Email: ***********@*****.***
Cell Phone: +92-333-*******
Passport No. DM1852241
Permanent Address:
Near Govt. Girls High School, Kot Abdul Malik, Scheme No.1, PO Same,
Dist. Sheikhupura, Tehsil Ferozwala.
Personal Information:
Father’s Name Munir Ahmed
Date of Birth March 04, 1985
Citizenship No. 35401-3846224-3
Nationality Pakistan
Marital Status Single
Gender Male
Carrier Objective:
Management position where I can effectively utilize my expertise in Production Operations and Project Management for the development of the Organization.
Education:
1- B.Sc. Engineering
Major: Metallurgy and Material Sciences
Institute: Institute of Chemical Engineering & Technology,
University of the Punjab, Lahore, Pakistan.
2- Certificate On: “Solving Human and Organizational Problems”
(SHOP), June 2011
Certified By: AOTS, CKC (Nagoya) JAPAN
AOTS Membership No. 1102052
3- Certificate On: “Cost Reduction Techniques in Light Engineering Sector by Application of Lean Production System”
Certified By: SMEDA:
(Small Medium Enterprise Development Authority)
JICA:
(Japan International Cooperation Agency)
PAAPAM:
(Pakistan Association of Automotive Parts and Accessories Manufacturers)
4- Certificate On: ISO 50001 –“Energy Management System”
5- Certificate On: “Internship Program in Production”
Mughal Steel (PVT) Ltd.
16-KM Sheikhupura Road, Lahore.
5- A Seminar on: “Heat Treatment of Tool Steel”
6- A Seminar on “Production of SG Iron”
Professional Experience:
1- Manager Heat Treatment and Surface Treatment
- Infinity Engineering (Pvt) Ltd.
13-KM Sheikhupura Road, Lahore, Pakistan.
-Manufacturers of Auto Parts and Engineering
Components, Pertaining to Forging, Machining and
Heat Treatment.
-ISO 9001 / ISO 14001 / TS 16949 Certified.
Duration: 12 March 2009 ~ Sep 19, 2011.
Job responsibilities:
Overseeing the production process and drawing up a production schedule.
Monitor and control the production and quality of Heat Treatment and Surface Treatment processes.
Make capacity analysis, giving the achievable targets based on the cycle time study.
Identifying the bottleneck workstation and try to minimize the blocking and starvation at the concerned workstations.
Study the factors of rectification/rejection of heat treated components and propose the remedial steps.
Co-ordinate with Maintenance team for Preventive Maintenance of Machines at Shop.
Ensure that the resources are utilized in a manner to achieve production in a timely and cost effective manner..
Monitor and maintain the record of daily reports relevant to Heat Treatment & Surface Treatment Sections.
Manage production operations for continuous improvement using Kaizen tools like, 5-S, Just-in-Time, Muda, Muri, Cost Management, Inventory Management, Lean Manufacturing, PDCA, etc.
Monitoring product standards and implementing quality-control programs.
Identifying KPIs of operations and setting achievable targets.
Reviewing the performance of subordinates and identifying training needs for the purpose of continuous improvement.
Monitor the process of pre and post weld activities.
Make sure that the workers are performing their jobs according to work instructions.
To ensure safe and best utility of equipment, human resources and other assets under his jurisdictions.
Ensure the compliance of Environmental Management System (EMS) in department.
Monitor the implementation of control measures in department which are defined in Environmental Failure Mode and Effect Analysis (EFMEA).
2- Asst. Manager Forging & Heat Treatment
- Infinity Engineering (Pvt) Ltd.
13-KM Sheikhupura Road, Lahore, Pakistan.
-Manufacturers of Auto Parts and Engineering
Components, Pertaining to Forging, Machining and
Heat Treatment.
-ISO 9001 / ISO 14001 / TS 16949 Certified.
- Duration: 20 Sep 2011 ~ Present
- Job Responsibilities:
Monthly Production Planning and Scheduling.
To monitor and control the production and quality of forging, HT and ST.
Working on the factors of line balancing and inventory reduction.
Make capacity analysis, giving the achievable targets based on the cycle time study.
Identifying the bottleneck workstation and try to minimize the blocking and starvation at the concerned workstations.
Working on the factors of line balancing and inventory reduction.
Manage production operations for continuous improvement using Kaizen tools like, 5-S, Just-in-Time, Muda, Muri, Cost Management, Inventory Management, Lean Manufacturing, PDCA, etc.
Identifying KPIs of operations and setting achievable targets.
Study the factors of rectification/rejection of forged components and propose the remedial steps.
Co-ordinate with Maintenance team for Preventive Maintenance of Machines at Forging Shop.
Preparation of Daily Status Report of all components showing process flow.
Prepare monthly stock report of all the items in his department on last day of each month.
Ensure the compliance of Environmental Management System (EMS) in department.
Monitor the implementation of control measures in department which are defined in Environmental Failure Mode and Effect Analysis (EFMEA).
3- Asst. Management Representative (AMR)
Major: ISO EMS 14001
Duration: March 2012~Present
Job Responsibilities:
Ensure the compliance and effectiveness of whole Environmental Management System (EMS), ISO 14001:2004 in the organization.
Ensure that all departments are performing monitoring and measurement activity of control measures.
Ensure that proper internal communication takes place regarding legal and other environmental, health and safety matters.
Effective implementation and monitoring of Five S (5-S).
Identify the possible environmental aspects in the organization with the coordination of all departmental heads.
Record and update all the environmental aspects in Environmental Failure Mode and Effect Analysis (EFMEA).
Ensure with the coordination of MAHR that emergency telephone numbers of the Fire Brigade, Hospitals, Ambulance Services, Police Station and other concerned institutions are displayed on prominent places.
Conduct regular periodic internal audit of all departments of the organization.
Development Projects:
Design and Prepare the Layout of Heat Treatment & Surface Treatment Sections
Design and Prepare Internall (Electric) Heating Salt Bath Furnace
Key Skills and abilities:
Good communication and inter personal skills.
Ability of English, Urdu and Punjabi speaking.
Working in professional atmosphere.
MS Office and MS Project
Internet surfing
Hobbies and Activities:
Social working
Playing cricket
Current affairs awareness