall East Mandu Platform Layout: Power & Control Cable Routing, Equipment Layout, Earthing and bonding Layout, Cable Tray Layout, Support Tray Detail Layout.

3.i. PDMS review suggestion for equipment layout of East Mandu Platform of each level deck: upper deck, main deck, cellar deck, suspended deck and top of jacket.

JGC Indonesia Corp. (October 2007 - May 2010)

Position Held : Lead Electrical Project

Project Completion at PT. JGC Indonesia :

1. PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA

TUBAN LPG INDONESIA

Jobs Responsible:

a. Power System Study: Relay Coordination Study, Short Circuit Calculation, Load Flow

b. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

c. MH rate calculation for Engineering & Construction

d. Design Plot Plan, Cable wiring, Layout, Cable Tray Layout, Single Line Diagram & Connection Diagram

e. Field Engineer & Construction

2. TUBAN PETRO CHEMICAL PROJECT

JAVA ENERGY GROUP, PTE, LTD. & TUBAN LPG INDONESIA

Jobs Responsible:

a. Power System Study: Load flow, Short Circuit, Motor Starting (by ETAP) – IEC Std., Load List (E-Load System)

b. Lighting Illumination Calculation (LUXICON Software)

c. Design and Project Specification, QHSE Method Statement.

d. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

e. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

3. CHEVRON Pacific Indonesia (CPI)

Detailed Engineering : Waste Water Disposal Management Project for CGS 1, 3, 5, 10, CIF

Jobs Responsible:

a. Power System Study: Load flow, Short Circuit, Motor Starting (by ETAP)- ANSI Std. , Load List (E-Load System)

b. Data Sheet checker : Power, UPS, MV & LV Power Transformer, MV & LV Motor Control Center, Power & Control Cable, Power Distribution Board, Lighting and Power Outlet.

b. Lighting Illumination Calculation (CHALMITE Software) and Lighting design arrangement

c. Checker detailed drawing and Hazardous Area Classification : API Standard 500, QHSE Method Statement.

d. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

e. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

Kinden Corp. (September 2005 – October 2007)

Position Held : Assistant Manager of Electrical Department

1. Liquid Mud Plan (LMP) Project – Halliburton & BP

Jobs Responsible:

a. Approver Specification & Data Sheet: Diesel Engine Generator, Motor Starter, Power Panel and Junction Box, Cable Tray, Lighting Fixtures, Power and Control and PE Cable, Electrical Junction Boxes, Electrical Bulk Material, Power Panel Box, Batteries and charger, Earthing and bonding, Lightning Protection System.

b. Approver Checker for Power System Study: Relay Coordination Study, Short Circuit Calculation, Load Flow, Cable Sizing, Cable schedule, Battery and charger sizing.

c. VENDOR coordinator, for Requisition and Vendor Document Submission

d. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

e. Construction and Installation

2. Shore Base (GPFSB) – KJP & BP Project (Teluk Bintuni-Papua)

Jobs Responsible:

a. Checker Load List (E-Load System) and Load demand factor Calculation

b. Checker Lighting Illumination Calculation (CALCULUX Software)

c. Checker Project Specification IEC Std. and Data Sheet: Power, Lighting, Backup Power Generation, Lighting, Cable Ladder and Tray, Earthing and Bonding, Lightning Protection, CCTV, PA-GA, Telecommunication (IP Base) and Fire System.

d. Project Estimator (Material, Cost and Labor), QHSE Method Statement.

e. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report Approver

f. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

3. Combo Dock Project – Offshore Project– KJP & BP Project (Teluk Bintuni-Papua)

Jobs Responsible:

a. Checker Load List (E-Load System), Load demand factor Calculation

b. Checker Back up Power Failure and Power Generation Design

c. Checker Lighting Illumination Calculation (CALCULUX & ITALSMEA Software)

d. Project Estimator (Material, Cost and Labor), QHSE Method Statement.

e. Checker Project Specification IEC Std. and Data Sheet: Power, Backup Power Generation, Lighting, Cable Ladder and Tray, Earthing and Bonding, Lightning Protection, CCTV , Telecommunication System (IP Base), PA-GA, UPS, Ship Shore Link (SSL) Telecommunication system for Marine and Harbor Area, Safety Emergency Control and Fire System

f. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

g. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

h. VENDOR coordinator, for Requisition and Vendor Document Submission

i. Construction, testing and commissioning

4. Jetty LNG Project, Loading and LNG terminal -Offshore Project– KJP & BP Project (Teluk Bintuni-Papua)

Jobs Responsible:

a. Checker Load List (E-Load System) and Load demand factor Calculation

b. Checker Lighting Illumination Calculation (CALCULUX & ITALSMEA Software)

c. Checker Project Specification IEC Std. and Data Sheet: Power, Lighting, Earthing and Bonding, Cable Ladder and Tray, Junction Box, Motor Starter, CCTV and Fire System

d. Project Estimator (Material, Cost and Labor), QHSE Method Statement.

e. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

f. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

g. VENDOR coordinator, for Requisition and Vendor Document Submission

h. Construction and Installation

5. Helideck Project – Offshore Project– KJP & BP Project (Teluk Bintuni-Papua)

Jobs Responsible:

a. Checker Load List (E-Load System) and Load demand factor

b. Checker Lighting line and CCTV design arrangement for Landing Helicopter

c. MTO (Material Take Off), Requisition, Technical Bid & Evaluation Report

d. Design for QHSE Method Statement and Safety In Design (SID) adopted from FAA Standard

for NavAids System and perimeter.

e. FAT (factory acceptance test), ITP (Inspection Test Plan) Inspector

f. VENDOR coordinator, for Requisition and Vendor Document Submission

g. Construction and Installation.

NOK Corp. (Nippon Oil Kogyo) - December 1999 – August 2005

Position Held : Electrical Engineer

Jobs Responsible for :

1. Designer Single Line Diagram and installation for motor starter water pump and oily pump.

2. R&D (Research and Development) Engineering and Utility Project

3. Designer Control System with: Schematic Wiring Diagram, PLC, Servo and Robotic Driver, Motor Controller analog and digital.

4. Handling of Trouble Shooting & Maintenance Utility: HV/LV Transformer, Power Generation, Switchgear, Motor Starter (MCC), Batteries and charger, inverter, compressor & drier, AHU-Chiller & Air Cond., WWT (Waste Water Treatment).

5. Handling of Trouble Shooting for Hydrulic press and pneumatic system.

6. Maintenance of gas detection and fire detection system.



Contact this candidate