Post Job Free
Sign in

E&I engineer

Location:
Hubei, China
Salary:
Negotiation
Posted:
November 03, 2011

Contact this candidate

Resume:

Name: Gu Gang

Sex: Male

Marital Status: Married

Date of Birth: May 1968

Education: Graduated at July, 1990 from Hankou branch of Huazhong Technology Institute (current HUST), major in Computer Application, Diploma (3 years).

Original City: Jingmen city, Hubei province, China

Personal Abilities/Skills:

- Familiar with international standards in instrumentation discipline for onshore/offshore Oil & Gas industry: API, IEC, ISA, NFPA, DNV etc, and also GB.

- Be accomplished in the concept and engineering of field instrumentation, DCS/SIS/PLC, Fire and Gas detection Systems, security systems (PAGA system, CCTV system, Trunk Radio communications system), MCC. Familiar with approaches of data exchanging and communication protocols (OPC, TCP/IP and Modbus etc.) for above electronic control systems.

- Familiar with project developing of upstream/downstream in O&G industry: FEED, basic/detail design, HAZOP, construction, commissioning and routine maintenance. Be versed in generating and reviewing various project documents/drawings for instrument discipline and low voltage electrical control system.

- Good computer skills on office software: Word/Excel/Power point etc, and also skills on special software AutoCAD, InstrCalc etc.

- Bilingual (Mandain/English) both in Oral and written. Good interpersonal and communication skills. Good team player.

- Be able to work under heavy pressure. Stick out task target.

- Project execution, control and coordination abilities in E&I and other disciplines.

Training courses:

• Oct. 1991: Training course for electronic series instrumentation at Beijing Yuandong Instrument Factory.

• Nov. 1991: PLC “MODICON 984” Training Course at Beijing 502 Institute (a research and application academe belongs to National Space/Aero Ministry).

• Nov.1997: Training course for Flow Instrument at YOKOGAWA Shanghai Instrument Co., Ltd.

• Mar. 1999: “Scan 3000DCS” Training course at Shanghai Honeywell Company.

• May 1999: “Freelance 2000DCS” Training at BeiJing Beili Company.

• Apr. 2000: “FCS, DCS, APP” Training course at TianJing Honeywell Company.

• Sep. 2000: Trained and worked at Honeywell Company in Phoenix City USA.

• Dec. 2004: “Project Schedule and Cost Control Course”, trained in E.S.I. and got course certification issued by Georgian Washington University.

Current contact:

Mobile Phone:

Email (private): gqmn4b@r.postjobfree.com

Working Experience:

May, 2011 to Now

Working for EDC (Exploration & Development China Co., a subsidiary of Noble Energy, USA)

He was E&I engineer working as EDC site team member for CDX offshore oil field development DPB LQ project at Tianjin BOMESC yard. To complete job of LQ offshore installation, platform shutdown and modification.

Mar, 2011 to May, 2011

Worked for WASCO Offshore Engineering (Nantong) Ltd., Com.

He was senior electrical & instrument engineer worked in engineering department of the company to oversee all aspects of E&I detail design for FPSO topside modules, packages etc.

Sep, 2009 to Feb, 2011

Worked for Jutal Offshore Oil Service Limited

He was senior electrical & instrument engineer as a section head of E&I disciplines worked in engineering center of the company. To prepare, review an approve project required E, I&T technical documents during FEED, basic & detail design phases for such process packages of natural gas processing (Dehydration Unit, Desulfurize Unit and LPG Unit), and also for equipment skid such as three phase separator skid for crude oil and gas, compressor skid and auto-controlled filters skid etc.

Projects on hand now are doing detail design for gas sweetening units of AHDEB oilfield project.

Apr, 2009 to Sep, 2009

Worked for Wuhan SAIBO Electromechanical Equipment Co. Ltd.

He was senior engineer to oversee and handle all technical issues occurring in company’s business activity.

Jun, 2007 to Mar, 2009

Working for COPC Bohai Phase II PL19-3 Project, FPSO Hull & Topside Integration PMT in Singapore SMOE

He was Automation Engineer worked in field engineering team to support FPSO final construction and FPSO integration commissioning. Review and approve As-built drawing. Provide technical support for troubleshooting of commissioning. Raise and upgrade solution for modification of existed instrument and control system.

Sep, 2005 to May, 2007

Worked for COPC Bohai Phase II PL 19-3 Project, FPSO HULL PMT in Shanghai office

He worked in COPC (ConocoPhillips China Inc.) engineering team as an Instrument/Automation Engineer to direct and supervise EPC Contractor to carry out basic/detail design, construction of instrument and automation control system for new building FPSO Hull (with LQ, 120men) project. Main scope of work is following:

--- Preside on analyzing, evaluating, selecting and specifying for control system and instrumentation of Hull. (Delta V, GE Fanuc, Autronic F&G, PAGA & CCTV secure system. Loading computer of Hull. Rosemount transmitter, Fisher control valve. KROHNE level gauging system. Scana Skarpenord hydraulic remote control valve system etc.).

--- Supervise basic/detail design of instrument discipline. Review, comment and approve following engineering documents of instrument discipline: Philosophy, specifications, P&ID, MCC schematic, instrument Data sheets, instrument index, I/O list, cable block diagram, wiring diagram, C&E chart, loop diagram and installation drawing etc.

--- Participate in HAZOP and provide expertise. Provide technical support for construction and commissioning.

Sep, 2004 – Aug, 2005

Worked for Guangdong Dapeng LNG Company Ltd.

He was an E I&C Coordination Engineer worked for Guangdong DPLNG company (A Joint Venture Company by BP and CNOOC, he worked in BP’s Terminal Project Team) under leading of Project Coordination Manager. Main scope of work is following:

--- Handling interface issues (technical and commercial) for those aspects of Electrical, Instrument and Communication disciplines within different projects (Terminal project controlled by BP. Pipe line project controlled by CNOOC. Pipe line branch to HK is controlled by HEC&HKCG).

--- Coordinating with diverse Company partners, Contractors and Venders to push ahead with project progress in multiform cultural environment. (Companies: BP, CNOOC, HEC, HKCG. EPC contractors: JGC, HQCEC. Vendor: Honeywell)

--- Handling divergence from different groups, finding out acceptable solution to support management making decision.

--- Participate in selection and evaluation of SCADA system for pipe line project from different vendor’s product (Honeywell TPS, Invensys I/A and Emerson Delta V).

May, 2001 - Sep, 2004

Worked for Shenzhen Jutal Machinery Equipment Co. Ltd.

As Section head of Electrical, Instrument and Telecom disciplines in Engineering Department of the company.

Dec, 2003 - July, 2004

As a secondment employee he worked for KMG (a foreign oil company in China) CFD11-1 & CFD11-2 PMT as an Electrical & Instrument engineer at site office in Tanggu, Tianjin, supervised and coordinated with EPC contractor (COOEC) to carry out E&I construction, Pre-commissioning and offshore commissioning (HV/LV MCC, Invensys I/A DCS, Triconex safety systems, Autronic F&G, PAGA & CCTV secure system) for two offshore platforms and LQs (40men each).

Oct - Nov, 2003

As a secondment employee he worked in Shanghai Waigaoqiao Ship Yard as an instrument specialist to direct and supervise a design team to develop and carry out detail design for disciplines of instrument, F&G, Telecom for a project of BZ25-1 FPSO topside process module.

Jul, 2002 - Sep, 2003

He was a discipline leading engineer for instrument, telecommunications and fire & gas and worked for EPC project of ConocopPhillips Belanak FPSO Marine Electrical Module (MEM) and Living Quarter (120 Men LQ). His responsibilities listed as following:

--- Acted as leading engineer to carry out detail design of instrumentation, fire & gas and telecommunications. To generate engineering documents and drawings such as: specifications, instrument data sheet, Cable block diagram, wiring diagram, layout, cable schedule, instrument index, system earthing drawing, hook-up drawings and BOM etc. --- Coordinate with Company’s site representative and Contractor’s (KBR) site engineers to resolve all technical issues of detail design.

--- Review and approve vendor’s technical documents.

--- Support project team to resolve all technical issues for procurement, construction and commissioning.

May 2001 - Jul, 2002

He was senior instrument engineer and finished following three projects.

--- JHN LF13-1 new hydrocyclone project (part of platform process waste water treatment system).

--- CACT FPSO Nanhai Faxian modification project for newly-built crude oil 3 phase separation process module. Scope of work included detail design, technique support for procurement and construction.

--- Devon Panyu 4-2 / 5-1 Living Quarters tender.

Scope of work included as following:

--- Performed instrument detail design as per P&ID, generated following engineering documents and drawings: Specifications for instrument and cable, instrument list, wiring diagram, cable block diagram, cable schedule, installation drawing, BOM etc.

--- Provided technical support for procurement, construction and offshore installation.

July,1990 – Apr, 2001

Worked for SINOPEC Jingmen Branch Company



Contact this candidate