Mohammad Wajid Ali
“Dawood-Lodge”
B-***-Canal Avenue
Rahim yar khan-64200
Pakistan
Phone:
Res. Pak: +92-68-588****
Mob, Kuwait: +965-********
Email: *********@*****.***
***********@*****.***
More than 23 Years Hands-on Experience in industrial construction Field, out of which 12 Years in Gulf.
6 Years in Oil & Gas Plants
5 Years in Fertilizer Plants
6 Years in Cement Plants
4 Years in Power Plants
2 Years in Petrochemical Plants
EDUCATION
Feb1983-Mar1988 Mehran University of Engineering & Technology Jamshoro, Pakistan
Bachelor Degree in Electrical Engineering
MEMBERSHIP
1988 Pakistan Engineering Council Islamabad, Pakistan
SKILL
Site Management, Construction of Industrial Plants, EPC Construction in Oil & Gas Sector
Equipment Installation for Onshore Projects, Design Review, Materials Procurement, Punch lists, Document control, Final Inspections. Pre-Commissioning & Startup, Projects Implementation, Occupational Health/ Safety Compliance, Permit Systems, Risk assessment, Method statements, Corrective actions, Technical Queries, Material Take Off, Conformity reports, Team Building, Motivational Skills, Communication & Interpersonal Skills, Analytical & Problem Solving Skills, International Standards and Procedures.
IT, SKILL
• Windows & Office Tools
• MS Word, Excel
• Power point
• Primavera Project Planner (P3)
WORK EXPERIENCE
Construction Manager E&I
July- 2010 to Date Descon Engineering FZE Kuwait
Project:
Kuwait Cement Company Limited Shuaiba Port Kuwait
5500 TPD Line II
Responsible for:
• To ensure implementation of work schedule as per Level III and Level IV plan
• Effective utilization of all resources (including manpower, equipments, plants, material etc) as per available work front.
• Ensure execution of construction as per approved Method statements.
• Measure the performance of assigned tasks related to project execution ensures their timely completion, and address execution issues.
• Update Project Manager about site progress by generating regular reports and highlight all bottlenecks, anticipated problems along with necessary remedial notions.
• Tracking of Subcontractor Manpower on Daily basis
• Liaison With QA/QC and HSE to ensure the Compliance as per Requirements
Lead Electrical Engineer
May2009-May-2010 Santos Engineering Services Limited Dublin 2 ~ Ireland
Project:
HIMA Cement Limited Hima Town UGANDA
2000 TPD New Kiln Line
Reporting to Project Manager (LAFARGE)
Responsible for:
• Inspecting the EPC contractor’s site work to assure the compliance with project’s HSE and Quality Plans and approved construction drawings
• Performing in the inspection of materials and equipment by assuring they are within tolerances, grade and quality specified, properly stored and handled.
• Checking and verifying all the related inspection requests.
• Reporting all the contractor’s non compliances and prepare required NCR’s.
• Material tracking and follow-up local procurement.
• Frequent contacts with Contractor personnel and Operation team.
• Handling Drawings, Documents Updating
Construction Manager E&I
April 2008 to April 2009 Descon Engineering Limited Lahore Pakistan
Project:
Engro Chemical Fertilizer Limited Daharki Pakistan
3500 Ton per day
(World 2nd Largest Urea Production Plant)
Responsible for:
• To ensure implementation of work schedule as per Level III and Level IV plan
• Effective utilization of all resources (including manpower, equipments, plants, material etc) as per available work front.
• Ensure execution of construction as per approved Method statements.
• Measure the performance of assigned tasks related to project execution ensures their timely completion, and address execution issues.
• Update Project Manager about site progress by generating regular reports and highlight all bottlenecks, anticipated problems along with necessary remedial notions.
• Tracking of Subcontractor Manpower on Daily basis
• Liaison With QA/QC and HSE to ensure the Compliance as per Requirements
Lead Electrical Supervisor
May2007-March 2008 Snamprogetti S.p.A Milan Italy
A Company of Saipam
One of the World Reputed EPC Company Deals in Oil & Gas, Fertilizers, Power Plants, Chemical & Petrochemical Projects.
Project:
Ruwais 3rd NGL Train Ruwais Abu Dhabi
Gas Processing Plant
Reporting to Electrical Superintendent Responsible for:
• Site Inspections as per drawing, specification and standards
• Reviewing change orders
• Subcontractor Daily Progress Monitoring, and Reports
• Tracking of Subcontractor Manpower on Daily basis
• Material tracking and follow-up local procurement.
• As Built Marking on Drawings
• Handling Drawings, Documents Updating
Senior Project Engineer
Apr2006-May2007 Hadi Haider Alyami company Rahima, Saudi Arabia
Project:
SSPP Switchyards and SS9I Substation. Yanbu, Saudi Arabia
(380KV-115KV Switchyards, 115KV/34.5KV/13.8KV Substation)
Responsible for;
• Assisting Project Manager in all Matters and working as Acting Project Manager during his Absence.
• Evaluation and review of Design drawings, Technical submittals and shop drawings prior to submission to Client according to project standards and specifications
• Preparation of Method statement / work instructions as per specification and project requirement.
• Preparation of scope of work for assigned Substation ( SS9I)
• Coordination and follow up with procurement department, including Technical data reviews, through to receipt of materials and equipment at site.
• Monitoring and assigning work to site Engineers as per site requirements.
• Daily review meeting with client, senior management, and site Engineers to discuss planned vs. actual progress achieved and resolve the site issues.
Project Engineer
Mar2003-Mar2006 Varow International (Pakistan) Lahore Pakistan
One of the Reputed Company Deals in Industrial Construction in Pakistan
Having a Track Record of Projects in Oil&Gas, Power Plants, Cement and Fertilizer Plants.
Project: 2
Sialkot International Airport Sialkot (Pakistan) Sialkot, Pakistan
(First Private International Airport in Asia)
Responsible for,
• Preparation of EPC Contract Work schedule for Electrical Works.
• Preparation of Method statements for Construction work.
• Review and Monitoring of shop drawings preparation at site.
• Supervision and Monitoring of Construction activities
• Budget and cost control.
• Attending meetings with different Authorities.
Project: l
Sawan Gas Field Development Project Khairpur Mir’s, Pakistan
Responsible for,
• Review and evaluation of shop drawings, technical submittals prior to submission to client.
• Monitoring and Follow up procurement schedule
• Monitoring and assigning work to site Engineers.
• Supervision and Monitoring of construction activities
• Close Monitoring and Implementation of safety standard and policies
• Coordination with other Disciplines for interfaces in Construction activities.
Senior Engineer Electrical
Sep 2001-Dec2002 Tamimi Company Construction Div, Dammam Saudi Arabia
Project:
Expansion of Sulfur handling export facility Jubail, Saudi Arabia
Responsible for,
• Entire Electrical works such as,
• Installation of 13.8KV Switchgear, 20MVA Transformers, Cable lying and termination.
• Installation of Cable trays and GI Conduits for cable routing.
• Installation of Plant lighting and grounding system.
• All Electrical Modification works at Existing pelletizers,A,B,C&D
• Meetings with Saudi Aramco Team to solve the construction issues.
• “As Built” Drawings marking
Senior Engineer
May1992-Aug2001 Descon Engineering Limited Lahore Pakistan
Project: 6
Borouge Petrochemical Limited Ruwais, Abu Dhabi
Responsible for,
• Preparation of Method Statements for site execution.
• Review and evaluate technical submittals and shop drawings prior to submission to consultant/client according to project requirements.
• Assign and Monitoring work to Site Engineers in accordance with company procedures.
• Daily Meeting with Client and Company Management to solve the Construction issues.
• Co-ordination with Planning and Procurement Department.
• Fully Guidance to Area Engineers by using strategic policies and different tools& Methods to Improve Progress Efficiency.
Project: 5
Asab Gas Development Project Asab, Abu Dhabi
Responsible for,
• Review and evaluate technical submittals/shop drawings prior to submission to client according to project requirements.
• Preparation of method statements for site works.
• Responsible for act as liaison with other disciplines and client managing work interfaces
• Handling procurement according to scope of work.
• Assign and monitoring site works to site engineers
• Implementation and monitoring of safety standards
Project: 4
Fauji Jordan Fertilizer Bin Qasim Karachi, Pakistan
Responsible for,
• Installation of 13.8 KV /415V -80MVA Transformers.
• Installation of 13.8KV Switchgears.
• Installation of DC Power system
• Installation of LV Switchboards, MCCS
• Plant and Building Lighting/Grounding system
• Cable trays, Cable Laying and Terminations.
Project: 3
4000 TPD Lucky Cement Plant Lakky Marwat, Pakistan
Responsible for,
• 132KV/11KV-150MVA Transformers and their relevant switchgears at gird station
• DC Power (battery banks, ups, inverters) for gird control system.
• Cable Laying /Testing and Termination.
• Installation of LV Switchboards, MCC’S and Distribution Boards.
• Cable trays and G.I Conduits for Cable Routing.
• Plant Lighting and Grounding system.
Project: 2
3000 TPD Wah Cement Company Limited. AC Wah Pakistan.
Responsible for,
• Installation of 6.3KV/400V-500,300KVA Transformers and their relevant Switchgears.
• Installation of Variable Voltage and Variable Frequency drives.
• Installation of DC Drive Panels for Kiln system.
• LV Switchboards and Distribution Boards for Different Utilities.
• Cable trays and Conduits for Cable Routing.
• Plant Lighting and Grounding system.
Project: 1
Engro Chemical Pakistan Limited Daharki, Pakistan
Responsible for,
• Installation of 2.4KV Metal Clad Switchgear.
• Installation of Motor Control Centers and Distribution Boards.
• Cable Laying and Terminations
• Plant Lighting and Grounding system
Field Engineer
Jun1988-Apr1992 Aloft Engineering Services Lahore Pakistan
One of the Medium Range Company Deals in Industrial Construction
Especially Electrical and Automation.
Project: 2
Ayub Medical Complex Abbot Abad, Pakistan
Responsible for,
• Installation of 11KV/440V-200KVA Transformer
• LV Switchboards and Lighting Distribution Boards.
• Installation of Fire Alarm System
• Cable Lying and Terminations.
Project: 1
KESC Power Complex Bin Qasim Karachi, Pakistan
Responsible for
• Installation of Fire Alarm System
• Installation of CCTV and Paging System
• Cable Lying and Terminations.
QUALIFICATION
2006 Arabic Language Course Islamic Centre Yanbu, Saudi Arabia
2000 Course on effective team building Lahore University of Management Sciences
Lahore Pakistan
2000 Introduction to Distributed Control System Descon Engineering Limited
Lahore Pakistan
2000 Primavera Project Planner, DPMS & FHUPDATE Descon Engineering Limited
Lahore Pakistan
1997 Awareness on ISO-9000 Descon Engineering Limited
Lahore Pakistan
1995 Introductory Course on Programmable
Logic Controllers for Cement Industry Siemens Pakistan Engineering
Company Limited Karachi
LANGUAGES
• Sindhi Mother tongue
• Urdu National language
• English Fluent
• Arabic Work only
SUMMARY
• Profile: Male,48, Married
• Date of Birth: Feb-01-1964
• Nationality: Pakistani
• Current position: Manager E&I
• Current location: Kuwait
Company: Descon Engineering FZE
• Preferred Locations: Gulf, Asia, Africa
• Salary Expectations: Negotiable