James Dee
***** *. **** ****** *****, Alto, MI 49302
Phone 616-***-**** ************@*****.***
OBJECTIVE
Project or Operations Manager position in fast-paced industry, enabling me to use my extensive management experience in various industries and disciplines and my leadership and technical skills in a professional, progressive, team-oriented environment.
PROJECT MANAGEMENT QUALIFICATIONS
• Successfully directed (on-time and on-budget) simultaneous projects to design, supply and commission complete automated control systems for the Gateway Energy and Coke Company 120 Oven Heat Recovery Coke facility (SunCoke Energy) and the adjacent USS Granite City Works Powerhouse #3 80 Megawatt Cogeneration facility. Fostered successful relationships with the customers and other suppliers.
• Provided concurrent project management over dozens of automated assembly systems for a custom machine builder in the automotive industry, while simultaneously serving as operations manager for the company.
• Responsible for the complete design, build, installation and commissioning of a $10 million automated refrigerator door foaming system for Electrolux Home Products Refrigerator plant in Greenville, Michigan, which met the customer’s schedule and production requirements.
• Served as the ‘Responsible Engineer Coordinator’ for the $270M Comsigua Direct Iron Reduction Facility project, monitoring the procurement activities for Kobe Steel being built in Puerto Ordez, Venezuela, and establishing standardized specification guidelines for future projects.
• Other projects include the Alcoa Prototype High Pressure Aluminum Extrusion system, a Lear Industries Automotive Carpet Backing System, a Howmet Dover Casting Investment Casting Furnace, a Bayer Chemical Laboratory Polyurethane Test Unit, the Uniform Color Company Twin Extruder Vent Vacuum System, a coal refuse slurry pipeline and conveyor system, numerous polyurethane injection systems and several coal facilities.
KEY DESIGN QUALIFICATIONS
• Directed the complete design for reduction furnace area of Comsigua Direct Iron Reduction Facility, being built in Puerto Ordez, Venezuela.
• Provided the lead for establishing the prototype design for the Alcoa high pressure molten aluminum extrusion system
KEY DESIGN QUALIFICATIONS (continued)
• Produced the design for the hydraulic and pneumatic systems for the automated door foam system for Electrolux Home Products in Greenville MI
• Mentored engineering teams in the design of numerous plant and equipment projects.
COMPUTER SKILLS
Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft Project, AutoCad, Witness Process Simulation Software, Product View 3D model viewing software
EMPLOYMENT
Crown ESA Portage, IN
Project Manager 2008-present
Duties: Project manager over complete control system design, build, installation and commissioning for new Heat Recovery Coke plant and adjacent Steam Cogeneration facility. Provided design guidance, maintained budget and schedule, performed customer and vendor interface, assisted in process design, established document control, and led the onsite commissioning team to a successful on-time/on-budget startup of both facilities.
Sun Coke Company Knoxville, TN
Project Engineer 2006-2007
Duties: Project manager over front-end loading engineering process for a heat recovery coke plant. Developed and tracked budget and schedule, regularly met with the customer, conducted vendor interface and contract negotiations, wrote equipment specifications and directed document control.
Uniform Color Company Holland, MI
Manufacturing/Process Engineer 2004-2006
Duties: Established operating process for company’s twin screw extruders, managed capital projects, led the team that conducted safety incident investigations, performed quality audits, conducted process troubleshooting in all areas of manufacturing facility.
Automation Specialists, Inc Holland, MI
Operations Project Manager 2003-2004
Duties: Operations manager, providing supervision for entire machine shop and system assembly team. Project manager for all company projects, Served as customer liaison, conducted purchasing, prepared equipment manuals, and performed shipping and receiving.
EMPLOYMENT (continued)
Howmet Research Corporation, Mfg Tech Dept Whitehall, MI
Project Engineer 2001-2002
Duties: Project manager over design, build and installation of vacuum casting furnace for super-alloy parts. Project manager over concept, design and build of prototype liquid aluminum extruder. Developed budgets, wrote design and purchasing specifications, directed design team, met with customer, and was responsible for coordinating installation and startup.
Cannon USA Cranberry Twp, PA
Project Engineer 1994-1996, 1998-2001
Duties: Project manager over polyurethane injection equipment builds, including $10M door foaming system for Electrolux Refrigeration. Provided hydraulic and pneumatic system design, monitored design teams, tracked budget and schedule, wrote vendor purchase specifications, met with customer, coordinated documentation of projects, provided shop floor interface, and assisted with installation and startup.
Trimark Engineers Pittsburgh, PA
Mechanical/Project Engineer 1996-1998
Duties: Directed the mechanical design team for furnace area of an iron ore reduction facility. Responsible for establishing purchasing specifications and conducting vendor bid meetings for various system components, including system hydraulic units. Coordinated the team of engineers that were responsible for equipment.
Coal Energy Engineers, Incorporated Pittsburgh, PA
Project Engineer 1991-1994
Duties: Project manager over coal process plant additions, coal slurry pipelines and coal conveyor system. Developed and tracked budget and schedule, performed customer liaison, directed the design team, wrote bid specifications and performed document control.
EDUCATION
University of Pittsburgh Pittsburgh, PA
BS Mechanical Engineering 1990