Post Job Free
Sign in

Power Plant Engineer

Location:
Hill, United Kingdom
Posted:
November 23, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

|MUKESH KOTAK | |

|FLAT # **th & 20th, 5th FLOOR | |

|JAZEB-2 APARTMENT, OPPOSITE GRID| |

|STATION | |

|QASIMABAD / HYDERABAD (PAKISTAN)| |

| | |

|Mobile: +92-333-******* | |

|Email: ***********@*******.*** | |

WORKING EXPERIENCE

01 JULY, 2012 - TO-dATE

Worked with M/s. EDCOM Engineering Solutions (Pvt.) Ltd. as

Electrical Engineer (Erection & Comissioning) on the project of 55.3 MW

(ALSTOM) GTPP Najaf-Iraq. Job responsibilities include:

. Monitoring / Supervising the erection and installation

activities of GCB, Auxiliary Transformer, Main

Transformer, IPB, MV Switchgear, LV switchgear, DC & UPS, Motors

Cable Laying & Termination

and all other associated to Open Cycle Power Plant.

. Commissioning of cooling System, Fire Fighting System, Main

Transformer, Auxiliary Transformer, MV Switch gear, LV Switch gear,

Essential Switch gear etc

01 SEPTEMBER, 2009 - 31 May, 2012

Worked with M/s. O & M Solutions (Pvt.) Ltd. as Project Engineer

(E&I) on the project of 560MW (GE) CCPP Bin Qasim Power Station-II

Project. Job responsibilities include:

. Technical evaluation of Manuals/Procedures/Material Approval

Submittals

. Review and approval of the Contractors detail design and drawings

. Transformer's FAT (Factory Acceptance Test) witnessed in

manufacturing facility at China for the client (170 MVA x 3 & 250

MVA x 1)

. Interactive participation in Daily and Weekly progress review

meetings

. Performing site work Requests / Inspections

. Reviews and implementation of Construction and E&M Schedules

time line at site

. Monitoring / Supervising the erection and installation activities

of Gas Insulated Switchgear (GIS), cable laying / Termination of

220kV XLPE Power Cables, MCC, MV/LV, Motors Cable Laying &

Termination and all other associated to Combined Cycle Power Plant.

Power Plant O&M Experience

Low Voltage (0.4 KV) Motors and Switchgear.

High Voltage (6.6 KV) Motors and Switchgear.

220KV and 132KV Oil Filled Cables, 6.6KV XLPE Cables & their jointing

Maintenance of the Electrical Equipment's.

Installation, testing & commissioning of 220 V DC Batteries.

Control and Protection of Generators, Transformers, H.V / M.V / L.V

Switchgear.

220V & 24 V DC Systems & Chargers, 30 KVA UPS & Inverters.

Excitation and Auto Voltage Regulation System of 9E GE Generators.

C.Ts, P.Ts & Measuring instruments such as meters and transducers.

20 MARCH, 2008 - 31 AUGUST, 2009

Worked with M/s. O & M Solutions (Pvt.) Ltd. as Assistant Engineer

(E&I) on the project of Muridke 234MW (GE) CCPP Project. Job

responsibilities include:

. Inspection carried out for Material & Equipment Shipments at

site, as specified

. Laying of Grounding / Earthing Mesh for Complete Power Plant

. Projects various job carried out accordingly to Technical

Provisions & Approved Drawings

. Review and approval of the Contractors detail design and

drawings

. Design problem solving discussion as per the actual site

situations

. Prepare the final Punch List / Deficiencies List for the

executed works

. Monitoring/Supervising the erection and installation activities of

Encapsulated Bus Bars, Generator Breakers (GCB), 105MVA / 13MVA /

2MVA / 1.5MVA Transformers, Gas Turbine Generators, Steam Turbine

Generator, Gas Turbines (GE), Steam Turbine (SKODA), 6.6kV / 0.4kV

Switchgears, 4.6 MW Diesel Generator, Emission Monitoring System,

132kV Switchyard (Circuit Breakers, Current Transformers, Voltage

Transformers Lune Traps, Surge Arresters, Combined Measuring

Transformers, Disconnectors) Static Frequency Converter (SFC),

Cable Laying, Cable Termination and all other associated to

Combined Cycle Power Plant.

01 APRIL, 2007 - 19 MARCH, 2008

Worked with M/s. BARQAAB Consulting Services (Pvt.) Ltd. as Jr.

Engineer (Electrical) on the project of 500kV Muzaffargarh-Gatti

Transmission Line & 500kV Muzaffargarh-Gatti Substation Extension

Project. Job responsibilities include:

. Conductor stringing for Bus-Bar Works

. Erection for Auto-Transformer (200MVA-1, Shunt Reactor

(37MVAR-1 and all other

Associated Grid Station

. Inspection / Testing of Sub-Station Equipments

. Inspect Transmission Line & Sub-Station Foundation

Construction Work

. Stringing of four bundle Conductor / Shield wire / OPGW

. Drawing Reviewed at site & its final verification As-Built

Drawings

. Verifications of Measurement sheets / Invoices on monthly bases for

the executed works at Site by contractor

. Erection of Steel Structures (Towers, Gantries & Equipments)

. Cable Laying & Termination for Equipment to its Reference

Panels

. Inspection carried out for Material & Equipment Shipments at

site, as specified

. Laying of Grounding / Earthing Mesh for Gantries & Equipments

01 FEBRUARY, 2007 - 31 MARCH, 2007

Worked with M/s. BARQAAB Consulting Services (Pvt.) Ltd. as Jr.

Engineer (Electrical) on the project of 500kV/220kV (NTDC/KESC)

Interconnection Project. Job responsibilities include:

. Review and approval of the Contractors detail design and

drawings

01 January, 2006 - 31 January, 2007

Worked with M/s. Pakistan Engineering Services (Pvt.) Ltd. as Jr.

Engineer (Electrical) on the project of Digital Data Base, Geographical

Mapping and Technical Study / Master Planning of Power Distribution

Network of Electrical Department of Azad Jammu & Kashmir. Job

responsibilities include:

. Calculation of voltage drop

. Power loss of HT & LT network

. Technical analysis of HT / LT existing system network and for

year 15

. Preparation of technical proposals for HT / LT distribution

network

. Bill of quantities and cost estimates

. Planning and routing of H.T & L.T lines for the

electrification of villages.

01 JULY, 2005 - 31 DECEMBER, 2005

Worked with M/s. Pakistan Engineering Services (Pvt.) Ltd. as Jr.

Engineer (Electrical) on the project of Malakand-III Hydropower Project

81 MW. Job responsibilities include:

. Inspection / testing of equipment and materials at

contractors premises/works

. Review and approval of the contractors detail design

31 January, 2005 - 31 JUNE, 2005

Worked with M/s. Pakistan Engineering Services (Pvt.) Ltd. as Jr.

Engineer (Electrical) on the project of Satpara Dam Project 13.5 MW. Job

responsibilities include:

. Inspection/testing of equipment and materials at contractors

premises

. Review and approval of the Lot: 1A & 1B Contractors' detail design

and drawings (design/shop drawings)

ACADEMIC ACHIEVEMENTS

. B.Sc. Electrical Engineering (Power) from Quaid-E-Awam University

of Engineering Science and Technology Nawabshah (2005) Grade-A /

1st-Division

. Intermediate from WAPDA Degree Science College Guddu, Kashmore

(2000)

. Matriculation from WAPDA High School Guddu, Kashmore (1999)

Internships

20 JuNE, 2004 - 15 july, 2004

Worked with Thermal Power Station WAPDA Guddu as Trainee Engineer on 600

MW Combined Cycle Power Plant of Electrical Section.

01 JuLY, 2003 - 14 july, 2003

Worked with Karachi Electric Supply Corporation (BQPS-I Karachi) as

Trainee Engineer of Electrical Department.

15 July, 2003 - 14 August, 2003

Worked with SIEMENS PAKISTAN Engineering Co. Ltd. (Karachi) as Trainee

Engineer on business unit of small & large derives (Motors) SLD Section.

01 JuNE, 2002 - 31 july, 2002

Worked with Thermal Power Station WAPDA Guddu as Trainee Engineer on 600

MW Combined Cycle Power Plant of Electrical Section.

Additional Courses

Certified GE (France) Course on "EX2100 Regulator Maintenance" On

21st - 25th February, 2011 at "KESC (Karachi Electric Supply Company)

560MW CCPP Bin Qasim".

Certified GE (France) Course on "Mark Vie Maintenance" On 07th - 17th

February, 2011 at "KESC (Karachi Electric Supply Company) 560MW CCPP Bin

Qasim".

Certified Course on "Programmable Logic Controller" On 04 - 09 August

2008 at Skill Development Council Islamabad (SDC).

Short course on "Nuclear Engineering" On 23rd October 2003 at Mehran

University of Engineering & Technology Jamshoro.

Computer Skills

Proficient in the following

. Excellent hands on MS Office (MS Word, MS Excel, MS Power Point, MS

Outlook), AutoCAD, Adobe Photoshop, Smart Draw, Mat Lab

PERSONAL DETAILS

Father's Name Dhanpat Kotak

Date & Place of Birth March 04, 1981, Mithi (Tharparkar)

N.I.C. # 43104-0578073-7

Domicile Mithi (Tharparkar)

Profession Electrical Engineer (Power)

Religion Hindu

Working Experience 7.9 Years

Nationality Pakistani

Marital Status Married

PEC Registration Elect-24244

Passoport # AA4460731

References

To be furnished on request.



Contact this candidate