JEANETTE B. MCCLOY
PO Box ***
Hollister, Ca. ***23
Mobile: 408-***-**** fn5sqn@r.postjobfree.com
PROFESSIONAL EXPERIENCE
DIVERSIFIED FIRE PRODUCTS/UTCSF, FREMONT, CA 2010 – 2010
A leading provider of state of the art fire detection systems and services to Silicon Valley.
CAD Operator
Prepared drawings and clean up Architectural plans for spots and dots of Fire Alarm devices, including cabling layout, riser diagram, calculations & submittals for the whole package, and also doing as-built drawings.
DIVERSIFIED FIRE PRODUCTS, Campbell, CA 2007 – 2008
A leading provider of state of the art fire detection systems and services to Silicon Valley.
CAD Operator
Prepared drawings and clean up Architectural plans for spots and dots of Fire Alarm devices, including cabling layout, riser diagram, calculations & submittals for the whole package, and also doing as-built drawings.
SOUTH EAST ASIA COMPANY (SEACO) 2005 – 2006
(Gen. Con) THERMO ENGINEERING INC. Dubai UAE
CAD Operator / CAD TEAM
Projects Undertaken: Dubai Airport terminal 1, Concourse and Dubai Airport Hotel
Prepare and produce shop drawings such as Combined Services Layouts (CSD) (ISD) and Combined Services Section and prepared elevation for all services including flow rate for H-VAC and Preparing BL for all services.
Execution of mechanical drawings for Fire fighting, Drainage & HVAC layout, especially for hot / cold water and drainage.(both above and below ground using computer-aided design drafting)
Coordinates with other trade / discipline contractors (e.g., Electrical, plumbing, Architectural, Civil, etc.) concerning the works.
TRISILCO FOLEC (KEPPEL TELECOM) 2004 – 2005
Makati City, Philippines
CAD Operator / CAD TEAM
Responsible for the preparation of design drawing based on the designer’s conceptual layouts, check and revised plans as commented by the engineers.
Preparing construction drawings and site development plan for GSM Outdoor Cell site & indoor building solution, & rooftop.
Responsible for the preparation of shop drawings and as-built drawings for steel and concrete structure, foundation plan, electrical layout and site development plan.
WSP ASIA PHILIPPINES INC. 2004 – 2004
CAD Operator / CAD TEAM
Projects Undertaken: North Staff, Mandarin & other UK Project
Prepared Mechanical & Electrical layout including Drainage System & Mech. & Elect. Diagram. And also prepared
x-ref drawing for individual services such as Mechanical, Electrical, Sanitary/Plumbing Fire Protection and other services including Architectural Plan.
LINDE REFRIGERATION PHILIPPINES INC. 2002 – 2004
CAD Supervisor / CAD TEAM
Projects Undertaken: Friendly Mart dipolog, Big- R Cainta, Puregold, Walter mart, SM Supermarket, Dasma.
Prepared Architectural plans and Layout the Mechanical, such as Floor drain stub-out, Refrigeration pipe routine plan, Machine room Plan, section details, Cold room plan layout, section details, & Mechanical diagram for freezer & chiller range. Produced coordination drawings for new projects and revised plans. Controlled engineering drawings (Soft & Hard copy). Filed and logged incoming and outgoing as well as electronic files. Prepared AS-BUILT plan for submissions to the owner/client. Inspect to the site for As-Built plan & Shop Drawing purposes. Prepared Transmittals & arrange the drawing for the owner/client.
HTE INTEGRATED SERVICES, INC., PHILIPPINES 2000 – 2002
CAD Operator / CAD TEAM
Projects Undertaken: Bay Garden Condominium, Montgomery Place Project, Embassy Pointe Tower and North Gate Cyberzone.
Prepared Architectural plans and Layout the Mechanical, Electrical, Sanitary / Plumbing Services & Fabrication. Draw coordination drawings for new projects/revised. Control all the engineering drawings (Soft & Hard copy) then file and Log the incoming and outgoing and also the electronics files. Prepare AS-BUILT plan for submissions to the owner/client. Inspect to the site for As-Built plan & Shop Drawing purposes. Prepared Transmittals & arrange the drawing for Sub-contractor. Encoding BOQ make a works programmed schedule (using in Microsoft Project Software) checked the drawings & Assist to my subordinate if my immediate superior is not around. Designed the furniture layout and also the lighting & power fixture by using Auto cad 2000.
G & W ARCHITECTS / GLOBAL DESIGN INC. DIVISION 1997 – 1999
CAD Operator
Projects Undertaken: Santa Rosa Mall, Digitel Projects, Yokohama.
File and log all the Engineering Drawings and the electronics files. Prepares all Structural, Architectural, sheet, and Mechanical drawings. Make a Transmittal Sheet, Prepare drawing for blue print duplication of various plans. Make a detailed drawings (like example footings, beams, columns, section and details of water tank for the mechanical). And prepare a 4 views elevation then the perspective drawings.
CONAIRE M & E MALAYSIA 1996 – 1997
CAD Operator
Projects Undertaken: Gurney Park Hotel, Ever Green Condominium.
Prepared Cost Analysis, taking of Quantity and Estimate Mechanical Works such as Ductworks and Piping Layout. Preparation of working drawings by using Auto cad Release 12.0, 13.0 & 14.0.
CONAIRE M & E PHILIPPINES 1994 – 1996
Draughtsman
Projects Undertaken: Renovation of Westin Philippine Plaza Hotel, Edsa Plaza Hotel and Jaka Tower.
Prepared Architectural plans and Layout the Mechanical, Electrical by Manual Drafting. Prepared AS-BUILT plan for submissions to the owner. Inspect to the site for As-Built plan & Shop Drawing purposes. Prepared Transmittals & arrange the drawing for Sub-contractor.
EBC ELECTRICAL ENGR. 1994 – 1994
Draughtsman
Prepared Architectural plans and Layout the Electrical by Manual Drafting.
EDUCATION
Undergraduate, Architecture Technology/Graphics Technology,
Technological University of the Philippines.