***** ********* ****** • NEW CANEY, TEXAS *****
MOBILE 281-***-**** • EMAIL ************@*******.***
Jorge Echeverria II
TECHNICAL SKILLS
PDS, Frameworks, Bentley AutoPlant, ProSteel 3D, MicroStation V8, AutoCAD, Mechanical, Electrical, Piping, Structural
EDUCATION
Kingwood Community College Kingwood, TX
Currently pursuing Bachelors in Mechanical Engineering Fall 2002 to Present
I.T.T. Technical Institute Houston, TX
Associate of Applied Science Degree in Computer Aided Drafting May 1997
PROFESSIONAL EXPERIENCE
Shaw Group Furnace Technology Houston, TX
Structural Furnace Designer III November 2008 to August 2009
• Assisted lead designer in 3D Furnace design, model extraction and annotation
• Prepared 2D drawings associated with 3D drawings for job package
• Created macros to simplify several tasks within the furnace group
Projects:
Petrobras
USC “224U” Light Feed Cracking Furnace
Rio de Janeiro Petrochemical Complex
Rio de Janiero, Brazil
Daqing
USC “192U” Cracking Furnace
Daqing Petrochemical Company
Daqing People’s Republic of China
SNC-Lavalin Houston, TX
Structural Designer February 2008 to November 2008
• 3D model design utilizing several 3D software platforms
• Compiled standards for concrete, steel and civil for company wide use
• Retrieved data from onsite field inspections
• Designed tank platforms, stairs, catwalks, pipe racks and bridges
• Created 3D exploration models, extraction models and 2D deliverables
Pate Engineers Houston, TX
Senior Designer November 2006 to February 2008
• Master planning of future subdivisions per client requests
• Calculated preliminary plats to assure their accuracy
• Retrieved tax documents for preliminary plats
• Coordinated with survey department regarding metes and bounds
Van De Wiele Engineering Houston, TX
Senior Designer October 1999 to November 2006
• Distributed workload among drafting personnel
• Calculated storm drainage for utilities, ponds and drainage channels
• Lead role of designing projects from start to submittal set
• Walked plans through at City of Houston during review
• Addressed comments from Harris County Flood Control
• Walked plans through with Fort Bend Country during review
• Pavement designed per City of Houston standards
• Experience with Tropical Storm Allison Recovery Projects
Jones & Carter Houston, TX
Designer III December 1998 to October 1999
• Implemented cad standards for company wide use
• Calculated storm drainage for utilities, ponds and drainage channels
• Walked plans through at City of Houston during review
• Pavement designed per City of Houston standards
Wood Group Houston, TX
Mechanical Designer/Drafter August 1998 to December 1998
• Reverse engineering and design of off-shore vessels, blow out preventers, choke and kill manifolds and gate valves
• Preliminary 3D piping models for offshore platforms
• Quality control and inspection of said parts per OSHA specifications
• Managed shipping and receiving department to maintain up-to-date inventory log
Turner Collie & Braden Houston, TX
Design Technician January 1997 to August 1998
• Responsible for the preliminary one-line design of pavement and utilities for residential land development projects
• Walked plans through at City of Houston during review
• Set up alignments utilizing Geopak for roadway projects