Post Job Free
Sign in

Mechanical Project

Location:
United States
Posted:
March 21, 2012

Contact this candidate

Resume:

LUPU CATALIN

Mechanical Engineer

PERSONAL DETAILS

_________________________________________________________

Place of birth: ROMANIA

Birth date: 24. 08.1968

Address: Piatra-Neamt, Romania

Civil status: married , one child

Tel: + (40-233-***-***

Mobil: + (40-740-***-***

E-mail: ******@*****.***

Driving license: Romania-EU, UAE , Saudi Arabia

______________________________________________________________________________

Availability: immediately upon request

References: available on request

______________________________________________________________________________

FOREIGN LANGUAGES

_______________________________________________________________________________

English - fluent

Italian - basic knowledge

French - basic knowledge

EDUCATION

_______________________________________________________________________________

Technical University “Gheorghe Asachi” – Iasi, Romania 1988 - 1993

“M.Sc” in Mechanical Engineering - Machine and Tools

COMPUTER ABILITIES

_______________________________________________________________________________

Operation system WINDOWS NavisWorks 2011

Microsoft Office 2003-2007 SolidWorks 2001-2010

Microsoft Project 2000 Inventor8

AutoCad 2000-2012 AlphaCAM2000-2003

AutoCad Plant 3D 2010 CAD Works – Pipe

Microstation Advanced Pressure Vessel 8.08

EXECUTIVE SUMMARY

_______________________________________________________________________________

Site Construction (Mechanical/ Piping) Superintendent ,Supervisor /Project Management (PMC-role)/ Designer, with 18 years experience on the Oil & Gas Industry, Middle East, Arctic and Far East areas in the:

Petrochemical, Oil/Gas Processing, Oil/Gas Pipelines construction, Refinery, LNG, Power Generation, Power & Desalination, Waste water Treatment, Cement, Projects having developed:

• Supervisory skills of multi-national workforces for the duration of construction phase (civil, structural equipment, piping , mechanical ,etc);

• Proficiency in steel structure, piping/supports fabrication and static equipment erection as well as pressure (hydro/pneumatic) testing (day & night shift);

• Specialized in “Plant handover system”, coordinating activities of Mechanical Completion and Pre-Commissioning works;

• Familiar with reading and using P&ID’s, piping isometrics, supports catalogs, Test-Packages, Vendor documents

• Experience in "Project Management"-PMC role (5 Projects), practiced in planning, monitoring and reporting processes.

• Very good knowledge of international (American) standards and codes (Especially: ASME B31.1/B31.3/B31.8, API 5L, ASTM) and IPS ( Iranian Standard )

• Administrative aptitude and computer literacy (see Technical Abilities) Incident Investigation & Reporting, Working at Height, Confined Space, Permit to Work etc., act as Duty Emergency Manager)

WORK EXPERIENCE

2010 - till present________________________________________________________________

ROMPETROM RAFINARIE Navodari, Romania

Extension Hydrogen Production Plant 40000 Nm2/h

Piping Supervisor

• Coordinate making piping spools and piping supports; prepare chart spools erection, monitoring installation piping.

• Chemical cleaning, pneumatic and hydro leak testing –low and high pressure, leak testing nitrogen, helium, cleaning chemical inhibitors, valve and pumps station.

• Modify 3D piping drawing, update ISO drawing and make red correct, put labels for all static and dynamic equipments, valves and instrument items.

Mar’2009-May 2010_____________________________________________________________

ALSTOM - UAE-Dubal/ Dubal Aluminium

Piping Superintendent

• Gas Turbine (GS) and Steam Turbine site (ST) for DUBAL area.

• Overall monitoring of piping (CS, SS, galvanized, copper) and supports installation for conventional class systems

• Supervision of hydrostatic and pneumatic testing of piping systems installed

• Supervisory skills of multinational workforces for the duration of construction phase (civil, structural, equipment, piping, etc)

• “Field-routed” supports design, supervising the fabrication and installation of these

• Create detailed part drawings, sketches and customer input,

• Proficiency in piping/supports fabrication & erection as well as pressure (hydro/pneumatic) testing (day & night shift)

• Familiar on reading and using P&ID’s, piping isometrics, supports catalogs, Test-Packages, Vendor documents

• Incident Investigation & Reporting, Working at Height, Confined Space, Permit to Work…, act as Duty Emergency Manager)

• Produce drawings used in the manufacturing and assembly of systems, sub-systems and components.

• I check and supervise isometric lines erection in all site which I have responsibility and I propose to engineering department solution for a good erections. I advised mounting steel structure for pipe rack and steel structure for mechanical items.

• Create detailed part drawings, sketches and customer input. Check dimensioning of parts,

materials to be used, relation of one part to another, and relation of various parts to

whole structure or project using Autodesk software (both 2D and 3D modeling).

• Coordinate with document control process changes, deviations and modifications to products consistent with contractual requirements.

• I coordinated the pressure tests, following the documentation of test paket pressure, because pressure test could be done with water, air, inert gas (nitrogen) at a certaini follow temperature, pressure, duration, the points for emplacement blinds for route isolation ( if requirement ).

• I check and solve punch-list .

• I supervise all hydrotest activity.

• I correct this pressure depending on elevation route. In special case I use plug test.

I coordinated the flushing ( with steam and outer substances cleaning ) and conservation of the routes, paying attention to the flow rate of clean time and its flow.

• I work for corrosion protection and abrasion protection pipes.

• Conservation and vessel routes, the introduction of nitrogen, nitrogen is controlled indirectly concentration (oxygen concentration) and regularly checking the pressure.

Dec’2008-Feb’2009______________________________________________________________

CHIYODA (EPC CONTRACTOR) - RUSSIA-SAKALIN

Sakhalin II-LNG & Oil Export Terminal

Mechanical Superintendent

• Day & Night shift Test Coordinator

• Superintendent and Plant overall monitoring and supervision in night shift.

• Making upgrades and revisions to existing oil and gas process facilities, undertake site as built surveys for existing critical work as directed by Engineering.

• Monitoring the daily site multidisciplinary activities (civil, steel-structural, mechanical, piping, E&I, painting & insulation) of EPC Contractor: AKSI (a joint venture between Aker Kvaerner and China Petrochemical Corporation) in the Polyethylene Unit in term of: HSE, Quality, Planning and Progress status

• Leading a crew of Supervisors and Field Inspectors by different disciplines; progress analysis and compilation of site quality inspection results

• Daily and weekly Reports to the Company Management related to site achievements, concerns; participating in weekly management construction review meeting

Oct’2007-Nov’2008______________________________________________________________

DOLPHIN Energy QATAR - OXY Joint-venture (Client)

Ras Laffan-Gas Processing Plant

Piping Superintendent

• Supervising equipments, piping, HVAC other and close-out of final punch-lists.

• Upgrades and revisions to existing oil and gas process facilities

• Prepare detailed Bills of Materials from the designs to procure all components in line with Company specifications.

• Maintain a Drawing filing system in line with Company standard Drawing numbering system

• I controlling mode of realization the piping project in optimum safety ,techniques and time parameters.

• Prepare mechanical design and detail drawings for Field Construction Projects to support new projects.

• Supervising of site personnel (“Back Punch Team”) during piping mechanical completion work/pre-commissioning phases for Unleaded Gasoline / Low Sulphur Gas Oil Unit of Plant reporting directly to Site Manager

• Supervision of punch-list items ,Test-Packages- related to piping construction works clearance -issued by QA/QC Department of GRINAKER as well as EPC Contractor (TECHNIP) and Client (PARSONS).

• Harmonization between Construction-site and Pressure-test Team relating to Test-packages status (priorities/progress)

July 2006- Sep’2007_______________________________________________________________

SAIPEM PPS APROJECT Ltd, Saudi Arabia

WIPS (Water Injection Pumps Station) project in Khurais area

Piping Supervisor & Mechanical Designer

• Assist engineers in the preparation of scopes of work, cost estimates, schedules and equipment specification

• Technical responsibility for interpreting, organizing, executing, and coordinating Design Tasks.

• Modify if is case isometric lines, layouts and another mechanical drawings.

• Check completed layouts and drawings for clarity, completeness, conformity to standards, procedures, specifications, and accuracy of calculations and dimensioning.

• Produce drawings used in the manufacturing and assembly of systems, sub-systems and components.

• Check and supervise isometric lines erection in all site which I have responsibility and I propose to engineering department solution for a good erections.

• Supervise hydro test activity.

• Advise mounting steel structure for pipe rack and steel structure for mechanical items.

• Control realization the piping project in optimum safety, techniques and time parameters.

• Create detailed part drawings, sketches and customer input. Check dimensioning of parts, materials to be used, relation of one part to another, and relation of various parts to whole structure or project using Autodesk software (both 2D and 3D modeling).

• Coordinate with document control process changes, deviations and modifications to products consistent with contractual requirements.

• Check and solve punch-list.

• Coordinate the pressure tests, following the documentation of test packet pressure so that pressure test could be done with water, air, inert gas (nitrogen) at a certain follow temperature, pressure, duration, the points for emplacement blinds for route isolation (if requirement).

• Correct this pressure depending on elevation route, using plug test in special cases

• Coordinate the flushing (with steam and outer substances cleaning) and conservation of the routes, paying attention to the flow rate of clean time and its flow.

• Work for corrosion protection and abrasion protection pipes.

• Conservation and vessel routes, the introduction of nitrogen, nitrogen to be controlled indirectly concentration (oxygen concentration) and regularly checking the pressure.

May 2005-June 2006_______________________________________________________________

GA. PROCO CHEMICALS, Romania

Department Projects

Designer Supervisor

• Implicated in the multidisciplinary activities as: Mechanical and, Steel-Structural, Static Equipment, Piping (under/above ground) and Engineers from planning and HSE departments.

• Prepare and report to Company Management the progress, areas of concern and mitigating actions; participating in weekly construction review meeting.

• Made new drawings and modify existing projected for ammonia factory.

• Coordinate transmission and distribution of specifications, standards and practices, Comment on Project design documents, Supply design consultants with information for all design issues including network studies and interfaces.

Apr’2004- May 2005_______________________________________________________________

SC YARNEA, Italy

Department “Projects and Investments”

Adviser and analysis of Mechanical works Sub- Contractors

• Made project and advise for project investments-air piping, heating pipe, bearing pile

• Supervise sundries investments (manipulate robot, evacuation fuzziness, piping routs etc.) from beginning (initial technical data, capital resource, technical solutions, maintenance cost) until end and how behavior are these in the field (in some period)

• Provide support to Sales Department and field changes.

• Review construction shop drawings and submit of materials.

• Participate at meetings with Contractors, Consultants, suppliers and Client

• Identify, initiate and track Trend issues as and when they may occur.

• Interpret design drawings and specifications.

• Designing study, project prototyping & budgeting of Integrated Security Systems

• Provide technical leadership in the analysis, design, development and implementation of integrated security systems.

June 2001- Ap’2004__________________________________________________________________

SC FYBREX ENGINEERING, Romania

Project Coordinator

• Coordinate a team of 10 mechanical engineers

• Team leader for dynamic and static equipment

• Project coordination – machine parts, pressure vessels, storage tank, transporting piping, gases, liquids, solids.

• Realization of technique design for ENCO Company/ Switchland, Noyvallesina Company /Italy for route process-HTY –High Technology Yarns

• Prepare piping layouts, equipment layouts, installation details, piping and tie in schedules, Isometrics valve lists and material take-offs from P & IDs and site plot plans.

• Assist in review of vendor documentation, including the incorporation of mechanical detail within the design.

• Review existing equipment and piping and produce as is status to enable design of additions to proceed.

• Responsibility for mechanical design and engineering within the nominated project.

• Reporting to the Operations Manager or Project Manager as appropriate.

• Receive the basic data ( initial pressure, final pressure, flow rate)

• Calculate thickness and diameter of pipes; make the pipes route drawing and bill of materials.

• Stay in the field for supervise execution project from beginning until end of job.

• Locate electric cable escort for heating pipe and pipe escort from sundries technologic pipes (water, acid, lactam)

• Calculate and make route pipe for solids transporting, air conveyor (granules PA6 with nitrogen that factor transport).

• Receive from the engineers chemical department drafts about diverse constructions forms of vessels and storage tank, and with Advanced Vessel program make calculation of thickness.

• Make executions plants for vessel or tanks.

• The standards in the use was ASME

• The drawing mechanical parts from diverse assembly.

Sep’1994 - June 2001__________________________________________________________

SC FYBREX ENGINEERING, Romania

Department Caprolactam & Anorganic

Mechanical Engineer

• Maintenance, repair chemical static and dynamic equipment: pumps, centrifugal machine, belt speed, air blower, piping, drayer with belt wiper, compressor air, drayer, air filter, chillers.

• Order and schedule delivery of materials.

• Prepare installation subcontractor bidding documents and negotiate subcontracts.

• Review drawings of system integration.

• Prepare project billing revenue forecasts and schedule of values.

• Made and follow plans for sustenance, running repair, parts supply and made link among production department with supply bureau and service bureau.

Oct’1989 - Sep’1994___________________________________________________________

SC FYBREX ENGINEERING, Romania

Mechanical Technician

• Assembly machines

• Maintenance, repair chemical static and dynamic equipment: pumps, centrifugal machine, belt speed, air blower, piping, drayer with belt wiper, compressor air, drayer, air filter, chillers.

• Made and follow plans for sustenance, running repair, parts supply

• Testing and troubleshooting of machines



Contact this candidate