Post Job Free
Sign in

Asst Manager Survey, Total Station, Auto Cad, Auto cad Civil 3D

Location:
Surat, GJ, 394230, India
Salary:
$20000.00 US dollar per month
Posted:
August 28, 2012

Contact this candidate

Resume:

CURRICULUM – VITAE

Of Sandeep Tiwari

Vill + Post- Chandrauta (Mashandih) Cell Phone: 093********

Via – Fazilnagar, Dist. - Kushinagar ***************@********.***

(U.P.) Pin No.274401 ***************@**********.***

PROPOSED POSITION : Chief Surveyor / Survey Manager

NAME : SANDEEP TIWARI

PROFESSION : Civil Engineering

DATE OF BIRTH : 21-07-1979

NATIONALITY : Indian

RELIGION / CASTE : Hindu (Brahman)

_________________________________________________________________________________________________

KEY KNOWLEDGE: -

I have more than 13 year experience in the field of Survey / Design / Q.S. in various Highway Projects, and Master Plan Survey of various cities & Hill area. My work spectrum covers all type Survey, Traversing, layout of Road & Structures, Design of Horizontal & Vertical Alignment, Preparation of Cross Section, using of modern instrument Total Station, proficient in Software like “MS-Office, Auto Cad, Designing Software Auto cad Civil 3D & Land Desktop, and Auto Plotter & Road Estimator”.

EDUCATIONAL QUALIFICATION: -

EXAM BOARD COLLEGE SUBJECT YEAR % AGE

Metric U. P. Board

Allahabad N.I.C.Pateherewa

Kushinagar Science 1994 55.16

Diploma B.T. E Lucknow

(U. P.) Govt Polytechnic

Jhansi Civil Engg. 1999 67.31

CARRIER OBJECTIVE:

I like to seek the position that offers me challenging projects, which will nurture and bring forth the best I have to offer to the organization & continuously add the knowledge & give back substantial returns to the company.

DESCRIPTION OF MY DUTIES :-

Preparation of Cross Section & Quantity calculation for each layer of Road (Cutting / Filling Area) in Road Estimator.

Analyzing of Quantity variation during laying.

After joint checking, preparing the Layer sheet as per layer executed and comparison thereof with the Designed Layer sheet data for billing purpose.

To prepare method statement for survey work and keeping all the survey records with proper documentation.

To guide the surveyors about how to improve the survey activities to meet the client’s requirements.

Checking of Instrumental errors and Calibration of Survey accessories and Instruments like regular calibration of Auto Level, Prism rod etc.

Topographical survey for new alignment, Access Road, Junction, Inter-Section Road.

To open the execution front by Total Station Traversing with adjusting the Traverse error, TBM Fixing/ Checking with TBM error adjusting, Traverse Shifting, OGL, Land Topography, Setout alignment of roads with proper curves (like simple, reversal or transition curve), Setting out points for Structural foundation and structures.

Preparation of Survey Plans and Sections, Contour Plans.

Design of Horizontal Alignment & Vertical Alignment as per suit and Site or any reason.

Preparation and checking of sub-contractors bill and quantities.

Monitoring of all survey related works and staff to run the execution work in a smooth manner.

Co-ordinations and attending meeting with client, consultant, project manager and other associate departments.

Preparation / Submissions of Lay out Drawing of Bridges & Culverts and Survey Related Data / Documents.

Liaison with administration for land acquisition, Utility sifting–site clearance uprooting for highway projects

Preparation of Weekly & Monthly Survey Activities, Progress Report and Progress strip chart.

Calculations of Super elevation, Toe line, Profile Corrective Course, Well Shifting, and Tilting & Sinking of Bridges in Auto Cad & Excel.

Preparation of Grid Sheet level for each layer (Subgrade, G.S.B., W.M.M., D.B.M. and B.C.) in Road Construction.

EXPERIENCE RECORD : - 13 YEAR

1. DURATION : - Feb - 2011 to Till Date

POSITION HELD : - Manager Survey

EMPLOYER : - Isolux Corsan India Ltd.

CLIENT : - NHAI

CONSULTANT : - Sheladia Associates & Consultants (India) Pvt. Ltd

NAME OF WORK : - 4/6 Laning of Gujarat / Maharashtra Border Surat-Hazira Port Section of NH6 in the State of Gujarat Under NHDP Phase III on DBFO Basis from KM. 0+000 to 132+913.

PROJECT COST : - 1100 Crore

2. DURATION : - Aug - 2009 to Jan-2012

POSITION HELD : - Manager (Design / Survey)

EMPLOYER : - C & C Construction Ltd.

CLIENT : - HPRIDC

CONSULTANT : - The Louis Berger Group, Inc USA

NAME OF WORK : - Widening and Strengthening of Una-Barasr-Bhota-Bhamala-kalkhar-Ner Chowk Road Section Pkg: No SRP/RIDC/HP/3

PROJECT COST : - 100 Crore

3. DURATION : - May - 2008 to July- 2009

POSITION HELD : - Asst. Manager

EMPLOYER : - Continental Engineering Corporation.

CLIENT : - NHAI

CONSULTANT : - Consulting Engineering Services (India) Private Limited.

NAME OF WORK : - Four Laning of Hyderabad – Bangalore Section of NH-7 from Km 293.700 to Km 335.580 in Andhra Pradesh Under North South Corridor Contract Package ADB-II/ C- 12

PROJECT COST : - 316 Crore

4. DURATION : - Aug-2005 to April-2008

POSITION HELD : - Engineer

EMPLOYER : - M/S Punj Lloyd Ltd

CLIENT : - NHAI

CONSULTANT : - Bceom - Stup Consultants and Aarvee associates (J.V.)

NAME OF WORK : - Widening and Strengthening of existing National Highway from Two Lane to Four Lane (KM: 1065.00 to 1093.00 of NH-31) of Guwahati to Nalbari section (Contract Package EW- II AS-05) under phase-II Programme of East West Corridor Project in Assam).

PROJECT COST : - 200 Crore

5. DURATION : - May 2002 to July-2005

POSITION HELD : - Survey In-Charge

EMPLOYER : - M/s. Vijay Expressway Engineers Ltd

CLIENT : - U.P.P.W.D.S.R.P. Jaunpur (SH 56)

CONSULTANT : - M/s. Scott Wilson Kirkpatrick & Co. Ltd.

NAME OF WORK : - Up gradation of U.P. State Highway Road World Bank Project from Jaunpur to Mohammadpur. Including Major Maintenance of Jaunpur City Portion (U.P.S.R.P. -03-045-Km.).

PROJECT COST : - 56 Crore

6. DURATION : - July 1999 to April 2002

POSITION HELD : - Surveyor

EMPLOYER : - M/s. Vikash Engineers & Consultants

NAME OF WORK : -

A. Master Plan Survey of various cities (Gorakhpur, Allahabad, Dehradun, Haridwar, Moradabad & Jhansi).

CLIENT : - Development Authority of Various cities

B. Topographical Survey for Contour Plan in village Baruva Hamirpur & village Shahnagar Fatehpur (U.P.)

CLIENT : - Bhoomi Sudhar Nigam U.P.

SUPERVISION : - European Union

C. Detail Survey & O.G.L. recording of the road (85KM) for P.M. Gramin Sarak Yozana in District Chitrakoot U.P

CLIENT : - U.P.P.W.D.

D. Water Supply & Sewerage Plan Survey in Gomtinagar Lucknow (U.P.), Kotdwar, Doiwalla and Dugadda (Uttaranchal).

CLIENT : - Jal Nigam

E. Topography, Leveling and Contouring survey for hydro projects, in Chamba & Barot (Himanchal Pradesh), Durga Pipal in Nainital (Uttaranchal) and Heerpora and Shopian (Jammu & Kashmir)

PERSNOL INFORMATION : -

SEX : Male

MARITAL STATUS : Married

FATHER’S NAME : Shri Ram Pyare Tiwari

TEMPORARY ADDRESS : Shri Rajendra Tiwari

C/O Sharat Chandra Sriwastav

14/334 near Chhota Park

New Colony Deoria (U.P.)

Pin No. 274001

PASSPORT NO. : G3409103

PAN CARD NO. : AHJPT1584A

HOBBIES : Painting, Writing, Singing & Playing Chess

STRENGTHS : Ability to work under pressure, quick learner, adaptable, creative and imaginative with An "I can" outlook.

LANGUAGE KNOWAN :

Language Read Write Speak

Hindi Excellent Excellent Excellent

English Excellent Excellent Excellent

I, the undersigned, certify that to the best of my knowledge and belief, this C.V. correctly describes my qualifications, my experience and myself. I undersigned that my willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

PRESENT CTC : - 1250000.00 / Annum

ACCEPTED CTC : - Negotiable as per depending site conditions.

Earliest Join Time : - 1 Month

Date: - Yours faithfully

Place: - (SANDEEP TIWARI)



Contact this candidate