Kishan M Swami
*** * ****** **. *******, CA ***** 805-***-**** *************@*****.***
Objective:
Obtain a full-time position where I can utilize and develop my engineering skills.
Education:
California Polytechnic State University, San Luis Obispo Graduation Date: March 2012
Bachelors and Masters of Science in Industrial Engineering Grad GPA 3.77
Thesis Research: Critic of Demand Driven MRP
Relevant Coursework:
• Production Planning and Control Systems
• Quality Engineering/Process Optimization
• Supply Chain and Logistics Management
• Advance Design of Experiments
• Database Design/Management
• Systems Engineering
• Human Factors/Ergonomics
• Simulation/Operation Research
• Econometrics/ Economic Probabilistic Modeling
• Economic Decision Analysis System (Corporate Finance)/ Engineering Economics
• RFID Implementation and Electronic Manufacturing
• Engineering Mechanics/Materials Engineering
Work Experience:
Custom Sensor Technology (Kavlico) (Manufacturing Engineering Intern) February 2012-Current
• Created Weld Work Instruction to aid with NADCAP certification
• Standardized current Weld Schedules
• Implemented laser power meter for data collection as a preventive action
• Created a database to analyze weld and braze cell’s scrap/rework
• Helped train welders with new Work Instructions and database interface
• Validated Equipment for NADCAP certification
Abbott Vascular (Manufacturing Engineering Intern) June 2011-September 2011
• Reduced the frequency of cleaning and belt change of packaging machine
• Convert SOPs into easy-to-read documents with pictures
• Modified tool design drawings
• Enhance designed on current product to reduce the field failures
• Created process flow maps for new product to aid with process improvement
• Implemented local process improvement suggestions
Genentech (Production Logistics Intern) June 2010-September 2010
• Created a template to be used for sensitivity/scenario analysis for the MPS
• Revealed root causes for the re-work on process orders, and the large amount of alerts present on SAP
• Made a Business Process Instruction (BPI) to approach the alerts present on SAP-APO
• Developed a project management tool utilizing DMAIC methodology, using Microsoft Project
• Worked on available capacity model for the current department
Projects:
Poly House: House Renovation for Needy Family (Shandon, CA) Spring 2011
• Raised food to support all of the volunteers helping out
• Scheduled volunteers into shifts, along with their rides to the site
• Fundraised furniture and ergonomically equipment to provide a better life for the family
• Utilized project management tools to manage all of the logistics and milestones
Pacific Gas and Electricity (PG&E): Tool Inventory Tracking System (Diablo Canyon, CA) Spring 2010
• Implemented a tool-tracking system via RFID sending information to a central database
• Created prototype of the model with a backup system for easy implementation
• Developed a database in which the data is stored and reports may be created easily
Greenheart Farms: Facilities Re-Design (Paso Robles, CA) Winter 2010
• Implemented an automation machine to enhance throughput and ergonomic material handling environment
• Redesigned the layout to embed the placement of the equipment and the efficient material flow
• Modeled cost justification on the savings calculated by time study and simulation
Yogurt Creation Simulation (San Luis Obispo, CA) Fall 2010
• Created a logical model to visualize statistical fluctuation and dependent events taking place
• Work study was done to establish relative probability distributions for inter-arrival and at-location times
• Verified the simulation model with the logically model, and identified bottlenecks
• What-if analysis with addition workers and combining stations were looked at for future improvements
ISO 13485 Implementation Project (Quality Engineering Report) Fall 2010 Fall 2010
• Observed the requirements for a successful implementation of ISO 13485
• Compared and contrast ISO 9001 with ISO 13485
• Became familiar with Gap analysis, and its procedures
Additional projects consisted of: Cash Flow Analysis, Sensitivity Analysis, Root Cause Analysis, and DOEs
Skills:
Computer Skills: Microsoft Office, MiniTab, Microsoft Visio, Microsoft Project, Pro/Engineer Wildfire, ProModel, SolidWorks, Photoshop, VBA, HTML
Languages: Orally fluent in Guajarati and Hindi
Interest: Six Sigma, Consulting, Business Development, Manufacturing, Engineering, Project Management, APICS
Extra-Curricular Activities/Clubs/Honors:
Teachers Assistant (Simulation: Integrated Manufacturing Systems) April 2011-June 2011
Lectured on how to model, verify, validate, analyze and report systems
Tutor for College of Engineering (15 hours per week) April 2008-Present Tutor students in engineering, mathematics, statistics, and chemistry courses
Indian Student Association (ISA) Fall 2007-Spring 2011
Current Position: Vice President
Alpha Pi Mu (Industrial Engineering Honors Society) April 2010-Present
Dean’s List Recipient Fall 2009-Winter 2010, Spring 2011
Golden Key International Honour Society (Member)
APICS Case Study Competition (Team Lead, 3rd place Graduate Level)
Case: Loss of single source vendors overseas with high regulations.