Post Job Free
Sign in

Senior Welding Inspector

Location:
Middlesbrough, MDB, United Kingdom
Salary:
50000 to 60000k per anum
Posted:
April 30, 2010

Contact this candidate

Resume:

MICHAEL ANTHONY AYRE

Tel # 016**-****** Mobile # 079********

E-Mail: *****@****.**.**

Occupation – Senior QC Inspector-Co-ordinator

QUALIFICATIONS:

• CSWIP 3.2 Senior Welding Inspector

• CSWIP 3.1 Welding Inspector

• European Welding Inspector Diploma

• BGAS CSWIP Grade 2 Painting Inspector

• A.S.N.T Level I Ultrasonic Testing

• PCN Level 2 Radiographic Interpretation

• City and Guilds 229 Welding Certs. (Total 7)

• Tradesman Indentured Welder

• Full CCSNG Site Safety Passport

• Chemical and Process Industry Safety Certificate

• BOSIET offshore training cert

• UKOOA offshore medical cert

EDUCATION: Longlands Engineering College, Middlesbrough, Cleveland

T.W.I. North, Aurora Court, Riverside Park, Middlesbrough

SUMMARY OF EXPERIENCE

Twenty two years in welding and fabrication in the oil/gas Construction industry, for the

Onshore – Offshore & Nuclear industry. Sixteen years experience as a Welding/Painting Inspector and conversant with standard ASME Sections 5, 8, 9,& B31.3,16.5, AWS D1.1 API 620,650,1104,BS EN 287-1,PD5500,BNFL Spec Tech 0339_1,BNFL Spec Tech EG 0081_A. Trained and experience in Pneumatic and Hydro testing,Pigging dry & wet line, Positive Material Identification (PMI) ,Radiographic Interpretation and Ultrasonic,F.A.T + MPI and DPI experience and supervision of tradesman, Also painting/blasting & insulation experience+ fully conversant with MS office word & Excel.

EMPLOYMENT HISTORY:

Nov 2009 – May 2010 Costain Oil Gas & Process LTD,Styal Rd,Wytenshaw,

Manchester,MS225WN,UK.

QC Client Inspector, Employed as a Client Inspector in the QC department, Customer Sellafield Nuclear fuels, Project Evaporator D, Work included visiting various fabrications

Shops around the U.K doing client inspections of fabrications for the Evaporator D project, but based predominantly in Bendalls Engineering Carlisle overseeing the main fabrication of the Evaporator Vessel and transition flow line wall boxes, duties included

Reviewing LTQR doc packs, material checking of 304L,316L & 18/10L NAG grade stainless steel against material Certs,dimensional checks of main Evaporator vessel,flow

Line spools, pipe fit ups, Acceptance of Radiographs,Witness Hydro testing,Load testing

Wet and dry Line Pigging, Witness Blasting and painting of carbon steel main frames as

Per specification and final dimensional checks of fabricated product to approved drawing,

Specifications worked to were BNFL Spec.Tech.A.0339_1, BNFL.EG.0081_1_A

BNFL.Spec. Tech.B.0303_1 , BS EN 287-1 and PD 5500.



Contact this candidate