Career Profile

Professionally trained and more than 3 years experience as an Electrical Engineer in 250 MW and 500MW power generation plant testing, commissioning and life extension activities committed to the performance based project management environment. Strong customer service attitude, exceptional organizational ability and strength in:

Design Review Electrical Control System

Failure Analysis Testing & Commissioning

Contract Services Work Scope development

Review Engineering Proposal Factory Inspection

Renovation & Modernization

Professional Accomplishments

Participated in Testing and Commissioning of electrical equipments for 2x250MW Project and 1x500MW Project.

Completed various factory inspections for electrical equipments and related documentation for the new projects before dispatching to site for installation.

Work Experience

MAHAGENCO, 1150 MW Koradi

MAHAGENCO, O/o Dy Chief Engineer (Testing, Instrumentation and control), Nagpur, India

Assistant Engineer(Testing) from Oct 2011-Present

Presently working testing team lead for coal and transformer oil testing in Central Coal and Oil Testing Laboratory.

Member of Core Committee form for implementation of SAP module (Nirmiti) in MAHAGENCO.

MAHAGENCO, S.E Testing Koradi, Nagpur, India

Junior Engineer (Testing) from Sep 2009 – Oct 2011

Deputed to testing and commissioning activities for 1x500MW Khaperkheda project

Worked with testing and commissioning team lead for 1x500MW Khaperkheda Project

Successfully completed the testing and commissioning of 70MVA Station Transformer with its protection system,

Conducted the testing and commissioning of 6.6KV and 11KV switchgears.

Cable schedule preparation and co-ordination with 400KV system.

500MW Generator testing and related protection system

Generator transformer, unit auxiliary transformers, Station Transformer and other service transformers

Auto and manual synchronization system.

Fast bus transfer system and modified control system for integration with main system

Dynamic Testing of protection system of the unit & Synchronising.

Commissioning and Testing of Variable Frequency Drive for ID fan.

Commissioning and testing of 24 Vdc and 220 Vdc Battery Charger.

Associated with testing and commissioning of 42 LT package and completed –

Testing of relays, motors and breakers

Panel testing, cable termination checks and control system trial from local panels.

Reviewed the cable schedule prepared by OEM and contractor for system integration.

Participated in commissioning of electrical control system for –

Coal Handling Plant

Ash Handling Plant

ESP

Black Start Diesel generator

Plant air and Instrument Air Compressor.

Deputed to testing and commissioning activities for 2x250MW Paras project.

Junior Engineer(Testing) from Aug 2008 – Sep 2009

Deputed as testing and commissioning team lead for 2x250MW power Paras Project

Successfully completed the testing and commissioned following main electrical system –

250MW generator testing and related protection system

Generator transformer, unit auxiliary transformers, Station Transformer and other service transformers

Auto and manual synchronization system.

Fast bus transfer system and modified control system for integration with main system.

Conducted the testing and commissioning of 6.6KV switchgears (6Nos.) includes –

Microprocessor based protection relays testing and settings (Micom)

Breaker testing, CT/PT testing, Panel trials.

Operation of the system from local and control room for integrity of control system.

Prepared cable schedule for inter panel wirings, remote panels, interconnections of switchgear with remote panels.

Dynamic Testing of the units.

Commissioning of Variable Frequency Drive for ID fan.

Commissioning and testing of 24 Vdc and 220 Vdc Battery Charger.

Associated with testing and commissioning of LT package and completed –

Testing of relays, motors and breakers

Panel testing, cable termination checks and control system trial from local panels.

Reviewed the cable schedule prepared by OEM and contractor for system integration.

Participated in commissioning of electrical control system for –

Coal Handling Plant

Ash Handling Plant

Water treatment Plant

Plant air and Instrument Air Compressors

Factory Inspections for New projects like Paras 2x250MW, Khaperkheda 1x500MW, Chandrapur 2x500MW.

INDO-RAMA Synthetics India Ltd,Butibori, Nagpur, India

Electrical Engineer (Project) from Sep 2006 – Aug 2008

Testing, installation and commissioning activities for continuous polymerization (CP-4/5) project

Commissioning and installation of Siemens (Masterdrives VC/MC & Micromaster) and Vacon inverter drives

Conducted the testing and commissioning of 3.3 KV and 11KV switchgears

Commissioning and installation Siemens protective relays (Siprotec, Simocode Pro C), Profibus Communication, LT motors, Soft Starter for HT motors.

Associated with testing and commissioning of LT package and completed –

Testing of relays, motors and breakers

Panel testing, cable termination checks and control system trial from local panels.

Energy Monitoring System (EMS).

Commissioning of SAP PM (Preventive Maintenance) Module which include Master Data Collection, Compilation and updating.

Training and Development

52 weeks Power plant operation and maintenance by Koradi Training Institute

Generator protection and control systems by CPRI.

6.6 KV switchgear operation and maintenance by NTPC.

References and Personal Details

References are available on request