Personal Information
Juan Antonio Roque Nuñez
Address: Mar Azul #3416 Fracc. Parajes del Sur
Telephone: Cell: +52-165*-***-**** Work: 915-***-****
E-mail: faqj5s@r.postjobfree.com
Age: 35 years
Marital Status: Married
Objective
Seeking a challenging position, which will enable me to apply my knowledge and experience on manufacturing and quality process, as well as improve myself inside & outside my working area.
Experience
September 2012 – Present TFM (part of MCS Industries)
Extrusion Manager (Production Manager)
Manage 39 profile extrusion machines, 1 sheet extruder
Supervise 60 operators (set-ups), 12 material handlers, 9 group leaders, 3 supervisors & 1 general supervisor
Manage 3 shifts
Molding with plastic: PS
Support to Engineering to minimize process PPM’s
Keep track of daily requirements with Planning
Supervise corrective actions on customer complaints
Implementation of new process
Trip to China to acquire training in new process (Free Foam)
Supervise production board
Provide feedback to Engineering on new tools
Help in new product development
Run prototype samples and provide information to Product Engineering
Keep track of process metrics (PPM’s, scrap, efficiency & production)
Champion continues improvements team
Manage annual budget
Analyze all RGM’s from customer
May 2010 – September 2012 ZF Electronics
SQE & Supplier PPAP Coordinator
Work on a day to day basis with suppliers to improve.
Work with Sales, Buyers, Engineering and suppliers to improve quality of
the components.
Direct communication with suppliers when quality issues arise.
Audit suppliers Quality System and provide support to continuous
improvement.
Follow up on implementation & effectiveness of corrective actions per supplier issues.
Maintain supplier scorecards (PPMs, SCARs, On time Response, etc).
Team work with Incoming Inspection supervisor to provide back up when required.
Analysis to suppliers capacities.
Coordinate Supplier PPAP’s.
Internal auditor for Quality System.
Quality Engineer
Elaborate Process Control Plan
Support to production to minimize process PPM’s
Give corrective actions on customer complaints
Talk with customers to have feedback
Supervise quality inspectors
Keep track of PPM’s of the line
Champion continues improvements team
Analyze all RGM’s from customer
First analysis on returned parts from customers complaints
Implementation of ISO/TS 16949 System
Implement engineering changes
Launch new programs
August 2009 – February 2010 Instrumentos Stewart Warner (part of Actuant Corporation)
Extrusion Molding Engineer (Mfg & QC Engineer)
Transfer extrusion molding machines and downstream equipment (water
baths, pullers and cutters and vacuum seizers)
Act as Manufacturing & Quality Engineer
Molding with plastic: Nylon & PP
Design poke yokes & fixtures for machines start up
Supervise production quality to customers in extrusion process
Elaborate and implement engineering changes
Prepare PPAP for customer approval
Run prototype’s & PPAP parts
Elaborate tolerance dimensional on PPAP & production parts
Supervise acquirement of spare parts for machines
Support production weekly planning schedule
Support Production Supervisor with quality of extrusion molded liners
Supervise Quality inspectors (QC auditors)
Supervise extrusion technicians
Supervise Launch new programs
Support program managers for new launch & current production
Support program manager with DFMEA
Elaborate process documentation (PFMEA. CP, PF)
Implementation of ISO/TS 16949 System
May 2007 – August 2009 Continental Automotive (formally Siemens VDO)
Extrusion Molding Product Engineer
Supervise production quality to customers in extrusion process
Elaborate and implement engineering changes
Elaborate tolerance dimensional on PPAP & production parts
Audit to Blow Mold & Injection molding suppliers
Support production weekly planning schedule
Support Manufacturing Engineer with quality of extrusion molded hose
Supervise failure analyst technician
Supervise Launch new programs (Ford, Honda & GM)
Support program managers for new launch & current production
Support Quality Engineer in production parts
Support program manager with DFMEA
Implementation of ISO/TS 16949 System
Extrusion Molding Manufacturing Engineer
Supervise production from Extrusion mold machine (Capuzzi)
Extrusion molding with plastic materials: PP, PP+PA & PA612 (Nylon)
Supervise dimensions & quality of extrusion molded hoses (6mm, diam)
Audit to Blow Mold & Injection molding suppliers
Training on Extrusion molding & automated mechanical connections assembly in Czech Republic
Maintain automated machines PLC program
Poke yoke & fixtures design for process continuous improvement
Maintain working conditions of electric pump assembly & test machine (electric, pneumatic & hydraulic)
Elaborate PFMEA
Elaborate Process Flows
Maintain automated machines pressure test
Support to Quality to elaborate Control Plan
Support to production to minimize process PPM’s
Give corrective actions on customer complaints
Supervise 10 production technicians
Supervise machines Preventive Maintenance
Champion continues improvements team
Support Quality on analysis of returned parts from customers complaints
Implementation of ISO/TS 16949 System
Implement engineering changes
Launch new programs (Ford & Honda)
June 2004 – May 2007 Cherry de Mexico
Quality Engineer
Elaborate Process Control Plan
Support to production to minimize process PPM’s
Give corrective actions on customer complaints
Talk with customers to have feedback
Supervise quality inspectors
Keep track of PPM’s of the line
Champion continues improvements team
Analyze all RGM’s from customer
Champion all customer complaints
First analysis on returned parts from customers complaints
Implementation of ISO/TS 16949 System
Implement engineering changes
Launch new programs
Line transfer to China
Manufacturing Engineer
Elaborate PFMEA
Elaborate Process Flow
Line balance
Initiate process deviations
Implement engineering changes
Lay-out changes
Support to production to maintain tack time
Time studies for tack time
Continues improvements ideas
Supervise maintenance technician
February 2001 – June 2004 Key Safety Systems de Mexico, Airbags
Manufacturing Engineer
Elaborate PFMEA
Elaborate Process Flow
Line balance
Implement engineering changes
Lay-out changes
Implementation of ISO/TS 16949 System
Support to production to maintain tack time
Time studies for tack time
Inventory of plant machinery
Implementation of new ideas for Poke-Yoke
Improve current Poke-Yokes by adding automation
Supervise maintenance technician
August 2000 – Feb 2001 Key Safety Systems de Mexico, Airbags
Manufacturing Engineer Intern
Elaborate Work Instructions for line
Elaborate process instructions
Take times for line studies
Support production & Manufacturing Engineers
Inventory of plant machinery
Education
August 1995- Dec 2001 Instituto Tecnologico de Ciudad Juárez
Electro mechanic Engineer
Major in Automation
Company Courses
Cherry de Mexico
Quality System Basics.
Introduction to ISO/TS 16949.
Ergo Most.
Key Safety Systems, Airbags
Implementation of Six Sigma
Introduction to QS-9000, ISO 14001 y ISO/TS 16949.
Implementation of Toyota Production System (TPS).
Outside Courses
Value Stream Maping, Ing. Francisco A. Bribiescas: Lean Master Adviser, December 2006
Lean Manufacturing, Phoenix Training & Consulting, June 2005
KAIZEN, Continues Improvement, Dextro, December 2004
Lean Manufacturing, Villeda Consulting Group, August 2003
Languages
English
100% (Fully bilingual; speaking, reading & writing)
Abilities
Microsoft Office
AutoCAD
Solidworks
PFMEA
PCP
Process Flow
PPAP
Hydraulics
Pneumatic
Electronic
Electric
PLC
Poke yoke & fixture design
Corel Draw
Line balancing
Mapics System
Supervising skills
Team work
Problem solutions
Working under pressure
Excellent interpersonal skills
Process & documentation experience in line transfer
Launch new programs and new designs
SAP System
Minitab