Post Job Free
Sign in

Power Plant Project

Location:
BATANGAS, Central Luzon, 4200, Philippines
Salary:
400 USD per day
Posted:
June 05, 2012

Contact this candidate

Resume:

CARLOS JR DELA ROCA

Blk ** Lot ** El Sitio, Dumantay, Batangas City, Philippines

Celfone No. +639********* / +65 84251253

e-mail: **************@*****.***

MAJOR QUALIFICATIONS

• Degree in Bachelor of Science in Electrical and Mechanical Engineering

• Strong background in preparing estimates for materials, labor and equipment for construction projects and ensuring that the project is within company’s standard and specification.

• Solid experiences in Electrical and Instrumentation Construction, Commissioning and Maintenance Activities including Intermediate Shutdown Works.

• Has good analytical, communication, leadership and management skills.

• Pass COMPEX Course

• BOSET training completed

EDUCATIONAL BACKGROUND

1999 – 2000 Bachelor of Science in Mechanical Engineering

Golden Gate Colleges, Philippines

1989 – 1996 Bachelor of Science in Electrical Engineering

Golden Gate Colleges, Philippines

PROFESSIONAL EXAMINATION TAKEN

Registered Mechanical Engineering (Passed)

Registered Electrical Engineering (Passed)

Registered Master Electrician (Passed)

Industrial Electrician – National Certificate (Passed)

WORK EXPERIENCES:

ELECTRICAL AND INSTRUMENTATION ENGINEER (CENDOR MOPU Offshore Project)

Mechanical Completion and Commissioning Services (MCCS)

Kuala Lumpur Malaysia

October 2010 – present

Co-ordinate and supervise commissioning and construction work teams and plan future work program for Gas Lift Compressor for CENDOR MOPU Offshore Project./ Conduct implementation, general supervision and site inspection of the on-going projects. / Monitor daily work activities if approved construction drawing is implemented and follow as per acceptable engineering standard and specification. Ensure the safety of hazardous areas / Assess and minimize risks associated with working on Hazardous Area / Assess all risks before commencing work and have safe work practices. Follows up the introduction and progress of punch lists through all phase completion dossiers. Develop management commissioning philosophy, strategy, methodology and planning. Responsible for develop commissioning schedule and optimum commissioning sequencing.

ELECTRICAL SUPERVISOR

Aseng FPSO, SBM Offshore

Keppel Tuas Shipyard, Singapore

August 2010 – September 10, 2011

Co-ordinate and supervise commissioning and construction work teams and plan future work programmes. / Established efficient and cost effective management of the company. / Conduct implementation, general supervision and site inspection of the on-going projects. / Monitor daily work activities if approved construction drawing is implemented and follow as per acceptable engineering standard and specification. / Liaise between Client and Contractor / Report on the integrity of explosion-protected equipment in hazardous areas / Install explosion-protected equipment and wiring systems / Ensure the safety of hazardous areas / Assess and minimize risks associated with working on Hazardous Area / Assess all risks before commencing work and have safe work practices / Install and commissioned lightings and small power, motors, transformers, medium and low voltage switchgear and control systems, UPS system and Generator Control Panel.

COMMISSIONING ENGINEER

SA&PB Qatalum Aluminium Smelter Project, SNC Lavalin Inc.,

Messaied Industrial City, Doha QATAR

June 2009 – March 2010

Project Description:

- Qatalum is a fully-integrated primary aluminum plant consisting of a smelter, casthouse and carbon plant as well as a dedicated gas fired power plant with an installed capacity of 1,250MW. Qatalum project have a capacity of 585,000 tonnes of primary aluminum per year. Total investment is estimated to be $5.6bn of which the power plant will account for approximately $1bn.

Responsible for the definition of system limits and commissioning activities for Qatar Aluminum Plant. Writing and execution of commissioning procedures. Approve and attend HAZOP, LOTO and Risk Assessment. Liaison with the construction team, hand-over to client and completion of TOC. Co-ordinate with other engineering disciplines during start-up and commissioning. Makes sure that the Field Punch List form is filled correctly, closed and signed-off for the System/Subsystem associated, and legitimate with respect to any project standard and specification, safety and industry common practice. Make sure that all punch lists from FATs, Outstanding Work Lists & walk downs are entered to Procosys. Follows up the introduction and progress of punch lists through all phase completion dossiers. Develop management commissioning philosophy, strategy, methodology and planning. Responsible for develop commissioning schedule and optimum commissioning sequencing. Ensure that all equipment in Completion Packages is on schedule and ready for hand-over.

PROJECT ENGINEER

QUEZON 460 MW COAL-FIRED POWER PLANT

Mauban Quezon, Philippines

February 2009 – June 2009

Project Description:

- Quezon Power is comprised of a 460 MW coal-fired electric generating facility and a 31-kilometer transmission line in Mauban, Philippines Quezon is one of the most modern and efficient power generators in the Philippines, with average efficiency levels of 90%.

: Electrical and Field Instrument Revamp Work and Intermediate Shutdown Works

Execute electrical engineering on projects and proposals identifying key aspects and strategy and ensuring sufficient resources are available to complete tenders. Prepare complete materials take-off, man hours, equipment hours, cost estimates, scope of work, preparation of construction drawing and review, bid documents, pre-bidding and evaluation. Conduct project implementation, scheduling, monitoring, progress report, coordination, supervision and inspection if approved construction drawing is followed. Established efficient and cost effective management of the company. Conduct implementation, general supervision and site inspection of all on-going projects. Monitor daily work activities if approved construction drawing is implemented and follow as per acceptable engineering standard and specification. Check contractor performance, quality of work, workmanship and safety of work. Check and review contractor reports and billings as per actual completion prior payment and acceptance.

ELECTRICAL COMMISSIONING TECHNICIAN

FDPSO – Azurite - Prosafe Production

Keppel Benoi Shipyard, Singapore

January 2009 – February 2009

Project Description:

- The Azurite FDPSO is the world's first floating, drilling, production, storage and offloading (FDPSO) vessel. It has storage capacity of 1.4 million barrels (220 10^3 m3) of crude oil. Its processing capacity is 60 thousand barrels per day (9.5 10^3 m3/d) of fluid and 40 thousand barrels per day (6.4 10^3 m3/d) of oil.

Assigned for the commissioning of GTG Power Generation. Perform insulation-resistance test of BRUSH generator stator winding using 1 minute and 10 minutes test and compare the polarization index to minimum requirements. Validation of all CT’s using current injection simulator and measure the secondary reading that corresponds to transformer’s ratio. Commissioning of Gas Turbine Generator system including Lube Oil Flushing, Engine Cranking Test Stage and GTG load testing. Verify the correct installation of the HV Cables, HV Earthing System including Neutral Earthing Resistors, HV switchgear within the system limits. Verify all control system and Speedtronics Mark VI force logic points are all checked with Nuovo Pignone to ensure all safety shutdown and remote alarms are fully functional and as per Document Standard Commissioning Checklist. Verify turbine pre-start, start and running checks are correct voltage at the secondary of all PT circuit with the unit running at full speed/no load and excitation on.

ELECTRICAL COMMISSIONING TECHNICIAN

FPSO – Bohai Bay Phase II Project (ConocoPhillips)

Sembawang Shipyard, Singapore

June 2008 – December 2008

Project Description:

- Bohai Bay is the largest oil and gas production base offshore China. The full field development was based on a peak production rate of 190,000 barrels of oil per day. ConocoPhillips has approved $1.8 billion in cash capital commitments for the multi-year second development phase of the company's Peng Lai (PL) 19-3 field in Block 11/05 in China's Bohai Bay.

Start-up and commissioning of transformers up to 11/3.3 KV, 75MVA (ABB, Siemens, Alstom,), UPS system up to 30KVA, Generator set up to 1500KVA(Cater pillar) and motors up to 11KV (ABB / Siemens) in the field on no load and 4 hours load test (check voltage, current, vibration, temperature, etc). Cable loop check, megger test of medium voltage and low voltage cables. Testing of current transformers (CT polarity and CT ratio test). Testing of Potential transformer (PT) (VT polarity and VT ratio test). Earth fault relay test. A.C Hi-pot-test (Bus bar, Breaker) D.C Hi-pot-test (Cables). Transformer testing rated up to 90/112.5MVA (insulation resistance test, ratio test, vector group test and pressure relief valve, oil temperature, winding temperature transformer protection test.

INSTRUMENT COMMISSIONING SUPERVISOR

Rebal Contracting - Rabigh Refining and Petrochemical Complex (PETRORabigh)

September 2004 – September 2007

Project Description:

- Construction of a polymers complex including two Polypropylene units with a total capacity of 700,000 t/y along with 250,000 t/y Easy Processing Polyethylene unit, 350,000 t/y Linear Low Density Polyethylene, 300,000 t/y High Density Polyethylene and 50,000 t/y butene-1 units. The total cost of the project is USD 10 billion.

Responsible for the definition of system limits and commissioning activities for Rabigh Refining and Petrochemical Complex. Writing and execution of commissioning procedures. Approve and attend HAZOP, LOTO and Risk Assessment. Liaison with the construction team, hand-over to client and completion of TOC. Co-ordinate with other engineering disciplines during start-up and commissioning. Review and provide inputs to contractor pre-commissioning, testing and commissioning execution plans, schedules, resources allocation, test procedures and final documentation. Provide construction inputs and recommendations to incorporate provisions for and facilitate pre-commissioning, testing and commissioning works. Commissioning of following systems for new Gas Plant: Rolls Royce Turbines, ABB Distributed Control System, ESD system and Fire & Gas, and Wormald Wellhead / Flow Line / Telemetry Systems.

ELECTRICAL COMMISSIONING ENGINEER

Rebal Contracting - Shoaiba Oil-fired CCGT Power Plant Project

Shoaiba K.S.A.

November 2001 – August 2004

Project Description:

- The Shoaiba Oil-fired CCGT Power Plant complex in Saudi Arabia have the following stages: Stage I Phase 1 Units 1, 2 & 3 (3 x 390MW, Alstom, 2001); Stage I Phase 1: Units 4 & 5 (2 x 390MW, Alstom,2002) ; Stage II Phase 1: 300MW and 50MIGD (Alstom,2004). The power station has a number of turbines, heat recovery steam generators (HRSGs) and ancillary power generation equipment. The total cost is thought to be around $5bn.

Responsible for the definition of system limits and commissioning activities for Shoaiba Oil-fired CCGT Power Plant. Writing and execution of commissioning procedures. Approve and attend HAZOP, LOTO and Risk Assessment. Liaison with the construction team, hand-over to client and completion of TOC. Coordinate with other engineering disciplines during start-up and commissioning. Supervise and manage a site team commissioning technicians. Supervise and monitor pre-commissioning, testing and commissioning activities of all plant/facility High Voltage, Low Voltage electrical systems. Ensure that all plant electrical systems have been correctly hooked up with appropriate construction check sheet completed. Ensure that all construction and pre-commissioning checks are witnessed and complete. Supervise the receiving, inspection and testing of commissioning materials and equipment and ensure that they are in accordance with the order/contract prior to receipt and/or acceptance by the Company.

INSTRUMENT COMMISSIONING SUPERVISOR

Malampaya Onshore Gas Plant Project

Yokogawa Philippines Inc.

January 2001 – August 2001

Project Description:

- The onshore gas plant delivers 500 MMscf/d of sweetened, dry gas to the gas buyers via onshore pipelines. The onshore gas plant removes hydrogen sulfide from the gas and convert this to sulfur. The plant has two parallel gas processing trains designed to achieve high availability levels to secure the supply of gas to the power plants. The discovery sparked the development of a US$4.5 billion gas-to-power program to provide the Philippines with 2,700 MW of electrical power.

Responsible for the definition of system limits and commissioning activities for Malampaya On-shore Gas Plant. Writing and execution of commissioning procedures. Approve and attend HAZOP, LOTO and Risk Assessment. Liaison with the construction team, hand-over to client and completion of TOC. Develop management commissioning philosophy, strategy, methodology and planning. Ensure that all activities in my areas are carried in accordance with the requirements as defined in company’s Environmental Management System manual. Testing and commissioning of foundation fieldbus, PAS, SIS instrument. Testing and commissioning of Fire and Gas instruments such as; Infrared gas detector, Hydrocarbon Gas Detector, H2S Gas Detector, VESDA Smoke Detector.

INSTRUMENT COMMISSIONING SUPERVISOR

Malampaya On-Shore Gas Plant

First Philippine Balfour Beatty

October 2000 – January 2001

Attend weekly meeting with clients for detail plans confirmation and clarification. Material take-off of instruments, instrument support and cables, etc… Arrange appointments with approved vendor’s specification and make confirmation of project materials concerning instrumentation job. Enforce work schedule and quality control. Conduct site inspection prior for instrument cable routing and planning. Site inspections of instrument work monitoring field installation activities. Updating and arrangement of instrument plans, drawings and other related documents. Preparation of change orders, sub-con monitoring and supervision.

ELECTRICAL & INSTRUMENT ESTIMATOR (Caltex Refinery)

R Square Services and Enterprises

May 1998 – October 2000

Project Description:

- Control System Upgrade / Electrical and Field Instrument Revamp Work

- Miscellaneous Electrical and Instrument Works During Plant Testing, Inspection and Intermediate Shutdown Works.

Working with the quantity surveyor to estimate the type and amount of materials necessary to deliver the contract against the agreed specifications. Estimating the cost of labor, materials and equipment prior to shutdown work. Working with a site manager and planning engineer to help predict the timescales of a project, which has a considerable bearing on costs. Establishing the likely progress and completion rates, including allowances for bad weather and other unforeseen circumstances.

ELECTRICAL & INTRUMENTATION ENGINEER

Sakamoto Orient Chemicals Corporation

Aplaya, Bauan, Batangas, Philippines

April 1996 – March 1998

Project Description:

- Sakamoto Orient Chemicals Corporation is an oleochemical manufacturing company that produce Diglycerin, Refined Glycerin and Refined Polyglycerin.

Prepared feasibility studies, preparation of construction drawing, sketches and detail, checked, reviewed and approved. Responsible for completing material take-offs, cost estimates for labor and materials and calculating profit. Create or modify procedure as required, recommend changes depending on equipment performance tests. Identifies particular problems, assess the effectiveness and corrective maintenance procedure. Assist in developing preventive maintenance schedules to ensure that equipments are maintained. Complete estimates and supervising of construction activities/project. Diagnosis complex fault, analyze malfunction and breakdown.

ELECTRICAL/INSTRUMENTATION TECHNICIAN (Working Student)

Philippine Industrial Engineering Company

Shell Tabangao, Batangas City, Philippines

April 1991 – June 1994

Perform various duties associated with installation, maintenance, troubleshooting, upgrading and calibration of pneumatic and electronics instrumentation. Configuration, installation and start up of PLC (Siemens S5 / Allen Bradley PLC5), Rosemount transmitters, Fisher control valves, and Bentley Nevada vibrating monitoring system (VMS) and other process instrumentation. Set up equipment, provides line support, perform corrective and preventive maintenance. Perform diagnostic maintenance on basic process control system including boiler and compressor controls. Perform preventive and emergency maintenance on all instruments, prepare and record all details of equipment maintenance.

ELECTRICAL/INTRUMENTATION - TRAININGS & SEMINARS

CompEx Training / Industrial Instrumentation and Process Control Training / Industrial Instrument Calibration / TDC 3000 Basic System Maintenance / Programmable Logic Controller / Advance Programmable Logic Controller Programming / Trainer’s Training on Competency – Based / Industrial Motor Controller / Competency Based Assessor’s Course / Infrared Gas Analyzer / Waste & Waste Water Instrumentation Workshop

SPECIAL SKILLS

Computer Literate.

Experience for the following software such as: Procosys, Primavera (Project Manager 3.0), Microsoft Project, Autocad Microsoft Office (Word, Excel, Power Point, Outlook),

PERSONAL BACKGROUND

Nickname : Jojo

Age : 39 years old

Height : 5’7”

Weight : 135 lbs.

Birthdate : July 01, 1972

Birthplace : Isla Verde, Batangas City, Philippines

Provincial Address: Puerto Galera, Oriental Mindoro, Philippines

Nationality : Filipino

Religion : Catholic

Civil Status : Married

Spouse : Edna S. dela Roca

Occupation : Computer Instructor

Language : English & Tagalog

References available upon request.