Post Job Free
Sign in

Power Plant Electrical

Location:
United Arab Emirates
Posted:
June 21, 2012

Contact this candidate

Resume:

POSITION APPLIED FOR - (MANAGER -electrical)

PERSONAL INFORMATION:

NAME : Mr. SHAHANAVAJ BADASHAHA SHAMANAJI

SEX : Male

NATIONALITY : Indian

MAILING ADDRESS : **********@**********.***

PASSORT : F1146059 Date of expiry 19/10/14, place of issue:pune

PRESENT ADDRESS: - Flat 102, Chaya Bid,

B-38, Sector-4,

New Panavel-New mumbai-410206.

PERMANENT ADDRESS: AT- Madur, tal –bhudaragad, dist – kolhapur.

CONTACT NO 0-720*******/ 976********

EDUCATIONAL QUALIFICATION:

Sr.

No. Educational Qualification College/School University/ Board % Of

marks

1 Diploma in Electrical & Electronic Engineering- (AICTE New Delhi) April-2000. Motichand Lengade Bhartesh Poly.Belguam, State-Karnataka, Bangalore

university 1st year 1997-98 - 60%

2nd year 1998-99 - 61%

3rd year 1990-2000- 56%

2 Vocational Technical (Electrical) March-1996 Karmaveer Hire College, Gargoti Shivaji University, Kolhapur 65%

3 S.S.C. with technical (wiring) March-1995 Shahu Kumar Bhavan Gargoti, Dist-kolhapur Pune. university 62 % Technical “A”

GOVT : ELECTRICAL SUPERVISOR LICENSE (govt. of India) : NO. 38417

ADDITIONAL TRAINNING

Sl. no. Type of training achieved Date /durations Offered by Provided by

1 Plc and SCADA 21/1/05 to 2/2/05 Vicks industrial training, Mumbai Myself

2 Fire fighting Each year one day Tailor made program Alkyl amines

3 Energy conservation 12/3/05 –one day Reliance At Andheri, Mumbai. Kevin enterprise

4 Energy conservation 12/12/05 –one day Reliance At Santakruz, Mumbai. Kevin enterprise

5 World class maintenance 27/4/06 to 28/4/06 Godrej At Vikroli, Mumbai Kevin enterprise

6 PLC and SCADA 6/5/07 to 10/6/07 PROLIFI Automation, Thane Myself

7 Variable speed drives 3/6/08 to 4 /6/08 PROLIFI Automation, Thane Myself

8 CAE (Automation) full time 15/7/08 to 25/11/08 PROLIFI Automation, Thane Myself

9 Fire fighting & first aid 28/9/09 to 29/9/09 T S. RAHAMAN , NAVA NSCT –DP World

10 S5-PLC 6 days SIMENCE (TACK) NSICT-DP World

11 Team Leader 3 days NSICT NSICT-DP World

12 Networking/hardware /2/2011 to 1/3/2011 Kirti computer & networking training NSICT-DP World

WORK EXPERIENCE:

TECH NOVA ( I ) PVT LTD . MIDC TALOJA

Date: 16/4/2011 to till date

Position held: Exc. Engineer(electrical). Ctc: 5 lakh/year

Profile: utility maintenance : PM /BD maintenance of utility .

NHAVA SHEVA INTERNATIONAL CONTAINER TERMINAL PVT. LTD. –URAN.

Date: 2/2/2008 to 15/4/2011

Position held: Senior officer (electrica engg)

Job Profile:

Electro_mech maintenence & supervisory of PORT equipment like of QC,RTG,RMG,

Trouble shooting in Master Drives (CUVC), Simoreg master drive DC 6RA24, 6RA70, Step7 PLC Programming and diagnosis of faults with the help of PLC programmer.

Hands on experience S7300 s S5plc, and SIMATIC PC 670 etc.

Installation of all Software related to all the cranes.

ABB AC Drives ACS-600, ACS-800

Other Systems like Absolute Encoder, Crane Ranger anti-collision devices, Pat-Krugger load

measuring devices, Crane management systems like SICMA, etc

Trouble shooting, design modification and implementation design for recurring problems

Well experience of Reach stackers (FUNTUZZI REGGIANE MAKE)

Overhaul Preventive & Breakdown maintenance of machines & panels.

Experience of HT switchyard 33KV/415V. equipped with step up & step down transformer.

Worked on SF6 ,VCB , ACB .L&T breakers. i.e in substation.

Well experience of substation maintenance : 1250 kva 3 no’s of DG sets synchronizing system

Good Operating knowledge of QC, RTG,RMG,funtugi,stacker,fork lift,also ITV.

PORT light vehical dirving lisance, fork lift, funtugi,rich stacker.

Note : over all experience is gone unde highely safety activites.

KEVIN ENTERPRISES PVT. LTD. (MNC) (ISO-9001)

MIDC-ANDHERI (E), MUMBAI-93

( Still industries )

Date: 1/5/2005 to 15/1/2008

Position held: Electrical Engg.

Actual work : Mainly Utility like( DG, Boiler, compressor,chiller etc maintenance.

Overhaul Preventive & Breakdown maintenance of machines & panels.

Carry out project activity ISO work ,EMS repots & analysis . Electrical energy conservation ,World-class management system

Experience of switchyard 33KV/415V (1250 KVA Transformer)

Worked on1250 KVA Diesel Generator Set (Cummins Make)

Knowledge of Electrical Panels like CRP (Control & Relay Panel), PCC , (MCC)

Experience of protective Relays (i.e., Over current, Over voltage, under voltage, Earth Fault Relay Etc.

Worked on VCB (Vacuum Circuit Breaker) 1600 Amps, ACB Air Circuit Breaker.

Security System,(Ex:-Fire Alarm, Burglar Alarm), UPS System Etc.

Maintenance of CNC punching, power press, production shop & tool room machines.

Experience of all utilities equipments like Chiller (200 TR capacity) Trane make, FO Boiler, Air Compressor etc.

Knowledge of AHU (Air Handling Unit), Ventilation System, VFD (Variable Frequency Drive).

ALKYL AMINES LTD. MIDC- KURKUMBH, DIST-PUNE

Power plant

Date: 1/1/2005 to 28/4/2005

Position held: Electrical Engg. (Powerhouse) Project and maintenance activity with sitson inda ltd.

Boiler: Sitson Pvt. Ltd Capacity 65 Kg. /cm2 Pressure, 10 tones (high pressure boiler)

T.G. Set: Mitsubishi/triveny set : 1.5 MW power generate.

D.G. Set: 320 KVA, 1250 KVA.(synchronizing DG set )

Equipped with: power plant, ESP Plant, fully AUTOMATION, belt conveyor (DCS, SCADA, S7-300PLC.)

MAHILA VIKAS CO-OPERATIVE SUGAR FACTORY LTD.

TAMBLE DIST-KOLHAPUR

Date: 5/7/2000 to 31/12/2004

Position held: Trainee engineer then Electric engineer.

Capacity: 2500 Metric Tones .

Boiler: Thyssen Krupp. Working Pressure 45kg / cm2, Capacity 30 tones /hr.

T.G. Set: Turbine: 8000RPM – Triveny

Generator: Jyoti Ltd, Vododara, 3750KVA, 1500 RPM,

DG Set: Stamford 500kva.

Mainly maintenance activity carried out in powerhouse.

Knowledge gained : electrical installation project activity with Thyssen krup

TG SET(POWER PLANT) KNOWLADGE GAINED FROM DUDGANGA SUGAR PLANT

1) Generator: BHEL2500 KW, 3125 KVA, 0.8pf, Amp 4110, Excitation 64V, Turbine: Triveny 8000 rpm.

2) Generator: SIEMENS WSW 1250 KW, 1560 KVA 2050 amp, 0.8pf, Excitation 49 volt dc Amp 240, Turbine: S.G.P. + 4 pole 8000 Rpm.

3) TG Scoda + brown bravery 613 KW, Excitation- Static + dynamic

4) Generator: Bharat Heavy Electrical 1500 RPM, 4 POLE 1.5MW, Turbine 4 pole 8000 rpm.

DG Set: 320 KVA + 1000 KVA (Kirloskar).

SKILED ON:

Planning and Executing the job to be done like Preventive and Corrective maintenance.

Executing the breakdown jobs quickly and taking the correct decisions based on the condition and the importance of the equipment.

Good communication skills, Leadership qualities and Self-Motivated.

Comprehensive Problem solving abilities and good team management.

Performing preventive, corrective and Breakdown maintenance for reducing machinery downtime to minimum

I declare that the statement made by me in application is Correct to the best of my knowledge and belief.

DATE: SHAHANAVAJ B. SHAMANJI



Contact this candidate