| | |
|CHELVADURAI "BAS" |****, Huntington Drive, |
|BASKARAN |Belvedere, IL 61008 |
| |(815) 975 - 9065 |
| |920-***-**** (Cell) |
| |edj0cm@r.postjobfree.com |
| | |
|Summary of Experience |
| | |
|Customer focused manufacturing, professional who provides the strategic |
|vision and leader ship to drive quality and continuous improvements. Over |
|18 years of experience in high & low volume, precision industries |
|including automotive. Directed and Managed multiple plants locations. |
|Extensive background in good manufacturing practices, productivity |
|optimization, Total Productive management, Total Quality Management (TQM),|
|Global supplier development, employee involvement, New product |
|development, Gage R& R, PPAP, FMEA, 5S, SPC, ISO9000, ISO 14001,TS |
|certification,8D, Kaizen, six sigma, lean Manufacturing and |
|organizational leadership. The experience has led to a thorough knowledge |
|of both the preventive disciplines and detection process that are |
|prevalent in successful quality programs |
| |
|Present Bergstrom Inc. Manufacture, and supply of heating, |
|ventilating, and air conditioning units for |
|the commercial vehicle industry. The company serves heavy duty truck, |
|off-highway |
|machine, bus and specialty vehicle, mining, industrial and defense, and |
|electrified and no-idle |
|system markets in North America, Asia and Europe. |
| |
|Manufacturing Engineering, Maintenance and Continuous Improvement Manager:|
| |
|Oversee global manufacturing engineering and Facility Maintenance |
|functions and |
|personnel. Reporting to the VP Manufacturing, this position has 16 direct|
|reports. |
|Responsible for maintaining the efficiency and effectiveness of all |
|production related |
|manufacturing equipment & processes required to manufacture a high quality|
|product |
|in a repeatable and cost effective manner. |
|Responsible for implementing and maintaining World Class, Lean, TPM, |
|Quality |
|processes, continuous improvements and other advanced manufacturing |
|methodologies |
|and systems. Ensures production equipment is capable and has capacity for|
|growth; |
|involves integrating equipment, people, material flow systems, and |
|information |
|systems. |
|Drive continuous improvement in labor costs through waste reduction, |
|production |
|efficiency, and operations improvement. |
|Providing facilities engineering leadership, manage maintenance staff and |
|ensure |
|compliance with all policies and procedures. |
|. Develops safety programs and ensures facility |
|compliance with OSHA requirements |
|2009 to |
|2011 Rocknel Int, Rockford. IL - A Japanese Automotive Company |
| |
|Specializes in cold forming a variety of fasteners for the assembly of |
|automobile |
| |
|frames, engines, suspension systems and sub-assembled components. |
| |
|Quality Manager: |
|Responsible for the overall management of the quality department. |
|Responsible for implementation and maintenance of the quality system |
|including document control, identification and traceability, inspection, |
|calibration, control of non-conforming product, corrective and preventive |
|action and quality records. Investigate and product quality customer |
|problems and supplier issues. Coordinate all the activities from our |
|sister company in Japan for the smooth pass through products to all the |
|Honda locations in US, Mexico and Canada |
| | |
|2006 to |Greenlee Textron, Rockford. IL |
|2008 |A division of Textron Corporation, specializing in the design, |
| |manufacturing, testing and marketing of professional Tools and |
| |electronics for Electrical, Data Communications, |
| |Utility Construction & Installation Applications |
| |Director of Quality: |
| |Directed and Managed multiple plants location of Quality |
| |management system |
| |Provided leadership, implemented quality tools, and created |
| |metrics to support |
| |company Lean concept. |
| | |
| |Responsible for implementing of the division and plant site |
| |quality management system (QMS) to assure ISO certification. |
| |Created and maintained plant site quality documentation to |
| |ensure process and documentation reflect current practices. |
| | |
| |Developed and maintained metrics. Involved in day to day floor |
| |activities, generated reports, participated in daily production|
| |meetings, monthly / quarterly reviews and emergency employee |
| |meetings to assure problems were addressed and corrective |
| |measures put into place, alleviating down time as well as |
| |excessive scrap. |
| | |
| | |
| |Developed effective supplier management process to assure |
| |purchased part quality and minimized the need for inspection |
|2002 |Mercury Marine, Fond du Lac, Wisconsin |
|to |A $1.8 billion division of Brunswick Corporation, specializing |
|2006 |in the design, production and marketing of marine engines, |
| |propulsion drives, and accessories worldwide. |
| | |
| |Manufacturing Engineer / Quality Manager: |
| |(Casting, machining, injection molding, assembly and testing) |
| |Responsible to Corporate Vice President for product |
| |development; tooling, process, system, layout design; |
| |plant-wide continuous improvement, Quality assurance and safety|
| |support of 800 employees, 3-shift operation. Supervised 12 |
| |salaried direct reports, and 14 hourly quality inspectors. |
| | |
| |Led Design of Experiment (DOE) to improve processes. Created |
| |and implemented communication feedback system, established |
| |process audits and standard operating procedures with visual |
| |aids for operators, initiated Change Point Control (CPC), and |
| |updated control plans and Failure Mode and Effective Analysis |
| |(FMEA) reports. |
| | |
|2001 to |Chicago Fine Blanking, Vernon Hills, Illinois |
|2002 |A $110 million automotive stamping division of Precision |
| |Resource Corporation. |
| |(Stamping, Machining, injection molding and Assembly) |
| |Senior Quality Manager: Responsible to Plant Manager for |
| |facility and supplier quality assurance, continuous |
| |improvement, and new product launches. |
| | |
|1985 to |Ganton Technologies, Inc. / Intermet, Sturtevant, Wisconsin |
|2001 |A $140 million aluminum casting parts division for automotive |
| |and specialized industries. |
| | |
| |Manufacturing System Engineer, Industrial Engineer and Tooling |
| |Manager: Responsible to VP-Manufacturing for Quality Assurance,|
| |Kaizen-Continuous Improvement, Preventative Maintenance, and |
| |supplier development. Directed 18 hourly and 3 salaried |
| |personnel. |
| | |
| |Aligned with major customers (GM/Chrysler/Ford) and produced 25|
| |standardized |
| |operational manuals for parts assembly. Results: Achieved PPAP|
| |on time and |
| |launched over 20 new products per year with Total Production |
| |Management (TPM). |
| | |
| | |
|Education | B.E. Degree. University of Sri Lanka, Jaffna. |
|and | |
|Training: |Leadership and Motivation, University of Wisconsin-Parkside, |
| |Kenosha, Wisconsin. |
| |Kaizen- Continuous Improvement - Kaizen Institute. TPM - |
| |Productivity Inc |
| |Ford / GM APQP process - Ford and GM. Supplier Development - |
| |Chrysler |
| |Workplace Communication/Organizational Behavior, UW-Oshkosh (in|
| |process) |
| |Lean Six Sigma Process - Textron University. Green belt |
| |Certification |
| |Toyota Production, Inclusive Work Force - Management |
| |Communication |
| |Honda - 5P Process and continuous improvement strategy, |
| |environment management, ISO 14001 certification, Facility |
| |management, TWI |
Proficiencies: Microsoft Office (Excel, Word, PowerPoint), SAP, Infinity
System and Power way, Oracle