Post Job Free

Resume

Sign in

lead operator

Location:
Tirunelveli, TN, 627116, India
Salary:
125$ per day
Posted:
January 25, 2012

Contact this candidate

Resume:

Resume of J.Arunkumararaja

OMAN MOBILE NO: +968********

Mobile No: +91-948*******, Land No +91-463*******.

JOB TITLE: PRODUCTION / PANEL OPERATOR.

TOTAL EXPERIENCE: 11 YEARS (GULF &INDIAN OIL & GAS FIELD)

E-MAIL ADDRESS : hkqgeh@r.postjobfree.com

:hkqgeh@r.postjobfree.com

Passport Details

Pass port No : G-2427248

Date of expire : 22/04/2017

Place of issue : Tiruchy

Status : ECNR (Emigration Check Not Required)

Technical Qualification:

Diploma in Mechanical Engineering

Training Attended in OMAN.

PDO HSE INDUCTION.

INTIAL FIRE RESPONSE.

HSE TOOLS & SKILLS.

COACHING & MENTORING.

SAFETY LEADER SHIP.

PERMIT TO WORK (PTW)

AUTHORIZED GAS TESTER.

H2S/BA AWARNESS.

Professional Training Attended in QATAR.

Personal Survival Techniques

Fire Prevention & Fire Fighting

Proficiency in Elementary First Aid

Personal Safety & Social Responsibility

H.E.U.T & Sea Survival

H2S/BA Awareness

Permit to Work system (PTW) in QPD OFFSHORE.

Confined Space Entry

Safety & Productivity

Hydrogen Sulphide – Awareness & Escape

Additional Qualification:

Computer Skills : Operating system : Windows XP,Windows 2000 ,Win95/ system package MS – Office, MS –Excel,MS – Powerpoint.

DCS : Various type of Panel Operation.

Company Designation Period Location

PDO OMAN

GS OPERATION & MAINTANANCE COMMISSIONING

PANEL OPERATOR NOV 2011 TO

TILL DATE OMAN PDO SAIH NIHADYA PHASE – 1 QAR NALAM GAS PLANT

QPD

SPIE OIL & GAS

IPEDEX PRODUCTION WELLHEAD / DCS PANEL OPERATOR. NOV2008 TO

AUG2011 QATAR OFFSHORE

ALKARAKARA FIELD.

ADCO ASAB

IMECO OPERATIONS FOREMAN AUG 2007 TO

NOV 2008 ABUDHABI

ONSHORE SAS FIELDS.

QAPCO

DOPET COMMISSIONING

OPERATOR APR 2006 TO

JAN 2007 QATAR

ONSHORE

PALEJ PRODUCTION

FACILITY

OFS

PRODUCTION OPERATOR JUN 2005 TO

FEB 2006 ONSHORE

GUJARAT

ONGC BLQ II GAS FIELD

THROUGH

RELIANCE ENGINEERS PRODUCTION

WELL HEAD OPERATOR JULY 2000 TO

APR 2005 OFFSHORE PLATFORMS

BASIN FIELDS &

MUMBAI HIGH

OIL& GAS

COMMISSIONING / PANEL OPERATOR - Petroleum Development Oman (PDO)

SNDC PHASE – 1 PROJECT.

GAS PLANT.

From November 2011 to Till date.

Working as a commissioning panel operator PDO (Qarnalam Fields) through GS Operation & Maintenance. Commissioning newly built gas plant capacity 25 MMSCM. Three phase separation (Gas,condensate and water) Mercury removal unit, GE Oil &Gas TURBO EXPANDER RECOMPRESSOR UNIT Gas dehydration and glycol regeneration system. Gas /Gas Exchangers The commissioning scope also covers instrument air and N2 generation off gas recovery unit ,Produced water degassing, wet gas separators, Complete plant operation is controlled and monitored through YOKOGAWA DCS.

Fire &Gas system. (Inter lock system), Process plant commissioning, start up and shut down, Trouble shooting and handling emergencies Loop check, Cause & Effect, Fire & Gas System) Making Co-ordination with process side. & field operation area. Preparing daily production and activities report. Monitoring instrumentation loop check & logic control controlling the production activities that are conducted in compliance of the Company HSE rules, handling emergencies shut down and plant start up. Monitoring Fire & gas system.

Saih Nihayada Gas plant Gas through put 25 MMSCMD.

Saih nihayada Gas plant – Condensate production 1000 m3/d.

48’’ Export Gas 20 MMSCMD.

Mercury Removal unit.

Gas dehydration & Regeneration unit.

Turbo Expander & Re compressor unit.

Condensate Separation units.

Gas/Gas exchangers.

Gas/condensate exchangers.

Booster compressors.

Produced water degassing units.

Distribution Control System Yokogawa.

Well Head Operations:

Well Testing, Inspection & Operation Of Christmas Tree. Flow Line Flushing Job, SSV, SSSV & strom Choke Operations. Flow line Choke changing, STHP, FTHP, Well Equalizing Well Actuation, Well Maintenance, work over, well Completion, circulation value operation, Expansion Joint Operation, Tubing Hanger Seal Leaking, Back Pressure Value Operation, Gas Lifting, Water Injection, Chemical Injection, PIG Launching & Receiving, inspection of pipelines for leakage & puncture. Well Annulus Pressure Bleeding, safety value testing, lower and upper Master value, wing value, Kill Value, Adjustable choke & crown value operation. Well opening, closing operation & Trouble Shooting etc.

Changing or Adjusting of choke to regulate flow and to give back pressure to reservoir .

Observe the annulus pressurebuildup & Annulus pressurebleeding operations.

Well activation and Optimization of gas injection wells and well head panel boart operation.

Well equalization in case of SCSSV unable to open because of high shut in pressure and operation SSV.

• Pig launching and pig receiving activities.

• MPFM testing and maintaining the unmanned well head platforms.

• Shutdown and normalizing the wells through Pneumatic control panel board namely Baker and Auto cone.

• Demulsifier and corrosion inhibitor injection in well head.

• Hand over to CTU for LIB, Tool fishing,disel pumping For well Activation.

• N2 Pumping for Activation MPLT,Well bore clean out,water clean out ,MCFLCV.

• Hand over to Reservior crew , reservoir crew for perforation,RST,Dummy Run.

• Hand over the wells to slick line crew .

PRODUCTION / DCS OPERATOR - Qatar Petroleum Development (Japan)

Al Karakara Offshore field, Qatar.

From November 2008 to August 2011.

Worked as ‘Production / DCS operator in QPD Alkaraa field Qatar offshore. Controlling the process through D.C.S. (Emerson Delta V) Consists of the following facilities Oil wells, (remote station) and Production Separators. Remove the H2S from Stripper, wash water, Disposal water system, Hot water system, Chemical injection, Disposal water, Vapour recovery compressor (zero flaring system), Main oil pumping station and fire &Gas system. Familiar in production well testing, pigging operation (Inter lock system), Process plant commissioning, start up and shut down, Trouble shooting and handling emergencies Loop check, Cause & Effect, Fire & Gas System) Making Co-ordination with process side. & field operation area. Preparing daily production and activities report. Monitoring instrumentation loop check & logic control controlling the production activities that are conducted in compliance of the Company HSE rules, handling emergencies shut down and plant start up. Monitoring Fire & gas system.

Nature of Duties:

Monitor and control process parameters for various units from Main Control Room. Take quick & safe corrective actions in case of process upsets or emergency situations in line with standing instructions.

• Monitoring and controlling process parameters in DCS. Take timely remedial actions in case of process alarms or plant upsets due to instrument/equipment failure, ensuring Safety of plant & personnel.

• Routinely monitoring the various operation in the Plant, look out for any abnormalities, fault or leak and report immediately to supervisor for initiating its repair work.

• Preparing the equipment and/or facilities shutdown for maintenance and inspection and ensuring that all necessary procedures and instructions from Plant and Safety authorities are followed as defined in the work permit. Authorize job to start. Closes work permit after testing the equipment can be put back in service.

• Logs’ operating incidents occurring in the shift and passing on the remarks to the counterpart in the next shift, discussing incidents with the Supervisor.

• Monitoring fire & gas panel and interact with field operators and fire control center during failure of any plant protection system.

• Working as a Control Room operator (Distribution Control System – Emerson Delta V).

• Monitors all plants oil&gas wellhead conditions such as flow rates pressures,temperatures,levels etc through displays ,graphics and trend logs.

• Working in 28 % of H2S concentration oil field atmosphere and the facility operating with ZERO flaring Policy

• The control of process using the EMERSON process management – DELTA V

• Adjust plant operating parameters as required, validates instrument signal and take immediate response to unusual operating condition

• Directly reporting to production supervisor

• Ensuring trouble free functioning of plant machines.

• Prepare daily production summary and daily production report.

• Preparing monthly chemical consumption pump running hours and safety report.

• Co-ordination with other departments for planning management etc.

• Ensuring work permit requirements are meet and coordinate to concerned group individual.

• Ensuring all operations is carried out with proper safety operating measures.

• Start up, shut down & trouble shooting of Gas Injection Compressor (Arial 5 stage reciprocating)

• Electrical sumerizable pump system and VSC (Variable speed control-centrilift) panel and phoniex panel data.

• Spearhead the “Kaizen Management Team” in the plant which tackles continues improvement to achieve maximum productivity.

• Witness and participate the Pre-Commissioning and Commissioning of the new Well head platform Works include punch listing, line hydro testing, and water Flushing, chemical cleaning air blowing of line with IA and Nitrogen and leak testing.

o Responsible for Distribution Control System – Emerson process management Delta V

o Oil & gas wells and Gas & water Injection well.

o Crude separation unit.

o Gas sweetening unit.

o Gas dehydration unit.

o Produced water treatment plant and injection system.

o Weather ford gas injection compressors with Allen Bradley PLC.

o Siemens Gas turbine with Allen Bradley PLC.

o Nitrogen Regeneration unit.

o Instrument air compressor package.

o Well head single and dual.

o Sea water reverse osmosis unit

o To take trial run of Equipments after clearing the work Permit .

Responsible for other duties as assigned.

o oil proving .

o Vapour recovery unit.

o Jet pumping system.

o Pigging – various sizes – Flexible and foam.

o Collecting samples & Lab analze.

o Oriface plate & Barton chart changing.

o To co ordinate with services companies.

o All type off Process and Mechanical Isolations as per PTW.

o To allow maintenance personnel after checking & monitor hot or cold work permit.

Known of lab analysis.

1. BS&W (Basic sediments and water) analysis

2. RVP (Reid vapor pressure.

3. Specific gravity.

4. Salt in crude.

5. PH of water.

Operations foremen in. ( ABUDHABI)

(ADCO )Abudhabi Company for onshore oil operations in ASAB (SAS Fields)

From Aug 2007 to Nov 2008

Worked as operation foreman with M/S ADCO (Abu Dhabi company for onshore oil operations) at ASAB (SAS Fields) as commissioning and operations foreman in their newly built oil and gas plant. Plant comprises oil well head and cluster operation, crude three phase separation (oil, gas and water) in two stages, desalting, stabilization column, vapour recovery compressors(GE Power systems), low pressure& medium pressure (Mitsubishi) and gas injection compressors (Dresser Rand), gas dehydration and glycol regeneration system. Dowthem hot oil regeneration system for reboiler, water injection, gas injection and gas lift facilities, The commissioning scope also covers instrument air and N2 generation, crude storage facilities and flare system. Complete plant operation is controlled and monitored through Honeywell Experion process knowledge system R 201 DCS.

Central Production Facility and Tank Farm

Receiving Crude from Remote Degassing Stations, Gas Boot and Slug catcher, Produced water Tank, Skimmer Tank, Storage Tank Operations. Crude Transfer pumps unit and Trouble Shooting as per Cause & Effect Logics operated Central Production Facility Capacity of 345000 BPD. Actively involved in the calculations of daily productions, Weekly and monthly reports, Production test, Work sheet, And Work permit procedures.

• Oil production rate is 345000 BPD.

• Reporting of Production Supervisor on daily activities and work progress.

• Execute field production operation activities according to schedule / plan.

• Area authority and valuator for permit to work activities with in area of responsibility.

• Handling Production & Test Separator, Export and metering system.

• Maintain of BS&W & RVP.

• Chemical injection.

• Open and close wells at wellhead or through Console. Change and adjust production rates as instructed.

• Experienced in Water treatment plant of 270,000 bpd of treated water.

• Participate in Pig launging and receiving operations.

• Involved in commissioning and oil stabilization, gas dehydration (TEG), gas compression units and well head operations which containing oil producing wells, gas and water injection wells, gas lift wells.

• Observation of parameters on wells, operating hydraulic control; panels.

• Arranging on line well performance test using multi phase flow meter on cluster.

• Involved in well surveillance team to maintain optimum production on oil wells and ensuring safe operating procedures.

• Handling of fixed and adjustable chokes.

• Preparing safe work permit for maintenance activities and generating daily reports

• Authorized for permit to work system. I am authorized to fill and issue all types of permits .I am well conversant with safety management in oil and gas facilities.

Fire &Safety:

Knowledge of fire and safety system ,deluge valve, sprinkler system, Monitors,fusible loop shutdown,Smoke detectors,Gasdetectors,Hydrants,Experience in the operation of fire extinguishers like foam ,DCP (25Kg),CO2 (10Kg) and familer with breathing apparatus,fire and gas sirens,abandon alarms,life boat,liferaft,Scramblenet,swing ropes,lifebuoy,desautel water sprayer,eye washer, etc.

H2S Safety, Fire safety, using crow can gas tester (CH4, H2S), fire Extinguisher (Foam, DCP & CO;) using in fire classification, fusible plug operation, deluge valve operation, fire-water pump operation. Breathing Apparatus, Safety Jacket, Gas detector. Smoke detector, heat detector operation, H2S deduction, fixed monitoring system.

JOB DESCRIPTION:

Main Duties and Responsibilities

To prepare Daily Report and send to Production Supervisor.

To make well test according to schedule to prepare report and send to production Supervisor.

To maintain production target according to Well management Data Sheet.

Everyday closely monitors all plants, well head conditions such as Flow rates, pressures, Temperatures, levels, Flow rates of Production, Gas Injection rate and water injection rates checking through Trends, In case of any changes found immediately inform to Production Supervisor and take action as per advised.

To operate the plants Fire and Gas detection and fire production system.

To follow PTW System.

If necessary to contact Tool Box meeting according to work permit.

To report immediately any unexpected events this may affect the Plants or equipments.

In Emergency situations ensures the safe Shutdown, Isolation and blow down of relevant plant.

Every day to check all Chemical injection rates, If needed to adjust the flow rate accordingly.

To maintain Water injection / Gas Injection rate as per Target.

To get proper hand over from opposite Shift.

To maintain inhibition log and send report to Production Supervisor.

Ensure All LTI in proper position.

To check all open and closed tags for every 3 months.

To preserve all valves with grease.

Personal Profile:

Name : J.Arunkumararaja

Father’s Name : S.Jeganvasanthakumar

Date of Birth : 22/06/1982

Nationality : Indian.

Languages Known : English, Hindi, and Tamil & Malayalam.

Martial Status : Married.

Address : NO 11/10 , Raja Joseph Colony,

PALLAVARAM

CHENNAI 600 043,

Place : OMAN J. ARUNKUMARA RAJA



Contact this candidate