Post Job Free
Sign in

Project Manager/Cost Estimator

Location:
Crowley, TX
Salary:
negotiable
Posted:
May 27, 2011

Contact this candidate

Resume:

Jody Joyner

*** ***** ** *******, ** ***** 817-***-**** cphi58@r.postjobfree.com

Recent graduate with BS in Construction Management, with 3.66 GPA.

Looking to secure a position that will enable me to use my strong organizational skills, educational background and ability to work well with people.

Looking for a good fit in an organization where I am surrounded by extraordinary people whose knowledge I can learn and grow from.

EDUCATION

Graduated from ITT Technical Institute, Arlington, TX

Bachelor of Science – Construction Management

GPA: 3.66 - 4.00

December 2010

Graduated from ITT Technical Institute, Arlington, TX

Associate of Applied Science Degree – Computer Drafting & Design

GPA: 3.8 - 4.00

March 2009

SKILLS

• Excellent communication, leadership and interpersonal skills.

• Proficient in MS Project, MS PowerPoint, MS Excel, MS Word and project management software.

• Knowledge of the principles and practices applied in design, construction and maintenance.

• Ability to read and interpret blueprints, contract plans, and specifications.

• Proficient in flowcharting/process mapping software.

• Ability to accurately estimate construction projects with the use of modern tools.

• Knowledge of design, planning, engineering, architectural, and contractual requirements in construction projects.

• Knowledge of HVAC, mechanical, electrical and plumbing systems.

• Knowledge of the major issues concerning contract law.

• Knowledge of specifications.

• Knowledge of building codes.

• Knowledge of safety regulations and safe project management and control.

• Knowledge of engineering principles for construction applications.

• Knowledge of materials, and able to employ appropriate methods for their use and application.

• Knowledge of productivity, utilization and efficiency to determine the selection of appropriate equipment for various types of projects.

• Knowledge and ability to schedule projects using modern tools.

• Ability to detect and correct plan defects during construction phase.

• Ability to establish and maintain effective relationships with others inside and outside the organization.

• Ability to monitor the implementation of contractors' quality control plans.

• Perform well in a multi-disciplinary team environment.

EMPLOYMENT

Student

Stay at home parent, by choice, following the birth of my children 2007 to 2010

Team Leader

Palm Harbor Homes

401 S Burleson Blvd, Burleson, TX 76028 817-***-****

2001 to 2007

• Coordinated carpet installation crew with other Team Leaders in order to maximize production performance

• Developed and maintained safety program and training

• Maintained production logs and recorded inventory daily

• Responsible for training new hires

• Maintained positive relationships between my crew, other crews, and upper management

• Maintained positive relationship with vendors and customers

Pressman

Southwestern Color Graphics

Keene, Texas

1997 to 2001

• Cleaned and Maintained offset printing press

• Cleaned and loaded ink fountains

• Responsible for changing plates and wiping rollers

• Stacked and loaded paper into press

REFERENCES

Danny Ross 817-***-****

Paul Brown 817-***-****

Patsy Johnson 817-***-****



Contact this candidate