James R. Swartz
**** **** **** ****** • Leawood, Kansas 66209
Mobile 913-***-**** Home 913-***-**** ************@*****.***
Professional Summary Sixteen years experience as a Multi-Family Project Superintendent.
Extensive knowledge and hands on experience in all phases of
Residential, Multi-family, Mixed-Use and Commercial construction.
Excellent managerial and customer relation skills. Able to prioritize
and manage multiple projects, schedules, budgets, and deadlines.
Professional experience
Senior Project Superintendent July 2008 – Nov.ember 2009
SNK – Texas Construction, Inc. • Dallas, Texas
• Allegro Addison, Addison, Texas
Project Superintendent September 2005 – July 2008
Camden Development, Inc. Mid-Atlantic Division • McLean, VA
• Summerfield at Morgan Station, Landover, Maryland
Project Superintendent August 1998 – September 2005
Global Construction Company • Houston, Texas
• Town Center at Camp Springs, Camp Springs, Maryland
• Westcott Reserve, North Charleston, South Carolina
• Bala Sands at Lake Sherwood, Orlando, Florida
• The Villages at Lions Gate, Overland Park, Kansas
• Cameron Chase, Morrisville, North Carolina
• Cameron Woods, Apex, North Carolina
• Supervised both North Carolina projects simultaneously
• Cameron River Ridge, Indianapolis, Indiana
Project Superintendent September 1996 – July 1998
Hanover R. S. Limited • Houston, Texas
• Weston Point, Overland Park, Kansas
Project Superintendent May 1994 – September 1996
Chancellor Builders • Houston, Texas
• The Bluffs, Austin, Texas
• Whisper Hollow, Austin, Texas
• High Point, Austin, Texas
• Pinto Ridge, Austin, Texas
Education University of Houston, School of Architecture, Houston, Texas
Personal Information United States Navy, Honorable Discharge
OSHA Ten Hour Certificate, Red Cross CPR and First Aid Certified
MENSA Member
PROJECT LIST
ALLEGRO ADDISON
Addison, Texas
Position: Senior Project Superintendent
Owner: SNK Development
General Contractor: SNK- Texas Construction, Inc.
Architect: Architecture Demarest Cost: $33 million
Scope:
272 unit, four story, A class, high density apartment community configured in two buildings, one 4 level, cast in place parking garage and one 5 level, cast in place parking garage with swimming pool and cabanas located on the 5th level; two ground level retail spaces located in the apartment buildings
Construction:
4 story, wood framing on post tension slabs and podium deck; stucco and manufactured stone facades; four elevators
SUMMERFIELD AT MORGAN STATION
Landover, Maryland
Position: Project Superintendent
Owner: Camden Development
General Contractor: Camden Builders, Inc.
Architect: Lessard Architectural Group Cost: $33 million
Scope:
291 unit, four story, A Class apartment community wrapped around a 4 level pre-cast parking garage; located adjacent to a WMATA Metro station
Construction:
4 story wood framing on post tensioned slabs; brick, EIFS, and Hardiplank facades; three elevators
TOWN CENTER AT CAMP SPRINGS
Camp Springs, Maryland
Position: Project Superintendent
Owner: Metropolitan Development
General Contractor: Global Construction
Architect: Lessard Architectural Group Cost: $35 million
Scope:
397 unit, four story, A- class apartment community wrapped around a 5 level cast-in-place parking garage; site consisted of uncontrolled fill requiring extensive soils remediation including deep dynamic compaction, soils mixing, and liming; site development included site development for a 400 unit townhouse development on adjacent property
Construction:
4 story wood framing on post tension slabs; brick and Hardiplank façades; two elevators
PROJECT LIST
WESTCOTT RESERVE
North Charleston, South Carolina
Position: Project Superintendent
Owner: Westcott Reserve LLC
General Contractor: Global Construction
Architect: Miller/Player and Associates Cost: $16 million
Scope:
192 unit, two story, A- class, garden style apartment community
Construction:
2 story wood framing on post tension slabs, brick and Hardiplank façades
BALA SANDS AT LAKE SHERWOOD
Orlando, Florida
Position: Project Superintendent
Owner: Bala Pines Partners
General Contractor: Global Construction
Architect: Humphries and Partners Cost: $24 million
Scope:
296 unit, two story, A class, “Big House” design apartment community, consisting of 39 buildings, clubhouse, and two swimming pools
Construction:
2 story wood framing on post tension slabs; stucco façade
THE VILLIAGES AT LIONS GATE
Overland Park, Kansas
Position: Project Superintendent
Owner: Coach Reality
General Contractor: Global Construction
Architect: Humphries and Partners Cost: $28 million
Scope:
360 unit, two story, A class, “Big House” design apartment community, consisting of 43 buildings, clubhouse, and swimming pool constructed around an existing lake; included off-site construction of a 3⁄4 mile public street
Construction:
2 story wood framing on post tension slabs; stucco and artificial stone façades
PROJECT LIST
CAMERON CHASE
Morrisville, North Carolina
Position: Project Superintendent
Owner: Archstone
General Contractor: Global Construction
Architect: Niles Bolton Associates Cost: $26 million
Scope:
372 unit, A- class, garden style apartment community, consisting of 2 story and 3/2 split buildings, clubhouse, and swimming pool
Construction:
2 and 3 story wood framing on post tension slabs; vinyl siding façade
CAMERON WOODS
Apex, North Carolina
Position: Project Superintendent
Owner: Archstone
General Contractor: Global Construction
Architect: Niles Bolton Associates Cost: $23 million
Scope:
320 unit, A- class, garden style apartment community, consisting of 2 story and 3/2 split buildings, clubhouse, and swimming pool
Construction:
2 and 3 story wood framing on post tension slabs; vinyl siding façade
CAMERON RIVER RIDGE
Indianapolis, Indiana
Position: Project Superintendent
Owner: Archstone
General Contractor: Global Construction
Scope:
192 unit, A class, garden style apartment community, consisting of two story buildings, clubhouse, and swimming pool
Construction:
2 story wood framing on post tension slabs; brick and Hardiplank façades
PROJECT LIST
WESTON POINT
Overland Park, Kansas
Position: Project Superintendent
Owner: Hanover R. S. Limited
General Contractor: Hanover R. S. Limited
Architect: Wallace and Garcia Cost: $21 million
Scope:
350 unit, A class, garden style apartment community, consisting of 2 story and 3/2 split buildings, clubhouse, swimming pool, and racquet ball court
Construction:
2 and 3 story wood framing on conventional slabs; brick and Hardiplank façades; site work required extensive retaining wall construction and rock removal
Note: Clubhouse awarded 1998 Clubhouse of the Year by Kansas City Apartment Association
THE BLUFFS
Austin, Texas
Position: Site Work Superintendent
Owner: Intercapital Properties
General Contractor: Chancellor Builders
Scope:
360 unit, two story, B+ class, garden style apartment community
Construction:
2 story wood framing on post tension slabs; Hardiplank façade; site work required extensive retaining wall construction and stream stabilization
WHISPER HOLLOW
Austin, Texas
Position: Project Superintendent
Owner: Intercapital Properties
General Contractor: Chancellor Builders
Scope:
Installation of passive methane degassing system in occupied, B+ class, 350 unit apartment community
HIGH POINT
Austin, Texas
Position: Project Superintendent
Owner: Intercapital Properties
General Contractor: Chancellor Builders
Scope:
Rehabilitation of 320 unit, B+ class, occupied apartment community
PROJECT LIST
PINTO RIDGE
Austin, Texas
Position: Project Superintendent
Owner: Intercapital Properties
General Contractor: Chancellor Builders
Scope:
Rehabilitation of 350 unit, A- class, occupied apartment community, requiring
extensive repair of post tension slabs on bell bottom piers