TROY DWAYNE FRANKLIN
Rocky Point, NC 28457
***********@*******.***
QUALIFICATIONS: I have 14 years of education. I have 19 years of electronic technician experience. This experience includes: installation, troubleshooting and modification of electronic control systems and circuitry. I also have experience in designing wiring diagrams, layout drawings and engineering specifications for systems.
EDUCATION: Northside High School, September 1986 to June 1989, graduated
Electronics Technology, Middle Georgia Technical Institute, October 1991 to March 1993
PROFESSIONAL TRAINING: *High Reliability Soldering (Air Force MIL-STD-2000), September 1995
*Micro-Miniature Soldering (Air Force), October 1995
*Multi-layer Circuit Board Repair, (Air Force), December 1995
*High Reliability Soldering II (Air Force MIL-STD-2000), December 1995
*Basics of AutoCAD, Macon Technical Institute, March 1997
*Advanced AutoCAD, Macon Technical Institute, June 1997
*Georgia Work Ready Program, Fokker Aerotron, December 2009
*J-STD-001 Certified IPC Soldering Specialist, Fokker Aerotron, October 2009
EMPLOYMENT HISTORY: June 2008 to June 2011, Fokker Aerotron, Electronics Technician
Duties include: designing and fabricating test boxes and cables for unit certification;
Testing, disassembly, evaluating, modifying and assembly of aircraft parts.
February 1998 to October 2008, SouthWestern Communications, Senior Technician
Duties included: Install, maintain, troubleshoot, evaluate and set up: Hard-wired locking systems, PLC based locking systems, intercom systems, Fire alarm systems, camera systems, video recording systems, and personnel detection systems; Also, modified systems with engineer support and provide customer service and training.
February 1993 to February 1998, Ball Aerospace, Electronics Technician
Duties included: Engineering assistance, designing and assembling of PC boards, in accordance with the schematics provided by the engineers; Making all necessary modifications to comply with engineering change orders; Prepare the board for layout
for shipment, by putting all data files in the correct format and ensuring all the information is included as per the requirements established by the PCB manufacturer; Designing and assembling the cables and support boxes; Choosing and ordering components that meet or exceed specifications provided by the project engineer; Milling and modifying components to fit in allotted space; Assembly and testing of all components; Upgrading older assembly to fit in new standards; Maintaining and updating various information systems; Software installation and setup; component specification/requisition; Adding all necessary wiring for new phones and deleting or rewiring of old phone locations to the phone system in order to provide flexibility for a constantly changing demand; Maintain current and up-to-date technical information and extension database; Preventive and/or corrective maintenance and troubleshooting of the phone system.
REFERENCES: Sharon Woodruff, friend, 706-***-****
Pedro Roman, friend and former co-worker, 434-***-****
Dave Duggan, co-worker, 706-***-****
* More references available if needed.