QUALIFICATIONS
The ability to understand blueprints and specifications. Knowledge of construction materials and practices, building codes, contract specifications and planning and estimating jobs with the ability to express ideas and information clearly both in oral and written form.
Responsibilities have included: installing rigid pipe inch to 5 inch, installing cable tray, concentric bending, instrument tubing bender, installing motor control centers from blueprints, equipment layout on instrumentation and transformers.
Cutler Hammer 4160 Switch Gear, MP3000 Relays, 4160 Stress Cones,5-8 KV Motor Kits (Raychem), 5 KV Megger.
CERTIFIED HIGH VOLTAGE TERMINATOR - Received in 1999
VALID OSHA CARD
NEC CLASS COMPLETED
EXPERIENCE
February 2010 – May 2010 Mechanical Construction Services, Inc.
Lagrange, Texas 870-***-****
Journeyman Electrician- A Txu Power Plant Outage, Demolition of exisiting Conduit and Laying out and reinstalling of conduit and lights in new fan Room # 2
February 2007 – January 2008 RECOVERY SCHOOL DISTRICT
New Orleans, Louisiana 504-***-****
Electrical Supervisor – Ordering and procuring of all electrical materials.
Setting up and supervising all electrical jobs for the schools under the control of the Recovery School District.
Barnack, Thomas
November 2005 - May 2006 FLUOR GOVERNMENT GROUP
New Orleans, Louisiana 281-***-****
Site Assessor/Quality Assurance/Leasing (TRS Staffing)
All aspects of disaster relief.
August 2005 - October 2005 FLUOR/BECHTEL Greenville, S.C.
Comanche Peak S.E.S. (Nuclear Outage) 861-***-****
Removing electrical interferences according to WPIR Procedures for feed water base plates installation. Setting temporary power in containment for other crafts. Also, engineered building of these power packs.
June 2005 (Outage) U.S.TRADES Indianapolis, In.
International Paper Sawmill 317-***-****
Terminated 4160 Switch Gear, terminated MP3000 Relays, installed 5-8 KV
Motor Kits (Raychem), used 5 KV Megger, pulled wire according to prints.
April 2005 to May 2005 ATLANTIC GROUP Norfolk,Va.
Waterford III Nuclear Power Plant 757-***-****
Clean and inspect main buss, worked on main transformer replacement, worked on 13/8 KV Stress Cones, temporary power, clean buss links.
March 2005 to April 2005 SUN TECH SVCS. Reno, Nv.
D.C. Cook Nuclear Power Plant (Nuclear Outage) (269) 465-5901x1905
Worked on main transformer, worked on reactor coolant pump replacement, worked on main buss.
September 2004 to November 2004 FLUOR GLOBAL Greenville, S.C.
Surry Nuclear Power Plant (Nuclear Outage) 864-***-****
Installing rigid conduit, pulling wire, pulling fiber optic cable, installing instrument gauges in MCC room, install and terminate security cameras.
August 2004 GRUS, INC. Cincinnati, Oh.
Lowe’s Reload Center 888-***-****
Journeyman electrician, commercial project, install rigid conduit, pull wire, terminate 480 volt, terminate panel boards.
Barnack, Thomas
March 2004 to July 2004 MMR Contractors, Inc. Baton Rouge, La.
Mad Dog Project 225-***-****
Journeyman electrician, J. Ray McDermott yard, install and terminate gas and fire detectors, terminate 480 volt in MCC room, clean 4160 breakers in MCC room (Siemens)
January 2004 to February 2004 HARBOR Electric Michigan City, Inc.
Journeyman electrician, commercial project (bank), install rigid conduit, pull wire, install and terminate CAT 5 cable and plugs, terminate panel boards.
November 2003 to December 2003 ELECTRIC General Corp. Sterling, Va.
Journeyman electrician, commercial project (service work), trouble shoot transformers and lighting as service work, design and modify building service room.
August 2003 to October 2003 Tech N Engineering/SAR Indianapolis, In.
Mercedes Benz Plant 800-***-****
Journeyman electrician, terminate panels in MCC room, install control wiring for robotics.
July 2003 CTS Grand Rapids, Mi.
Journeyman electrician, school system, install 6” conduit, pull wire, terminate panel boards.
April 2003 to June 2003 GRUS, INC. Cincinnati, Oh.
Natural Gas Plant 888-***-****
Journeyman electrician, industrial project, install rigid conduit (2”), pull wire, design and install pull stations for fire suppression system.
January 2003 to April 2003 TRADESMAN International Macedonia, Oh.
Journeyman electrician, hospital lab facility, install EMT conduit, pull wire, terminate panel boards.
Barnack, Thomas
July 2002 to October 202 HARBOR Electric
Michigan City, In. 219-***-****
Journeyman electrician, commercial project (church/gym addition), install rigid conduit, pull wire, terminate panel boards.
July 2001 to October 2001 H & G SERVICES South Bend, In.
Journeyman electrician, commercial project (military academy/science-math buildings), install conduit, pull wire, terminate panel boards.
October 2000 to May 2001 U.S. ELECTRIC Lombard, Il.
Journeyman communication/electrician, installation of communication systems for World Com/MCI including Cisco, Fujitsu, knowledge of PLC 5
And Flick 150.
August 2000 to October 2000 DAVIS Electrical Contrs. Greenville, S.C.
Journeyman electrician, industrial project (plastic’s factory), install conduit,
Pull wire, terminate cabinets in MCC room, clean 4160 volt GE breakers.
April 2000 to July 2000 GRUS, INC. Cincinnati, Oh.
Journeyman electrician, industrial project (natural gas plant), install rigid conduit, pull wire, terminate panels in MCC room, terminate 4160 volt cables in MCC room, clean breakers (GE).
October 1999 MERIT ELECTRIC & INSTR. Baton Rouge, La.
Journeyman electrician, industrial project (refinery), knowledge of PLC 5 and Flick 150, 244 High Voltage terminations, PLCs, interpret blue prints/schematics, clean Siemens and GE breakers.
December 1996 to November 1998 MIDCORR Pkg. New Carlisle, In.
Control room operator/supervisor.
Barnack, Thomas
EDUCATION
1993 – 1996 Purdue University Calumet, Hammond, In. – Majored in Electrical Engineering Technology.