VASUKUMAR D. CHENNA
***** ******* ****, *******, ** 77065
********@******.****.***
Cell: 915-***-****
INDUSTRIAL ENGINEERING PROFILE
Experienced in working in the UAW environment
Proven success in reducing turnaround times and increasing
productivity through combined work steps, removing non-value
added tasks & improving cycle times
Increased productivity, quality and process through data
analysis, time studies, capacity studies and cycle time data
collection
Areas of Expertise
Standardized Work ~ Six Sigma Green Belt ~ Lean Manufacturing ~ Value Stream Mapping ~ 5S ~ SMED ~ Overall Equipment Efficiency ~ Man-Machine charts ~ Labor Scrolls ~ Line Balancing
PROFESSIONAL EXPERIENCE
Industrial Engineer October 2011 to June 2012
John Deere Davenport Works – Davenport, IA
•Established and implemented work instructions to reduce non
value added operations and to enhance safety in union work
environment
•Effectively used Teamcenter VisMockup & JT2Go to develop &
maintain operators method sheets for assembly process of ADT
line
•Analyzed methods to establish standardize workflow in
packaging of service parts
•Established standard times for all the kitting operations in
assembly and packaging of tractors service parts
•Developed work standards for assembly & sub assembly
processes by performing time and motion studies using stop
watch and predetermined time study software
•Effectively used SAP ERP application to read BOM, to update
and assign parts in standards sheet and to create material
routing according to production plan
Industrial Engineering co-op June 2011 to October 2011
United Solar Ovonic – Auburn Hills, MI
•Coordinated cycle time data gathering, compilation &
analysis procedures
•Analyzed the processes to breakdown work elements for quick
changeover, cycle time reduction & implement automation
•Implemented 5S in the product development area
•Performed time studies and provided recommendations to
eliminate bottlenecks
•Performed field checks to update the plant layout using
AutoCAD
•Successfully implemented SMED technique on the production
line to cut down the turnaround time by 52%
•Took the initiative to research about the resistance welding
equipment to further expedite the design changes essential
for process improvement
•Increased the line efficiency by 60% by implementing lean
methods to reduce the cycle time
•Developed & implemented the standard work process on the
cell line
•Eliminated the operator lag time by ergonomic rearrangement
of workstation enhancing safety and continuous workflow
•Developed a technological tracking tool to facilitate the
communication between cross-functional teams with upper
management
Maintenance Rep February 2011 to June 2011
Cardinal Health, Inc. – El Paso, TX
•Assisted with custom drape (CD) healthcare product lines by
analyzing customer orders generated by ERP system
•Generated weekly production planning for the healthcare CD
products
•Generated purchase orders & prepared MSDS for the chemicals
used on the facility
•Planning, scheduling & delegating preventive maintenance
work orders to achieve operations quarterly goals
•Coordinated monthly pest control activities throughout the
facility
•Supervised all the maintenance activities in compliance with
Environmental, Health & Safety regulations
•Implemented a system to address customer queries thus
maintaining overall service level
•Trained and supervised contractors in the health-care
industry to ensure adherence to Environmental, Health &
Safety procedures
Inventory Auditor October 2010 to December 2010
Central Receiving Department, UTEP – El Paso, TX
•Calibrated Motorola MC3100 handheld mobile computer for bar
code scanning
•Coordinated the activities to document & track
incoming/outgoing inventory
•Administered wall-to-wall inventory audits by identifying
shortages, defective and erroneous equipment
•Evaluated the inventory reports highlighting the tag number,
price list & current location of the equipment along with the
master list of annual inventory
•Coordinate with various depts. on-campus for perpetual wall
-to-wall inventory check & regular follow-ups for the
missing/misplaced inventory
Graduate Research Assistant August 2008 to May 2010
Industrial, Manufacturing & Systems Engineering, University
of Texas at El Paso
•'Statistical Quality Control' (Spring 2009) and 'Production
and Inventory Control' (Fall 2009). Responsible for grading
homework, exams, mentoring students and giving recitation
lectures
•Conducted extensive research on various optimization methods
by modifying the algorithm to fit the specified problem
domain
•Assisted the Professor in conducting lab sessions and in
teaching problem solving methods using statistical software's
to the undergraduate students
Undergraduate Intern June 2006 to April 2007
Automatic Electric Ltd – Mumbai, India
•Reviewed current testing unit design model and recommended
the upgrade design model for testing unit
•Assisted in implementing 5S on the shop floor
•Updated weekly design developments using MS-Excel
spreadsheets and reported them to the supervisor
•Compiled detailed reports about projects undertaken &
reported them to the project advisor as a part of the
academic requirement
EDUCATION AND TRAINING
•The University of Texas at El Paso
Masters of Science, Industrial Engineering
Dec 2010 GPA 3.81/4.0
•University of Mumbai, India
Bachelor of Engineering, Instrumentation & Process Control
May 2007 GPA 3.60/4.0
•Completed 12 hrs training of ISO 9001:2008 Internal Auditor
Training conducted by Texas Manufacturing Assistance Center