Post Job Free

Resume

Sign in

Power Plant Control

Location:
United States
Salary:
10000 USD/month
Posted:
August 22, 2012

Contact this candidate

Resume:

APICHOKE PHADOONGPRASERTKUL

**/** ***. ********* ** M.3 T. Pala

A. Banchang Rayong, Thailand 21130

Home : +66 (0)38-601293

Mobile : +66(0)81-8648613

Bahrain Mobile Number: 009**********

E mail :c9iqvr@r.postjobfree.com

:c9iqvr@r.postjobfree.com

SUMMARY

A Supervisor level for eighteen years of experience. Skill in pre-commissioning, start up, 3 Phase processing, electrical, instrument, machines equipment, well testing and operating control oil and gas section, crude oil separation, Gas separation, Condensate separation, gas compression, mercury separation, CO2 remover, remote platform, FPSO, Refining process, Plastic process and Distribution Control System (DCS) & Man machine interface( MMI ) & PLC Pro-logic control Panel, Permit to work, Isolation tag, log-in and log-out, maintenance with the highest safety and environment standards procedure.

WORK EXPERIENCE

ANOTECH Energy UK Limited. July 2012 – Present

Oil & Gas and Water separation and treatment TATWEER Project AL AWALI OIL FIELD in Bahrain.

Commissioning Supervisor.

Pre-commissioning, start up, HMI control panel, 3 phase separator process plant, water treatment plant, Electrical, Instrument also with the highest safety and environment standards procedure.

• Control manpower in commissioning teams.

• Control the schedule times commissioning and start up.

• Checked list and documentation.

• Loop checked for electrical supply.

• Loop checked for instrument control.

• Pre-commissioning and start up HMI control panel.

• Pre-commissioning and start up process 3 phase separator oil and gas plant.

• Pre-commissioning and start up water treatment plant.

• Pre-commissioning Fire and gas system.

• Training the employee of the client for operation plant before hand over plant.

Doosan Heavy Industries & Construction. September 2011 – May 2012

Coal power plant 660 MW project.

Production and Maintenance Supervisor.

Pre-commissioning, start up, DCS control panel, Plc control, Process and equipment in the Power plant, FGD, ESP, Boiler, FD Fan, ID fan, PA Fan, Puliverizer, Sootblow, Turning gears, Mark six control panel, Steam turbine, Generator, Low Nox bruner, Condensate system, Condenser, Closed Cooling, air compressor, Condensate Polishing Plant and working outside also with the highest safety and environment standards procedure.

• Control manpower in production and maintenance teams.

• Control the schedule times commissioning and start up.

• Coordinated with related department for support production.

• Order the spare parts for support the production and maintenance teams.

• DCS control panel pre-commissioning and start up.

• Pre-commissioning and start up equipment in power plant processing with highest safety and successfully.

• Clearing trouble shooting in the process.

• Coordination work permitted.

• Maintenance the equipment in the process plant.

• Planning scheduler preventive maintenance.

• Training employee of client.

• Reported to Production Manager.

Doosan Heavy Industries & Construction. September 2010 – September 2011

Coal power plant 660 MW project.

Leader I&C Commissioning Engineer.

Pre-commissioning, start up, checked DCS graphic, Logic switching system, Interlock system, Function testing, Instrument termination, Instrument control loop, JB and instrument equipment inspection, Cable wiring inspection, Cable tray inspection, Digital input checked, Digital output checked, Analog in and out checked, DCS panel pre-commissioning, start-up, installing trouble shooting, improvement, calibration work, function tested switch gears, interlock checked, process loop control, boiler system, steam turbine control system (Mark Six), waste water system, utility system with the highest safety and environment standards procedure.

• Control manpower and schedule commissioning.

• Inspection instrument control and loop control.

• Digital input, output and Analog checked.

• Loop checked instrument control.

• Loop check electrical control.

• DCS control panel pre-commissioning and start up.

• PLC logic checking.

• Cable wiring inspection.

• Interlock function checked.

• Function tested switch gears.

• JB and instrument equipment inspection.

• Work permit coordinator.

IPEDEX International CO.,LTD. November 2009– September 2010

Oil & Gas Exploration Process.

Production and well test Supervisor.

Management Operation, Well test and Maintenance teams, Coordinate and control work permitted, Control the overtime budget, Control the target product, management time schedule, report to field Supervisor, Provided and planning manpower, Training Production operator, Well test operator, Mechanics operator, E&I technician, pre-commissioning, start-up, SIMOPS under rig working and worker with the highest safety and environment standards procedure.

• Management production and maintenance teams.

• Management and optimize the production target.

• Provided and planning manpower for the jobs.

• Well monitoring and control.

• Production balance.

• Management the time scheduler for the jobs.

• Provided the equipments for the well test and production.

• Provided certificate for the equipment on the well test and production.

• Management the production budget.

• Coordinated with related department for support production.

• Coordinated with the supplier.

• Coordinated with the client.

• Control work permitted with highest safety procedure standard.

• Reported to Field Supervisor.

Production Tester International CO.,LTD. February 2008 – November 2009

Oil & Gas Exploration Process.

Senior Production and Well Test Technician( Night Shift Supervisor).

Well testing, Un-loading, Pre-Commissioning, start-up, Coordinate work permitted, Control the target product, Management Operation and Maintenance teams, management time schedule, report to OIM, training Production operator, Maintenance operator, E&I technician with the highest safety and environment standards procedure..

• Management and optimize the production target.

• Provided and planning manpower for the jobs.

• Coordinate and control work permitted for work with highest safety and successfully.

• Well monitoring and control.

• Production balance.

• Gas control and production control

• Provided the jobs for Pre-commissioning, start up wellheads platform and process separation with highest safety and successfully.

• Coordinated with the supplier.

• Provided certificate for the equipment on the well test and production.

• Provided certificate for the equipment and material.

• Operating remote wellhead platform and equipment with highest safety and successfully.

• Reported daily to OIM.

.

FIRCROFT Recruitment CO.,LTD. November 2006 – February 2008

Oil & Gas Exploration Process ( Chevron Offshore Production )

Senior Process Operator

Take care, Control DCS panels on the Process of Condensate separation, Stabilization, Gas separation, Dehydration gas, CO2 remover (membrane unit), Mercury unite remover, Booster compressor, Water treatment, Gas compression, Maintenance, Remote Well head control panel, Blow down wellhead, Tested condition wellhead, Launch pig, Chemical injection and also works as a field.

• Start up plant well in the short time with highest safety and successfully.

• Operating remote wellhead platform and equipment with highest safety and successfully.

• Pre-commissioning, start up wellheads platform under rigging with highest safety and successfully.

• Well monitoring and control.

• Production balance.

• Gas control and production control.

• Gas monitoring selling chart.

• Saved the plant from the shutdown from process line creaking

• Reported daily to supervisor.

Brunel Engineering CO.,LTD.(JDR Cable Project) June 2006 – November 2006

Designers Manufacturers of Cable and Umbilical system for the Global Oil and Gas, Wind Energy, Diving Seismic Scientific and Defense Industries

Production Engineer

Control quality of the product, Management Operation and Maintenance teams, report to GM manager, Training Production operator and Maintenance operator.

• Reported to GM manager.

• Pre-commissioning and start-up the machine.

• Control and operation panel, machine start up and shut down.

• Solution the problem on the process and find out.

• Training Production operator and assignment job to Production operator and Maintenance Operator.

• Inspection machine, training and bring the machine from UK to Thailand.

• Maintenance equipment machine.

Brunel Engineering CO.,LTD.(ABB Gas compression Project) November 2005 – January 2006

Compression gas plant, Utility, Power plant.

Shift Operator

Preparing for pre-commissioning and start up the process, Gas turbine Management Production operator, Planning, reported to manager.

• Reported to manager.

• Pre-commissioning and start up, GE gas turbine, electrical power, instrumentation, transmitter, calibration transmitters, control valve, PLC logic control, Panel DCS, sequence control, process interlock, process control loop, ESD with highest safety and successfully.

• Pre-commissioning and start up process panel DCS, checked pipe line, inspection vessel, Stud-bolts, gaskets, equipment, pumps, valves, pump tested run, compressor tested run, boxing up, water flushed, Hydro tested, air tested, Nitrogen bank, leak tested, start up process, Utility plant, Power plant with highest safety and successfully.

WNSR Engineering CO.,LTD.(PTT LPG Tanker Project) July 2005 – October 2005

Serviced Installation and calibration instrument, Electrical Wiring, loop control, Pre-commissioning, start up, modified Project PTT LPG tanker.

E&I Supervisor

Management E&I technician, planning, out side working, reported to manager.

• Reported to Manager.

• Take care, planning and management project PTT LPG tanker, Jetty.

• Meeting and associate with PTT company, Yokogawa company.

• Working and checking control loop, electrical and instrument, wiring, other.

MMsvs Group CO.,LTD.(MODEC Singapore Project) March 2005 – June 2005

Oil & Gas Exploration Process FPSO MODEC Project. ( Pearl oil Offshore Production )

Senior Process Operator

Assistance supervisor, take care, Control HMI panels on the Process FPSO on Crude separation, Gas separation, Dehydration gas (glycol de-hydration unit), Gas lift compressor, Water treatment, Gas compression, Sell gas metering, Oil Offloading, Maintenance, Well head platform, Chemical injection and also works as a field.

• Pre-commissioning and start up electrical power, instrumentation, transmitter, calibration transmitters, control valve, PLC logic control, Panel MMI, sequence control, process interlock, process control loop, ESD with highest safety and successfully.

• Start up plant well in the short time with highest safety and successfully.

WEATHER FORD CO.,LTD.(SBM Offshore Project) September 2001 – September 2003

Oil & Gas Exploration Process FPSO SBM Project. ( Chevron-Texaco Offshore Production )

Senior Process Operator

Take care, Control HMI panels on the Process FPSO on Crude separation, HP Gas separation, IP Gas separation, Gas lift compressor, Dehydration gas (glycol de-hydration unit), Water treatment, Gas compression, Sell gas metering, Oil Offloading, Maintenance, Well head platform, Chemical injection and also works as a field.

• Saved Process plant from firing at HP flare scrubber.

• Start up plant well in the short time with highest safety and successfully. Well monitoring and control.

• Production balance.

• Gas control and production control.

• Gas monitoring selling chart.

• Gas compression.

• Offloading selling crude oil.

ALLIANCE REFINING CO.,LTD. October 1995 - April 2000 Refinery Plant ( Chevron – Texaco – Ptt)

Senior Process Operator

Take care, Control DCS panels on Crude separation, Crude Distillation unites, Vacuum Distillation unites, Gas plant Distillation unites, Maintenance and also works as a field.

• Pre-commissioning and start up electrical power, instrumentation, transmitter, calibration transmitters, control valve, PLC logic control, Panel DCS, sequence control, process interlock, process control loop, ESD with highest safety and successfully.

• Pre-commissioning and start up process panel DCS, checked pipe line, inspection vessel, tower, Stud-bolts, gaskets, equipment, pumps, valves, pump tested run, compressor tested run, boxing up, water flushed, Hydro tested, air tested, Nitrogen bank, leak tested, start up process on Crude separation, Crude Distillation, Kero Distillation, LDO distillation, HDO distillation, HAGO Distillation, AR residues transfer, Crude furnace, Vacuum furnace, Vacuum Distillation, Fuel gas(C1-C2) Distillation, LPG Distillation(C3-C5), Amine Separation system, LSR Distillation, HSR Distillation, Asphalts, Fuel oil unite with highest safety and successfully.

• Saved Turbine Pump from misalignment.

• Saved LPG product loose to flare by safety valve passing.

• Distinguished the fire from AR Pump leakage and saved the plant from fire.

• Saved the plant from hot spot on the tube of the furnace.

• Start up plant well in the short time with highest safety and successfully.

BANGKOK POLY ETHYLENE CO.,LTD. October 1993 - October 1995

Plastic High density Plant ( HDPE )

Process Panel operator DCS

Take care and control DCS of the polymerization on the reactor, Hexane Recovery distillation.

• Pre-commissioning and start up electrical power, instrumentation, transmitter, calibration transmitters, control valve, PLC logic control, Panel DCS, sequence control, process interlock, process control loop, ESD with highest safety and successfully.

• Pre-commissioning and start up process panel DCS, checked pipe line, inspection vessel, tower, Stud-bolts, gaskets, equipment, pumps, valves, pump tested run, compressor tested run, boxing up, water flushed, Hydro tested, air tested, Nitrogen bank, leak tested, start up process on Polymerization reactor, Hexane recovery unite with highest safety and successfully.

• Repaired the mechanical pump, installing, checked and tested run.

• Distinguished the fire on the substation to save the plant from fire.

• Saved the cyclone pump damaged from loose the lube oil.

• Start up plant well in the short time and safety successfully.

THAI GCI Resitop CO.,LTD. April 1992 - October 1993

Plastic thermosetting plant

Process operator

Take care and control PLC panels on the polymerization, Grinding, Packing, Utility and maintenance.

• Pre-commissioning and start up electrical power, instrumentation, transmitter, calibration transmitters, control valve, PLC logic control, PLC panel, sequence control, process interlock, process control loop, ESD with highest safety and successfully.

• Pre-commissioning and start up process panel DCS, checked pipe line, inspection vessel, tower, Stud-bolts, gaskets, equipment, pumps, valves, pump tested run, compressor tested run, boxing up, water flushed, Hydro tested, air tested, Nitrogen bank, leak tested, start up process on Polymerization reactor, Grinding unite, Raw water unite, Boiler, Air compressor, Cooling tower unite with highest safety and successfully.

• Repaired the mechanical pump, installing, checked and tested run.

• Operated plant in a good condition successfully.

• Restart up plant from the emergency shut down successfully in the short time.

EDUCATION

Bachelor's degree of Electrical and instrumentation from Mahanakorn University of Technology.

TRAINING

• English Training.

• Fire fighting training.

• First aid training.

• Boiler training.

• Safety management training.

• Gas Alert training.

• Gas Detector training.

• MSA Detectors training.

• OE Process implement(operation & maintenance).

• Water treatment training.

• Energy saving training.

• Cost reduction training.

• Fire Watch training.

• Basic Rigging training.

• Sea survival & Offshore emergency procedures training.

• Helicopter underwater escape ( HUET ) training.

• Helicopter underwater escape training ( PASSENGER ).

• Tropical basic offshore safety induction and emergency training

• Mercury awareness training.

• Pump and valve training.

• Valve and Fitting training.

• Tube Fitting installation training.

• Safety and Work permit training.

• Furnace and Burner training.

• Fire truck training ( Operate equipment and driving ).

• Simulator DCS training.

• Process Distillation training.

• Gas turbine and steam turbine training.

• ISO-9002, ISO-14001, BS-8800 training.

• TBOSIT training.

TALENTS

Windows, Microsoft Excel, Microsoft word, Microsoft mail, Internet, Other.

PERSONAL

Date of Birth : August 24,1972 Health / Weight : 176 Cms / 72 Kgs.

Age : 41 Languages : English / Thai

Nationality : Thai Marital Status : Married



Contact this candidate