CURRICULUMVITAE
PERSONAL DATA
NAME: NWORIE SUNDAY
DATE OF BIRTH 12TH DECEMBER 1980
PLACE OF BIRTH UJE IGAMUEL ADO L.G.A. BENUE STATE
SEX: MALE
NATIONALITY: NIGERIAN
STATE OF ORIGIN: EBONYI STATE
L.G.A: EZZA NORTH L.G.A
MARITAL STATUS: SINGLE
CONTACT ADDRESS: CHURCH OF GOD MISSION WOJI TOWN, PORT HARCOURT
Passport Number: A01331049
E-MAIL: *********@*****.***
PERMANENT ADDRESS: OMEGE-UMUEZEKOHA, EZZA NORTH, EBONYI C/O MR PAUL NWORIE
PHONE: +234**********
QUALIFICATION OBTAINED WITH DATES
INSTITUTION ATTENDED DATES QUALIFICATION OBTAINED
EBONYI STATE UNIVERSITY, ABAKALIKI 1999 – 2003 B.Sc (INDUSTRIAL PHYSICS/ ELECTRONICS) (SECOND CLASS HONOURS 2.2)
METHODIST HIGH SCHOOL IGUMELA ADO LOCAL GOVERNMENT AREA BENUE STATE. 1992 – 1998 WAEC / SSCE
ST. PAUL PRIMARY SCHOOL
UJEIGUMELA BENUE STATE 1984 – 1990
FIRST SCHOOL LEAVING CERTIFICATE
ENGINEERING EXPERIENCE &CERTIFICATE ACQUIRED & SKILLS - 1,Practical skills, familiar with construction practice: laying, pulling and connecting cables (using cables glands, terminals blocks, cable lugs, bus bar, sealing compound… understand working principle of HVAC LV HV equipment with different technology compressor, split units… troubleshoot and Repairs Of Electric Installations / use of drawings (single line and schematic diagrams), vendor documents, name of plate and it drawing in times of Maintenance and Installation . knowledge of electrical symbols. general facilities electrical network philosophy: main generation, emergency generator, switchboard and UPS. And a basic understanding of inter-tripping and interlocking action, load shedding and load sharing modes, understanding of Equipment Terminology and various process equipment, eg Process Flow diagrams (PIDS) Process and Instrument diagrams (P&IDs) Loop diagrams, Sama diagrams FCV Experiences & Current H2S certificate
Excellent knowledge of all International Codes and Standards in PLC, DCS,ESD,F&G systems, HIPPS,SCADA/RTU field like IEC, ISO, SOLAS,API,ANSI/ISA,ASME,NFPA,BS, ITU-T, SAP/R3 experience and know-how etc. and genera knowledge of Other disciplines, and gas treatment installations
2, Able to test and verify alarms, trip and interlock settings and perform insulation and continuity tests, LV Electrical equipments: in time of dismantle, replace defective parts, reassemble, reconnect and check the system. Identify all accessories. Able to test and work on field station modules / fluid distribution Headers Instruments
3, Safety at work, good Knowledge of electrical habilitation requirements with certified as it required in the Field knowledgeable on PPE requirement and MSDS interpretation of area classification, marking for hazardous area ATEX rules and Ex explosion proof materials, expected to work safely and independently on non-critical equipments preventive maintenance and basics procedure, knowledgeable of hydrocarbons behaviour and associated risks (explosion, asphyxia)
4, Experience in pneumatic, hydraulic, electronic, instrumentation and control, Experience in pre-commissioning, commissioning, and start-up. Familiar test function of control valve (electronic/pneumatic), on-off valves (hydraulic such as BDV valve, ESDV valve, PSDV valve), anti surge valve, MOV valves, and deluge valves (fire hydrant). Ensure that electrical/instrument installation conforms with the codes and standard compiles the rules and regulations and government authority and good experience in Yokogawa, Foxboro, Bailey, Triconex, HIMA, HIPPS Instrument
5, Involved in preparation of project execution schedule, planning package, and make progress daily report and monthly report
Involved and weekly meeting, issue comment for project progress, HSE regulation
6,Project Location ODP 1 AND FSO UNITY& AKPO Project,Agbami Field Mobil Deep water Offshore OML58 Upgrade phase 1, client Ponticll to Total E&P / TOTAL Offshore in Angola /Congo BP Offshore
7, Acquired Certificate, Helicopter Underwater Escape Technique (HUET&SAS), use of CMMS software and SAP/R3,AutoCAD Computer Literate &Microsoft Excel, Word QC & QA Project management appreciation and evaluation on Works scope and Final control Elements Training systems(TPC Training Systems),
CAREER OBJECTIVES
To work in a competitive, well-structured and result-oriented organization, andcontribute substantially towards the realization of its set objectives and goals
PROJECT RESEARCH/IT WORKS
1. Analysis on hydro power and solar energy system and its uses.
2. Designing and construction new model am and fm digital micro wave transmission.
WORK EXPERIENCE
May . 2012 - till date
SAIPEM CONTRAITING NIG-LTD
POSITION E&I INTERVENTION EGR
Department MMO
Current Project –GMC on Wowrri Refinery
Project LOCATION-AKPO& USAN FPSO
TOTAL E&P LTD
job responsibilities
Preventive maintenance on E&I equipment at gas processing unit at Wowrri Refinery Intervention maintenance of fire damper control swatch with the function test in P&S Module in Akpo FPSO/USAN and SDV –PSV ROV valve Panel and Rental maintenance of PDIT LIT ESDV in process units. Preventive maintenance / function test on the metering Bus bar and ABB control panel on crude recirculation pump and maintenance of HVAC Compressor control panel in HVAC Plant Room, and Air compressor motor in the crude Recirculation pump in the P&S Module and Rental maintenance in Rolls Royce gas Turbines / calibration PT in Turbines maintenance of fire water pump system at AKPO FPSO
EPIC ATLANTIC LIMITED
PLOT 212 TRANS AMANDI PORT HARCOURT
(SOWOSCO YARD)
POSITION: INSTRUMENTATION SUPERVISOR
Project LOCATION, AS-BUILT CAWTHORN CHNEL
GAS PLAT SPDC
NLNG BONNY
SPDC UPGRADE BONNY
NAG SPDC
job responsibilities
Supervisor of the mark-up of all the instrument designer eg PID /LOOP and LOGIC diagram at the gas plant and Rental maintenance of E&I equipment in gas plat at NLNG backup gas supply project in Bonny and Bonny NLNG extension project hookup and Bonny NAG Upgrade and Caw thorn Chanel project SPDC AS-Built project
CARMEL TEKNO LIMITED
18 CHIEF EJIMS STREET RUMUOMASI, PORT HARCOURT, RIVERS STAT.
POSITION: SNR, INSTRUMENTATION ENGINEER
POSITION: SNR, INSTRUMENTATION ENGINEER
Project LOCATION ; CONGO BP OFFHORE: ODP 1 AND FSO UNITY&AKPO PROJECT
My -Current-CLIENT:BP, CONGO
1Project description,FSO unity Nigeria -Sir Instrumentation maintenance Service Coordinator
department:Hook-up /maintenance Service
07/2007-02/2008
2,Project-description:AKPO-Nigeria-Instrumentation Commissioning Engineer
department: Commissioning
06/2008-01/2009
3, Project description: TOTAL Offshore in Angola / Congo BP Offshore- Lead, Instrumentation Commissioning Engineer
Department :Commissioning
4, Project-description Shutdown work at Obagi gas plant
TOTAL E&P Nigeria Ltd,
T U –D Concept
POSITION: INSTRUMENTATION SUPERVISER
job responsibilities
Supervision of Replacement oforifice plate and FT and the calibration with the Inspection of the orifice plate and Coordinator the field service work at Obag Sundown and Coordinator the work permit.
Supervision of Replacement ofHIPPS panel / commissioning of HIPPS and inspection of ABB flow meter, Installation of field station modules / fluid distribution Headers and total Rental maintenance of E&I equipment in FPSO/, client BP Offshore in Congo (SAP/R3 experience)
Installation of control valve &P.S.V/SDV replacement of pressure control systems in Turbine in ODP 1 installation of Rosemount vortex flow meter& pressure gauges,pressure testing of cylinders & day to day inspection on operation control systems in the Turbine compressor / maintenance of subsea connectors & power bank control system solution, remote control systems . Rental maintenance of hydraulic equipment control subsea systems,In TOTAL Offshore in Angola / Congo BP Offshore.
Advise engineering team on calibration provisions for all new projects. Assist in Terminal/Plant Operations teams in resolution of stock variance issues
Manage day to day activities associated with calibration including client liaison in calibrators’ equipment certification, etc
Overseeing of Installation of Gas Level Transmitter in Turbines and commissioning of power distribution hook-up line & preparation work monitoring preservation, documentation of E&I report & completion and pre-commissioning activities, commissioning temporaries, etc
Ensuring necessary HSE reviews are undertaken and identified actions completed.
Conducting design reviews for commissioning and start-up require
Ensure all calibration works are carried out in line with & Undertake hands-on calibration and certification activities for gas and liquid measurement systems for the client facilities And validation of certification of these measurement systems,Swagelok fittings of instrument / PFA fittings, Tube at FPSO Mode
Involve in any activities commissioning to make sure the testing according to the logic Control design such as Gas turbine control panel (Speedtronic Mark VI ) for Compressor AN 250 and MCL 1002 Compressor manufactured by NUOVO PIGNONE, Steam Turbine Control, and CO2 Skid.
Advising on the acceptance of the formal Handover from contractors at Pre-commissioning completion stage.
Preparing all commissioning planning and estimate documents in cooperation with Commissioning Group.
Ensuring all necessary work Permits, and other Compliance requirements are in place prior to commencement of any commissioning activities.
Overseeing contractor’s commissioning and support to start-up scope of FCV & LIT TT
Ensuring acceptable Formal Handovers to Operator are prepared .And Installation of PTFE hose, Swagelok tube fitting, Swagelok tube adapters NPT fittings, gasket,on flanges, lap joint flanges,l-line fittings
Participating in and assisting with the co-ordination of HV AC the Project’s performance test(s). Installation of Gas Level Transmitter in Turbines ODP1 OML 100 offshore/ calibrating control valve and LT, in the Turbines compressor certified Turbine Meters /Carioles Meters, Conventional Pipe Proves, and Small Volume Proves
Contributing to the Commissioning Group’s improvement process and close-out report in
Level indicating controller valves Installation
And Installation of PSI Transmitter at TOTALFSO Unity
Read work orders, instructions, formulas, procedures and calibration charts
Assemble and install pipe sections and fittings required for calibration and Understand technical operating in equipment, flow media, pressure or temperature equipment and other measuring devices in the Plant
To maintain a comprehensive knowledge of up-to-date industry standards to the client
GOMANS ENERGY SERVICES
34 IKWERRE ROAD PORT HARCOURT
2007-2008
POSITION: SNR, SERVICE ENGINEER
Project LOCATION AGBAMI FIELD
CLIENT: Chevron Nigeria
1-Project description, Agbami FPSO Nigeria -Sir Instrumentation maintenance Service Coordinator
department:Hook-up /maintenance Service
01/2006-02/200
job responsibilities
Supervisions ofRental maintenance of Instruments in plant and supervision of installation of water injecting pump and routine maintenance of 4-way valve and ball valves chokes at FPSO and services of Electric power panel unit control systems in Turbines, Pre-commissioning of power station hook-up Turbines Coordinate and manage electrical and control systems, grids, Transformers and generators. S and injectors in gas flow-line in turbine. Installation of power distribution digital control panel in transmission Room, installation of new PLC digital instrument control systems e.g. remote and close control facility of the main circuit breakers of the HV/LV networks from a control point/which control distribution systems in the electrical technical room in the FSO unit. Witness/check during phase construction, installation, and perform pre-commissioning, commissioning conform to P&ID detail include codes and standard.Provision of at the VDU base to provide animated display of powergeneration and interface with integrated Putting down alltechnical and Electricalreport and calibrating control valve and LT/ water injecting pump that is installed in existing well,
VINP-GRUP
PLOT 123 TRANS AMADI IND. LAYOUT PORT HARCOURT
2004-2007
POSITION: SNR, ELECTRICAL INSTRUMENTATION
ENGINEER (E&I)
Department:Hook-up /maintenance Service
CLIENT:MOBIL Nigeria
job responsibilities
Pre-commissioning of Turbines HV multi meter digital switch charger in transmission room, and installation of LV &HV voltage distribution panels & control system board. And reviewed the approved by the GIS manufacturer before installation to ensure successful operation in the network turbine facilitate of automatic regulator system.
Supervision of all electrical and instrumentation motor regulating system that is installed in turbine network transmission station to control the power that flows in the breakers
Analyzing PID & PFD, LOOP, and flow line diagram during the time of installation, installing switch board automatic change-over system, repairing battery charger and power inverter of a DC UPS & AC UPS system. And Swagelok pressure Transducers
FEDERAL GOVERNMENT COLLEGE, ABUJA 2003 – 2004 NYSC
job responsibilities
Class/Teacher physic mathematics. SSS1-SSS3
NATIONAL ELECTRIC POWER AUTHORITY (NEPA) ABAKALIKI DISTRICT.
ELECTRIFICATION PROJECT
(I.T) INDUSTRIAL TRAINING - 2002
POSITION: ELECTRICAL TRAINEE ENGINEER
job responsibilitiesInstallation of 120KVA/500kvA mw substation Transformer and laying HV/LV distribution line armored cables from the high tension to the transformer and synchronizing the frequency of the transformer to have a successful state at the maximum ambient temperature
Pre commissioning of new one that is install and the reviewed GIS, IOS and EIO approver Installation ofthe capacitors and circuit breakers with cable log in the input and output voltage in switchboard at transformer to ensure successful protection in the control panel unit.
HOBBIES:
SWIMMING, FOOTBALL AND READING NOVEL
REFEREES:
HON. INNOCENT UGOCHIMA
NATIONAL ASSEMBLY ABUJA
PHONE: +234**********
MR MOSES ADI
S.P.D.C PORT HARCOURT
PHONE: +234*********
SECURITY AND COMMUNITY RELATIONS DEPT
MR. PETER AZORJI
TOTAL E&P NIGERIA LED
PHONE: +234**********
MATERIAL MANAGER