CURICULAM VITE
N.MATHAN KUMAR
Mayer vihar phase –III,
Near life care hospital,
Delhi-110096.
Mail Id: gfiwsr@r.postjobfree.com
Mobile No: +918**********
OBJECTIVE:
To hold a challenging and competitive position in an organization, where I can explore my experience, skill and strength in conjunction with company’s Goals and Objectives.
ACADEMIC PROFILE:
Diploma in Mechanical Engg. from Mohamed Sathak polytechnic college., Kilakarai., Ramanathapuram (dist) from 1999-2002
Board of secondary education from K.A.Hr.Sec.School, Arumuganeri ,Tuticorin dist,
From 1997-1999
Board of Education from SRI Ganeser Hr. Sec school, Nalumavadi, Tuticorin dist,
From 1996-1997
SOFTWARE PROFILE:
Attended training programmed for PDMS version 11.6 SP4
(Modules: DESIGN, DRAFT, ISODRAFT, EQUIPMENT, STRUCTURAL) Conducted by AVEVA solutions Ltd.
Equipment modeling
Piping modeling
Interference manager
Sound Working Knowledge in Autocad 2008 (2D Drafting & 3D Modelling).
Micro station
TECHNICAL EXPERTISE
Total 10 + years of experience in PDMS DESIGNER - PIPING
PROFFESONAL SUMMARY:
Worked as a PDMS Piping designer in M/s ALSTOM PROJECTS INDIA LTD (APIL) Noida, from Septemper 2011 to Till date.
Worked as a Piping designer in ENMASS PROCESS TECHNOLOGY
(EPT) Services Pvt Ltd, Chennai from April 2005 August 2012.
Worked as a Technician Apprentice in M/s BHARAT HEAVY ELCETRICALS LTD(BHEL) Chennai, from March 2004 to March 2005.
Worked as a Draftsman in MECH-CI CADD PVT LTD Chennai, from June 2002 To February 2004.
Major Projects Experience Summary
Client : BHEL
Tools used : PDMS 11.6,Sp4
Project : BELLARY UNIT-3
Capacity : 1x700 MWe( SUPERCRICITAL Boiler)
Duration : SETEMPER 2011 to Till Date.
Activities involved in the above project
Warm keeping system piping
Spray water piping to super heater I ,II, III
Boiler drain and vent piping
Major Projects Experience Summary at EPT
Client : Foster wheeler North America Corporation
Tools used : PDMS 11.6,Sp4
Project : VCHEC UNIT-II ( Virginia city hybrid energy center )
Capacity : 2x335 MWe( CFB Boiler)
Duration : JANUARY 2010 to DECEMBER 2010
Activities involved in the above project
Piping module for the following systems
Boiler vents and drain Piping
Instrument air piping
Aux steam piping from transfer piping to terminal point
Steam coil air heater Supply piping to PA air duct and Return piping to Condensate Tank and blow down tank.
Service Air Piping and water piping
Condensate stripper cooler cooling piping (supply & return)
Support design and detail engineering for the above systems
Preparation of isometric drawings using ISODRAFT for above systems
Preparation of GA drawing by using PDMS DRAFT Module for above Systems
Major Projects Experience Summary at EPT:
Client : Foster wheeler North America Corporation
Tools used : PDMS 11.6,Sp4
Project : VCHEC UNIT-I ( Virginia city hybrid energy center )
Capacity : 2x335 MWe( CFB Boiler)
Duration : August 2008 to DECEMBER 2009
Activities involved in the above project
Piping module for the following systems
Loop seal air piping.
Instrument air piping
Aux steam piping from transfer piping to terminal point
Steam coil air heater Supply piping to PA air duct and Return piping to Condensate Tank and blow down tank.
Service Air Piping and water piping
Condensate stripper cooler cooling piping (supply & return)
Support design and detail engineering for the above systems
Preparation of isometric drawings using ISODRAFT for above systems
Preparation of GA drawing by using PDMS DRAFT Module for above System
Major Projects Experience Summary at EPT
Client : Foster wheeler North America Corporation
Tools used : PDMS 11.6 SP4
Project : CUSMO (City Utilities of Springfield, Missouri)
Capacity : 300 MWe (CFB Boiler)
Duration : October 2006 to July 2008.
Activities involved in the above project
Piping module for the following systems
Loop oil piping from turbine front and rear bearing
Spray water attemperator piping .
Boiler vents and drain Piping
Steam coil air heater Supply piping to PA air duct and Return piping to Condensate Tank and blow down tank.
Support design and detail engineering for the above systems
Preparation of isometric drawings using ISODRAFT for above systems
Preparation of GA drawing by using PDMS DRAFT Module for above System
Major Projects Experience Summary at EPT
Client : Metso hybex boiler ,tampere,finland
Tools used : PDMS 11.6, Sp4
Project : Tartu chp 621
Capacity : 2x250 Mw (CFB Boiler)
Duration : January 2006 to September 2006.
Activities involved in the above project
Piping module for the following systems
Feed Water pump suction and discharge
Aux steam piping from transfer piping to terminal point
Steam coil air heater Supply piping to PA air duct and Return piping to Condensate Tank and blow down tank.
Support design and detail engineering for the above systems
Preparation of isometric drawings using ISODRAFT for above systems
Preparation of GA drawing by using PDMS DRAFT Module for above Systems
Major Projects Experience Summary at EPT
Client : Foster Wheeler North America
Tools used : PDMS 11.6, Sp4
Project : CLCKO-Southwest Unit 2.
Capacity : 2x200 Mw (CFB Boiler)
Duration : April 2005 to December 2005.
Activities involved in the above project
Piping module for the following systems
Loop oil piping from turbine front and rear bearing
Seal air piping to coal feeder and pulverizer Mill.
Lube oil piping from lube oil skid to ID, PA, and SA fan & motors bearings.
Spray water temperature piping.
Boiler vents and drain Piping
Support design and detail engineering for the above systems
Preparation of isometric drawings using ISODRAFT for above systems
Preparation of GA drawing by using PDMS DRAFT Module for above System
Major Projects Experience Summary at EPT
Client : NTPC, Unit -1, Gujarat
Tools used : PDMS 11.6, Sp4,
Project : Birisingpur Thermal Power Station.
Capacity : 2x250 Mw
Duration : March 2004 to March 2005.
Activities involved in the above project
Piping module for boiler integral piping for the following systems
Loop oil piping from turbine front and rear bearing
Aux steam piping from transfer piping to terminal point
Seal air piping to coal feeder and pulverizer Mill.
Main Stream Piping
Feed Water Piping
CRH Piping
HRH Piping
Jobs & Responsibilities in PDMS:-
Equipment Modeling, Piping Modeling, Structure Modeling
Isometric and draft
Assistance in preparation of piping material take off from Model.
Extraction of deliverables from 3D model.
Ga drawing preparation from draft module
clash check reports in 3D model
Development of modeling procedures.
Progress monitoring & expediting completion of model.
Output Design Isometrics using PDMS isodraft module
Equipment modeling and Pipe routing using PDMS 3D engineering software
Areas of Experience:
Ability to conceptualize plant and prepare study layouts.
Development of equipment layout and plot plan.
Development of piping general arrangement drawings.
Preparation of isometrics, vessel trims, nozzle orientation drawings.
Preparation of Bom, Floor opening and insert plate
Preparation of Support BOM & support drawing
Preparation of stress analysis supports drawing
Development of support design
Knowledge of codes and standards
Review of vendor drawings.
Review and checking of piping layouts, isometrics etc.
Personal Details:
Father’s Name : Mr. P.Nambi
Date of Birth & Age : 07.07.1982
Languages Known : English & Tamil
Permanent Address : 5/69 West Street, Manathi, Kurukattur post
Tuticorin Dist – 628623
Passport Details:
Passport Number : E9013409
Data of Issue : 09.04.2004
Data of Expiry : 08.04.2014
Place of issue : Tiruchirappalli
Declaration:
I declare the above details are true & the best of my knowledge.
Place:
Date : (N.MATHAN KUMAR)