James Cash
PO Box **
Morven, NC *****
Phone: 704-***-****
Cell: 704-***-****
EMPLOYMENT:
**/****- ************** **, *******, Inc. 295 Bendix Road, Suite 400, Virginia Beach, Virginia
Supervisor: Jimmy Berry, Project Superintendent
Location Worked: I-485 Outer Loop ($97 million), Charlotte, North Carolina:
Job consisted of 20 bridges and road work
Job owned by North Carolina Department of Transportation
Primary Responsibilities: Ensure proper implementation of project plan per blueprints by overseeing concrete pouring, decks, footings, layouts, pile driving; grading: oversee asphalt laying : maintaining erosion and traffic control by utilizing labor staff: oversee work conducted by subcontractor. Number supervised varied daily. Maximum Supervised; Eight (8), Minimum daily: Four (4)
Equipment Used: Front end loader, backhoe, bobcat, various cranes, track hoe, bridge bid well machine, hydraulic platform, forklift.
5/2000- 4/2005 Foreman loll, Dane Construction, Inc.
Charlotte, North Carolina
Supervisor: Tommy Lange, Project Superintendent
Location Worked: Mooresville North Carolina and Charlotte North Carolina
Job consist of 12 bridges or more
Primary Responsibilities: Directed activities of workers engaged in construction and repair of railroad structures, such as bridges, Culvers, tunnels, and buildings. Planned work schedules for construction and maintenance projects. Pour concrete, robust, and footing. Formed layoffs, power driving, and supervised six or more men
Equipment Used: Front end loader, backhoe, bobcat, various cranes, track hoe, bridge bid well machine, hydraulic platform, and forklift.
5/1998-6/2000 Foreman, Rea Construction,
Charlotte, North Carolina, (Mecklenburg County)
Locations Worked: Charleston, South Carolina ($70 million)
Owned by South Carolina Department of Transportation
Highway 78 and 52, Mona Corner and Goose Creek
Primary Responsibilities: Poured bridge deck, driving pile, pouring caps and columns, supervised team of five.
Equipment Used: Front and loader, backhoe, bobcat, various cranes, track hoe, Bridge bid well machine, hydraulic platform forklift
4/1995-7/1997 Foreman, Blythe Construction, Inc.
Charlotte, North Carolina
Supervisor, Jimmy Berry, Project Superintendent
Locations Worked: Atlanta, Georgia, Project Owner-Georgia Dept. of Transportation
Interstate 20 and 26 (Completed punch list: completed APP slab: bridge deck, completed concrete gliders
Rockingham, North Carolina (Richmond County)
Various bridge work locations
Completed punch list)
Greensboro, North Carolina (Guilford County)
Interstate 85 Bypass (18 Bridges, roadwork, and box cover)
Supervisor four (4) bridges
3/1991-5/1994 Foreman, Lee Construction, Inc.
Charlotte, North Carolina
Supervisor: Jimmy Berry, Project Superintendent
Location Worked: Rockingham, North Carolina (Richmond County)
Project Owner: North Carolina Department of Transportation
401 Louisburg Road ($50 million) (Four span bridge over Meuse River, grade work)
Primary Responsibilities: Pouring caps, columns, bridge deck, end bent and placing
Rear laying concrete, Maximum supervised: Six (6); Minimum supervised: Three (3).
Equipment Used: Front end loader, backhoe, bobcat, various cranes, track hoe, Bridge bid well machine, hydraulic platform, forklift.
Primary Responsibilities: Oversee punch list completion at assigned work site: pour concert columns caps, footing, and end bent. Placing rear, setting structured steel.
Equipment Used: Front end loader, backhoe, bobcat, various cranes, track hoe, Bridge bid well machine, hydraulic platform, forklift.