Post Job Free
Sign in

Test Lead

Location:
Exton, PA, 19341
Posted:
April 11, 2012

Contact this candidate

Resume:

DEVIKA KISEN Mobile: 847-***-****

Email: **********@*****.***

Professional Summary:

• 9+ years of experience in testing of diverse applications on various platforms.

• Extensive experience in Manual Testing, Automated testing and quality assurance of Client/Server and Web applications using Black Box testing.

• Experience in creating Test Plans, Test Case Procedures, Test Scripts, Test Logs and Test

• Good experience testing applications in Agile development environment including TDD

• Expertise in performing different kinds of testing like Sanity, Smoke, Black Box, GUI, Functionality, Unit, Integration, Regression, Compatibility, System, Performance, Load, Stress and User Acceptance Testing(UAT) of web and client/server applications.

• Expertise in Manual and Automated Testing using Test Director or Quality Center in real time and unattended testing environment across multiple operating systems and technologies.

• Good understanding of Software Development Life Cycle (SDLC) & Software Testing Life Cycle (STLC).

• Experience in Defect Management using Test Director/ Quality Center. Experience with Mercury Suite Tools.

• Experience with QA Methodology and QA Validations to ensure the Quality Assurance Control. Knowledge in different automation tools like Win Runner, Load Runner.

• Good experience in using rational clear case and clear quest.

• Extremely involved in managing defect tracking system like Workflow and Bugzilla

• Recording test, debugging test, editing test-using Mercury Suite Tools, running and analyzing results.

• Writing SQL queries to extract data from various source tables to perform database testing.

• Good Knowledge of Backend Testing for validating database using SQL queries (TOAD, SQL Developer)

• Expertise - EMS/NMS network systems, Configuration of ATM, SONET/SDH, Frame relay on EDGE-Routers (Juniper), Wireless (GSM).

• Expertise in Cramer(Inventory Network Management) Testing worked at onsite location

• Coordinating onsite / offshore activities

Education:

• Bachelor of Engineering in Telecommunication

Achievement:

• Certification from Hewlett Packard for outstanding performance/efforts. Rewarded with e-awards for year 2007-2008.

• Certification from Aricent for participation and contribution to Leadership Alpha Program.

Work experience:

Aug’08 to till date: Aricent

Apr’05 to Aug’08: Hewlett-Packard(HP)

May’04 to Apr’05: Sasken Network Systems Ltd

Dec’03 to Apr’04: Chip Integration Technologies

Nov’02 to Nov’03: Bharat Electronics Limited (BEL)

Technical Skills

Operating System - Windows 98/2000/XP/NT, Unix

Applications Tested - Windows / C / C++ / Web Based (Java)

Automation Tools - Win Runner ,Load Runner, QTP

Defect Tracking Tools - Rational Clear Quest , Test Director, Quality Center, Bugzilla

Version Tracking Tool - Rational Clear Case

Languages - C, C++, SQL, XML, HTML

Documentation - Microsoft office tools

Domains - Embedded, Wireless, Inventory management, Fault management, performance management(Open view), configuration management, Service Quality management

Knowledge Areas:

• GSM, TCP/IP, SS7, SNMP, Test Driven Development (TDD), Agile Methodology, L2/L3, Web services, SOA.

Professional Experience:

# Project - e-billing interface

Company - Aricent

Designation - Sr Test Engineer

Team Size - 10

Project Description

Project deals with the testing & certifying each release of a trouble shooting application & its interface with billing sub-system. This enterprise product is a web based application which is developed on SOA (service oriented architecture). Being part of QA team needs to support multiple releases which include validation of business critical feature, testing across multiple environments & its interfaces with billing sub-subsystem.

Role and Contribution:

1. Analyze User Requirements and Specifications and develop Test Plans and Test scenarios.

2. Prepared the test Strategies, test plans, test cases, test Scripts, test Results, for both positive and negative Scenarios and mapped the same to Requirements.

3. Co-ordination with cross team to get the project requirements, gather and communicate the project status to the off shore team.

4. Involved in daily meetings with the technical managers and development test leads regarding the schedule, resource management and activities tracking.

5. Worked closely with the Business Analysts, Developers, and Database Architect in identifying the outstanding Issues in User Requirements and Specifications.

6. Created and executed test Scripts using QC for System, Integration and Regression testing.

7. Prepared status summary reports with details of executed, passed and failed test cases.

8. Made extensive use of Quality Center to create and maintain documents such as test plans, test execution and test results documents.

9. Responsible in providing regular test reports to the management.

10. Identifying the problems, prioritizing them and communicated the bugs to the developers using Quality center.

11. Converted the manual tests into automated using QTP. Created various data tables, Parameterized the test scripts for data driven tests.

Environment: Quality center 9.2, JAVA & .NET web applications, UNIX, SQL, Agile development environment, QTP.

# Project - Customer speed upgrade -TDC

Company - Aricent

Designation - Test lead

Team Size - 5

Project Description

This project deals with implementing fully integrated solution for customer speed upgrade. These activities will be fully automated within the inventory and co-ordinated by the OM/TM platform. To facilitate a meaningful demonstration, the inventory processing will include switch to allow the processing to be operated manually. The existing service includes Customer Premise Equipment capable of supporting speeds up to 100Mb. The card and SFP in the access router are matched to the CPE and can support up to 100Mb. The 10Mb limit is enforced by a port limit set in the access router configuration, with the expectation the customer may want to increase bandwidth at some time. The speed change requested by the user is 250Mb – greater than that supported by the access infrastructure.

Role and Contribution:

1. Analysis of requirements of existing setup.

2. Generating Integration test cases for scenarios for –

• New service

• Actual upgrade

• Removal of old service

3. Provide interface to Order Management, Migration and Planning of the above scenarios in Cramer using TET.

4. Involved in project review meetings and discussed issues, status for tracking the progress with project teams

5. Execution of Integration test cases.

Environment: HP-UX, SQL, Quality center 9.2, JAVA, Cramer (Inventory network management)

# Project - TDC-SQM

Company - Hewlett Packard

Designation - Sr Software Engineer

Team Size - 7

Project Description:

This project deals with loading the information from TDC Inventory to OVPI and SQM system for management. Data coordinator being the core component will take care of following:

• Preprocessing of CSV files from TDC Inventory

• Load the entities onto OVPI system as first level into temporary tables

• Trigger the partial business logic processing of stored procedures for data comparison

• Handle and management the data rejection of entity instances

• Load the data into OVPI and SQM systems using relevant system interfaces of CLI

• Supports both bulk (sync) and delta load of data into OVPI and SQM systems.

Role and Contribution:

1. Generating Integration test cases for 2 separate components

• OVPI &

• SQM.

2. Execution of test cases

3. Involved in review of Unit test cases for the same.

Environment: HP-UX, Agile methodology , Open View Performance Insight, ServiceQualityManagement, TOAD, Quality Center, Java

# Project - BSNL GSM OVPI (OpenView Performance Insight)

Company - Hewlett Packard

Designation - Sr Software Engineer

Team Size - 7

Project Description:

This project deals with the Performance management from the HP Open View portfolio of products. The product provides insight into the performance of the Network by providing several useful reports.

There is Data Pipe that interfaces with the EMS to pickup and process the flat-files. The report pack picks up processed data from the data pipe and generates the final report. The generated report is accessed through the Web Brower/GUI.

The OVPI system picks up data from EMS using FTP. As the report generation data is picked up from the EMS, the reporting functionality is constrained by the parameters exported from the EMS in the flat-file format.

The OVPI system also generates certain threshold alarms when certain performance thresholds are exceeded. These threshold alarms are forwarded to the Fault Management System. Various reports are generated on demand for varying time periods, for instance, – last 24 hours, last 15 days, last 12 weeks, and last 12 months.

Role and Contribution:

1. Involved in writing integration test plan for Performance Management.

2. Generating test cases for scenarios and mapping the same with RTM.

3. Execution of test cases

Environment: HP-UX, Open View Performance Insight, ServiceQualityManagement, TOAD, Java

# Project - Access Transmission Program(Vodafone, London UK)

Company - Hewlett Packard

Designation - Sr Software Engineer

Team Size - 7

Project Description:

The access transmission network connects Vodafone switch sites to their radio base stations around the UK .The intended approach is to migrate selected leased lines to a microwave technology based network wherever possible.

There will be a two-tiered network made up of the Distribution Access Network (DAN) layer and the Tail Access Network (TAN) layer. The DAN will be based on fibre collector rings dual homed to two MTX sites..

The TAN links the RBS sites to the closest Hub site. The TAN will be a mix microwave and remaining leased lines. Vodafone UK (“VF UK”) has initiated the Access Transmission Programme (“ATP”) to drive down the ongoing cost of their access transmission network.

Role and Contribution:

1. Generating test cases for scenarios.

2. Planning, provisioning and migrating traffic on the ATP network using Cramer.

3. Involved in Infrastructure planning for Tail access Network

4. Building end to end cross domain circuits using task engine template (TET)

Environment: Cramer(Inventory network management), TOAD, HP-UX, Testdirector,Java

# Project - Scimitar (Vodafone, London UK)

Company - Hewlett Packard

Designation - Sr Software Engineer

Team Size - 7

Project Description:

The scope of this project and its associated set of specifications is to define the inventory model, the associated planning functionality, initial dataload and the means of achieving ongoing data integrity that is delivered by Strands A.2 and A.3 into the overall Scimitar programme. The model and planning capabilities support the CPN, Corporate Connections, CHE and 3G Core Packet domains as well as the MTX ODF fibre and OTIS network domains.

The full software suite of products being supplied by Cramer within the Scimitar programme is termed Cramer4. Within this are modules named ResourceManager, Configurator, RouteFinder, TaskEngine, DeliveryEngine and SyncEngine.

Role and Contribution:

1. VLAN Data Migration (Involving around 2 TET’s for data)

2. APN Data Migration (Involving Around 4 TET Execution for a data)

3. CPN network Data Cleansing.

Environment: Cramer (Inventory network management), TOAD, HP-UX, Testdirector,Java

# Project - TNOMS

Company - Hewlett Packard

Designation - Sr Software Engineer

Team Size - 15

Project Description:

TNOMS (Telecom Network Operation Management Support System) an Integrated NMS solution delivered by HP. Project functional areas includes:

- Fault Management, Performance Management, Inventory Management, Circuit Management

It supports the integrated GUI architecture to handle all the subsystems independently. Each of these subsystems are tested separately based on the functionality. The inventory management system auto-discovers the changes in the network and updates its inventory. Different type and vendor EMS provide the NE’s internal information using its own north bound protocols. The Config AM is provided for each vendor and protocol specific EM. These AMs are responsible for interfacing with NE’s corresponding EMS and retrieve the network configuration information from the EMS and translate it into format understandable by the framework. User has a choice in committing the discovered information, and if so, this then updates the Central Network and Service Repository as per the network and service model pre-defined.

Role and Contribution:

1. Involved in writing integration test plan for Inventory Management &

Performance Management.

2. Generating test cases for scenarios and mapping the same with RTM.

3. Execution of test cases

4. Involved in SQA activities.

Environment: HP-UX, SQL, Test director, clear case, SNMP, Advent net simulator

# Project - JMTE

Company - Sasken

Designation - Verification Engineer

Team Size - 30

Project Description:

EMS-JMTE is the Element Management System for Juniper Networks, which is an integrated modular system that allows you to remotely manage network elements in your networks. This project deals with testing & managing the Edge Routers. In EMS, Configuration Management is achieved using network manager portion of the software. All the network elements can be configured from one central location & also EMS will replicate the data to every appropriate network element when ever it is entered into the system once.

Role and Contribution:

1. Involved in Configuration of ATM on router.

2. Preparing and Executing the testcases.

3. Automating the whole testing process.

4. Generating scripts for the scenarios.

5. Involved in preparing test plan for automation.

Environment: Solaris, SQL, clearquest, Winrunner, Advenet Simulator,V880 server

# Project - LNP

Company - Chip Integration Technologies

Designation - Verification Engineer

Team Size - 7

Project Description:

Wireless LNP is a wireless consumer's ability to change service providers within the same local area and still keep the same phone number. This project deals with the testing of front end application for the above functionality.

Role and Contribution:

1. Collected and analyzed the functional specs and user requirements Preparing and Executing the testcases.

2. Developed Test Plan based on functional specs

3. Developed Test Case Scenarios for System Testing and Regression Testing.

4. Wrote test procedures, test cases from Use Cases and executed them.

5. Analyzed the expected and the actual results

6. Tracked the results in the Test Director and reported the system defects and bugs.

Environment: TOAD,Java,Testdirector

# Project - GSM interface to LCD display

Company - Bharat Electronics Limited

Designation - Project Engineer

Team Size - 8

Project Description:

This project deals with the display of SMS messages sent by any remote subscriber on a LCD located in a common place. GSM modem, which has the SIM card, receives the call from the remote subscriber. This modem is connected to the AT161 micro controller, which interfaces and controls the transmission & display of the message. A ‘C’ code was developed to control the activity of AT161 controller.

Role and Contribution:

1. Involved in study of AT161 controller& development of a ‘C’ code for controlling the activity of the micro controller.

2. Involved in testing of the same

Environment: Solaris, SQL, Clear Quest, Winrunner

# Project - Wireless message transfer unit using Enhanced Serial Communication Controller (SAB 82532)

Company - Bharat Electronics Limited

Designation - Project Engineer

Team Size - 10

Project Description:

This is a unit that is intended to transfer Ethernet packets to the Mobile Clients (Remote Units) from the LAN with Baud Rate 9600bps.This Serial Controller is a multi protocol data communication controller with 2 symmetrical completely independent full-duplex serial channels .It has been designed to implement high speed communication links to reduce hard ware and software needed for HDLC, SYNC/ASYNC communication.

Role and Contribution:

1. Prepared test plans based on changes requested to the existing process or new processes.

2. Built test cases from business requirements.

3. Worked with functional team members to translate business requirements into technical specifications.

4. Provided reliable, timely support of integration, performance and user acceptance testing processes.

5. Traced all bugs, issues and tickets using Clearquest.

Environment: UNIX, SQL, Clear Quest



Contact this candidate