KEY QUALIFICATIONS:
Nadia Shifrin is a Plumbing Project Engineer/Piping Designer experienced in new and remodel designs for water supply, domestic and chemical waste water removal systems, water heating, storm, laboratory gas, medical gas systems for governmental, commercial, residential, industrial, institutional projects, schools and hospitals. Her responsibilities encompass code reviews, water/waste systems calculations, piping sizing and layouts, equipment selections, specifications using Master Spec, and construction administration. She is experienced using AutoCAD 2008 including creating 3D drawings, Microstation, MS Office 2000 and 2007, and BIM Revit 2007 thru 2010 for Architecture, has knowledge of Revit 2010 for MEP, load calculations using Trace 700. She is creative with effective interpersonal skills and organizational abilities, has ability to handle multiple projects from planning through execution. She has strong coordinating, planning and problem solving abilities and is able to work under pressure in time-sensitive, fast-paced environments.
EDUCATION AND TRAINING:
MS, BS in Environmental Engineering, University of Architecture and Construction, St. Petersburg, Russia
3D AutoCAD 2008 with Autoshade, Community College, Florissant Valley, MO
BIM Revit for Architecture 2009, 2010 St. Louis Community College, Meramec, MO
LEED Exam Review Class, St. Louis Community College, Florissant Valley, MO
EMPLOYMENT EXPERIENCE:
CHARLES E. JARRELL MECHANICAL CONTRACTORS Plumbing Project Engineer (contract position)
4208 Rider Trial North
Earth City, MO 63045 December 2009 – April 2010
Performed complete design and sketches for drafting personnel of all plumbing systems for LEED certified (silver) FLETC 400 rooms military dormitory in Charleston, SC, 3 floor undergraduate student dormitories for SLU and BJH Ambulatory Care Clinic. Performed calculations for booster pumps and water piping sizing, fixture take-offs etc. Designed mechanical room layouts & hot water heaters system diagrams, water and sanitary isometrics; checked CAD drawings.
CASCO CORPORATION Plumbing Project Engineer
10877 Watson Road
St. Louis, MO 63127 September 2007 – October 2008
Responsibilities included 3 old prototypes updates and 3 new prototypes development for PetSmart, including specifications, selecting equipment, designing loop water heating systems etc. She designed, using Revit 2007 for A and MEP and AutoCAD 2005 and 2006, all current new and renovated PetSmart stories projects through the USA; detailed typical sections; made sketches and layouts of non-standard items for drafting personnel.
WILLIAM TAO & ASSOCIATES, INC. Plumbing Engineer
349 Marshall Ave., Suite 200
St. Louis, MO 63119 April 2001 – September 2007
Responsibilities included complete calculations and design of plumbing, water supply, water heating and sewage systems – as domestic as chemical waste systems, pump stations and re-circulation systems for industrial, municipal, residential, educational, scientific research buildings, hospitals using AutoCAD 2000, 2002, 2004. She was responsible for multiple Pfizer and Monsanto laboratory renovation projects design, including process piping renovation; selected and ordered pumps, pipes and other equipment for water supply and sewage systems; using AutoCAD programs, including 3D, detailed piping layouts, typical sections; made sketches and layouts of non-standard items; created schematic diagrams. She created pipeline and equipment bills of materials using Master Spec. Projects as lead designer included: Ely Lilly, Indianapolis, IN - new construction, Laboratory building, Animal building and MRI Center building; Pfizer, Chesterfield, MO - multiple laboratories renovation projects (2002-2007); Monsanto, St. Louis, MO - three laboratories renovation projects (2005-2007).
KENNEDY ASSOCIATES, INC., Plumbing Engineer (contract position)
211 North Broadway, Suite 1900
St. Louis, MO 63102 November 2000 – April 2001
Responsibilities included complete calculations and plumbing systems design, coordination with other disciplines and computer drafting of plans and schematic diagrams including 3D using AutoCAD 2000 for new Jefferson City Correctional Center (16 buildings).
PARSONS BRINCKERHOFF Mechanical Designer (contract position)
1831 Chestnut Street
St. Louis, MO 63103 May-November 2000
Responsibilities included load calculations on Trane Trace 600; computer plans drafting and elevations creating including performing 3D drawings in AutoCAD 14 and 2000 for new TyCom Global Network building.
MORRISON-KNUDSEN CORP. Plumbing Drafter (contract position)
1010 Market Street
St. Louis, MO December 1999 – May 2000
Does not exist anymore
Responsibilities included water supply, waste and storm water plans and schematic diagrams drafting and 3D creating using Microstation for different projects.
JOHNSON MARCRAFT CORP. Mechanical Designer
11880 Dorsett Road
St. Louis, MO 63043 1996 – August 1999
Responsibilities included full design of commercial heaters and air handling units, design and calculations of unit base, fan and motor carrier bases, creating of piping and sheet metal assembly drawings for AHUs in AutoCAD 13 and field supervision of the units assembly. As needed, detailed non-standard items and 3D drawings for shop assembly.
OOO “PLASTPOLYMER” Engineer/Senior Civil Engineer
Poljustrovskiy Pr., d. 32
St. Petersburg, Russia 1984 – 1995
+7-812-***-**** Headquarters
+7-812-***-**** Civil, Fire Protection, Plumbing Engineering Department
Responsibilities included complete design starting from scratch to the walk through of civil, plumbing and fire protection systems for chemical plants in the former USSR – including Okhta chemical plant where she was Chief Project Engineer in Charge, and also Omsk, Tomsk, Kirovo-Chepetsk, Kazan and Shevchenko chemical plants. She was Design Engineer in Charge for TPL, Florence, Italy project and Asahi Glass, Tokyo, Japan project. She performed drawings in AutoCAD 13 including 3D drawings, designed water supply, water heating, storm, domestic and chemical sewage systems, pump stations and re-circulation systems, detailed typical sections and elevations; made sketches and layouts of non-standard items for drafting personnel. She detailed drainage structures such as: culverts, storm sewer, ditches and erosion control items, calculated size, location and type of drainage structures. She checked computations of designers, reviewed and checked of drafting personnel job. She made field checking and supervision. She prepared conceptual reports and other project correspondence. She made all technical and economic calculations, selected and ordered equipment and piping, created pipeline and equipment bills of materials. She prepared documentation for environment and health protection.