Over 25 years experience in project controls including construction, manufacturing, program development, system validation, remediation, demolition, waste management and environmental restoration.
Experience
• Project Controls Consultant
DJC Consulting, LLC. - Arvada, Colorado
2007 - Present
Maintain in-progress project schedules and proposal schedule development for Envirocon, Inc., and the S. M. Stoller Corp. Supported the proposal team in the developement of resource and cost loaded schedules for EnergySolutions / Washington Group / Tetra Tech (EWT) for a major Department of Defense project. Maintained in-progress project schedules and developed new schedules for can manufacturing production lines and facility expansions at Ball Container Corp.
• Senior Scheduler
Range Fuels – Broomfield, Colorado
2008 – 2009
Senior scheduler for the development and maintenance of resource loaded project schedules for the construction of a Biomass Ethanol Plant, prepare critical path analysis and earned value reports for management and DOE reporting. Prepare Standard Operating Procedures for scheduling and change control processes. Monitor subcontractor’s fabrication schedules for accuracy and impacts to overall project schedule.
• Senior Scheduler/Cost Analyst
Envirocon, Inc. - Golden, Colorado
2003 - 2007
Developed resource loaded schedules, cash flow curves, and earned value curves for proposal schedules. Maintained in-progress project schedules by gathering information from field observations and internal accounting documentation. Followed reporting guidelines for schedule and cost submittals to Department of Energy, Department of Defense, State and Local agencies. Tracked newly awarded projects at various levels of detail to satisfy the client’s reporting needs for earned value reporting, variance reporting, schedule and cash flow reviews. Introduced Primavera Enterprise for Construction (P5e/c ver. 5.0) to operations personnel and conduct training sessions for field personnel. Prepared project baseline schedule and cash-flow curve procedures and training presentation for implementation of Standard Operating Procedure Manual (SOP).
• Project Controls Analyst/Scheduler
Rocky Flats Environmental Technology Site - Golden, Colorado
• MACTEC, Inc. – 2002-2003
• Rocky Mountain Engineering Group – 2001-2002
• Los Alamos Technical Associates, Inc. – 1997-1999, 2000-2001
• Rocky Mountain Remediation Services – 1994-1997, 1999-2000
• EG&G –1992-1994
Scheduler/Cost Analyst for the Department of Energy Rocky Flats Environmental Technology Site. Developed an interim cost tracking system for the Solar Ponds Remediation Project. Prepared monthly program budget reviews for Environmental Restoration, Waste Management, Rad Safety, and Construction. Tracked leased labor program costs and prepared trend analysis graphs for monthly reviews. Prepared baseline change proposals and power point slide presentations. Developed schedules and tracked costs on the Sludge Removal Project. Utilized real time data to identify trends, create graphs, and incorporate summary reporting. Prepared a resource-loaded schedule for the demolition of all site buildings. Verified subcontractor invoices and approved purchase requisitions as a Contract Technical Representative.
• Program Master Scheduler/Cost Analyst
McDonnell Douglas Corp. – Long Beach, California
1985 – 1992
Department of Defense C-17 Air Lifter Development
Program master scheduler for the Department of Defense C-17 Air Lifter development program. Tracked vertical and horizontal schedule integration for the support equipment program. Provided monthly status of work packages and analysis of variances to program management in support of monthly, quarterly and ad hoc budget reviews. Developed monthly estimate to complete reports. Prepared baseline change proposals as required.
MD-80 Aircraft Program
Cost analyst for the MD-80 aircraft program. Verified data integrity including budgets, estimate to complete, and actual costs incurred, and made corrective action recommendations to project management. Supported three program clients in tracking the manufacturing and delivery of aircraft; Swiss Air, Air Italia, and the China “kit” program. To facilitate the delivery and assembly of the semi-assembled MD-80’s for the Chinese, Mr. Cowen was tasked with the development and presentation of a training program for project controls. He successfully worked through an interpreter to meet his course objectives.
• Scheduler
Rockwell International – El Segundo, California
1981 – 1985
Department of Defense B-1B Bomber Program
Scheduler for the Department of Defense B-1B Bomber program during its re-start phase. Responsibilities included the development of schedules for the manufacturing of priority and destiny critical parts. Assisted in the departmental loading of the numerically controlled 3 & 5 axis machines. Developed schedules and tracked costs for the tooling division as the development program moved into the production phase.
Education
• B.S., Business Administration, Regis University (In Progress)
Training
• Radiological Worker II
• Primavera Project Planner ver. 3.3
• Primavera Enterprise ver. 6.1
• Microsoft Office Suite (Word, Excel, Project)
Certifications/Affiliations
• Beryllium Worker Certified
• Work Package Manager Certification
References