Thomas Garland Maughan
*** ********, *******, ***** *****
Cell: 936-***-**** E-Mail: ******@*****.***
Summary of Experience:
** ***** ** ****** ********** in the oil and gas related industry. My positions have ranged from Maintenance Superintendent, General Foreman, Foreman, Pipefitter, Project Expeditor/Coordinator, and Piping Designer. I was certified through NCCER as a pipefitter in 2000.
Computer Skills:
Business Software: MS Office (Outlook, Word, Excel), VPRM
TWIC Card holder.
------------------------------------------------------------------------------------------------------------
Job History:
5/11 to 8/11 Plant Engineering/Fluor Texas City, TX.
BP
Piping Design & Drafting
Responsible for the field walk down of P&ID’s. This is a major effort to update the facilities P&ID’s. Drawings are being “as built” redlined, then sent to CAD for update. Extensive research in documentum is involved to properly update.
-----------------------------------------------------------------------------------------------------------
2/11 to 4/11 The Shaw Group Jenkinsville, SC.
V.C. Summer Nuclear Station
Mechanical Maintenance Superintendent
Oversight for a specialty valve company performing all valve work for Re-Fuel 19 Outage. I worked one on one with the planners and schedulers to build a realistic schedule to follow. Review and verify contractors reported progress and ensure that the completed work was reflected in the project schedule.
------------------------------------------------------------------------------------------------------------
6/10 to2/11 Amec Engineering Houston, TX.
BP Horizon, Chevron Angola
Project Coordinator
BP Horizon oil spill, Angola flare enhancements
Expedite vendors and manage project/logistics documentation to meet project and deliverable requirements. Establish effective channels of communication with clients and provide timely and effective feedback on status of orders and their progress in fabrication, manufacturing, testing, inspection, schedule and delivery. Managed equipment for the BP oil spill in Port Fourchon, LA.
------------------------------------------------------------------------------------------------------------
9/08 to 6/10 Taylor & Hill Engineering Texas City, TX.
BP
Piping Design & Drafting Supervisor
Responsible for all “as built” walk down and sketching on the P&ID’s and Inspection isometrics. Field walk down included taking measurements, sketches, and field routing of new piping. Participated in the bidding process for services. Developed contract key dates and milestone dates that align with the overall project schedule.
------------------------------------------------------------------------------------------------------------
3/07 to 9/08 Valero Refining Port Arthur, TX.
Maintenance Pipefitter
Performed routine maintenance in the refinery. Done all fabrication in shop for special projects. Also, assisted with planning for unit activities. I assembled work packages for each maintenance task, ensuring that materials and manpower were available. I utilized previous repair history and condition monitoring data to ensure appropriate scope of work was developed. Had to notify all crafts of their requirement to provide input in the job plan.
------------------------------------------------------------------------------------------------------------
8/05 to 3/07 Taylor & Hill Engineering Texas City, TX.
BP
Piping Design & Drafting
Responsible for reviewing all field walk down documents. I had to check for quality and accuracy prior to being sent to CAD for updates. Redline master P&ID’s for cad update. I had to do field engineering walk downs which included taking field measurements, sketches, and field routing of new piping for all design issues on my projects.
------------------------------------------------------------------------------------------------------------
7/02 to 8/05 A & B Builders/CBI Beaumont, TX.
Premcor, Good Year, Liberty Fabrication Facility
Pipefitter/Foreman
Responsible for assisting engineering department in identifying tie-in locations, creating punch list’s, and tracking packages for system turnover. Assisted planners and schedulers in keeping the job scopes and schedule accurate. Helped plan and create job packages. Worked as a pipefitter/fabricator at the fabrication facility in Liberty, TX.
------------------------------------------------------------------------------------------------------------
1/90 to 7/02 Belmont Constructors/Furlow Services/De Jean Companies/Zachry Deer Park, TX.
Several projects in the Houston area
Pipefitter/Foreman/General Foreman
Fabrication, testing and erection of piping systems and components. Responsible for the step by step planning of all piping activities on project. Created work packages for activities, manpower loading, and tracking packages for system turnover.
Education:
1988 - 1989 West Monroe High School West Monroe, LA.
1985 - 1988 Hull-Daisetta High School Daisetta, TX.
2008 College of the Mainland CAD Texas City, TX.