Post Job Free
Sign in

Mech/Piping design

Location:
Melbourne, VIC, 3095, Australia
Posted:
March 05, 2012

Contact this candidate

Resume:

Jose (Jo) Luis Sanz

** ********-********** **

Research 3095

Tel. (+61) 3 9437 2211 / Mob. 042*-***-***

Date of Birth: 21 Feb 1960

Citizenship: Australian & Spanish

EDUCATION

Victoria University

Diploma Mechanical & Manufacturing Engineering

COMPUTER SKILLS

Visual Basic AutoCAD 2012 Microstation 95 Intergraph

Autolisp MS Word MS Project MS Access

Mulisp MS Excel MS Outlook PC Repairs

Web Design MS Frontpage Inventor Win 7 64

3D Studio NT 4.0 HTML PDS Piping Design

PDS Equipment Modelling PDS Review Mechq 3D Plant (Autodesk)

EMPLOYMENT

Design Coordinator (Manager/Dir.)

NRKee Designs (AUSTRALIA)

Melbourne Office

Design Group Jan 12 – Current

Design and Construction supervision of FPSO Stena Caribbean for ASL/BC Petroleum Sdn Bhd

Consultant assistance

Design Drafting staff supervision

Project management support and scheduling

Construction support and site supervision (Singapore Based)

Design Coordinator (Manager)

AGR Asia Pacific (AUSTRALIA)

Melbourne Office

Design Group Apr 06 – Feb 12

Mechanical/Piping engineering Support to onshore & offshore groups,

Project Design and Drafting Control/Review/Assessment and coordination of Drafting staff, Drafting group staff selection and performance review, Cad systems evaluation and purchase, Set up of cad systems for all disciplines.

Project presentation, development of Engineering standards, Development of CAD/Drafting Standards. Development of drafting project costing and control.

Project lead design for CO2 injection, FPSO field review and design, FPSO identification of tie-in points, Sub Sea field development design, subsea flow lines and equipment design and 3D development of subsea fields. Onshore plant and equipment layouts/development.

FPSO conversion project development from existing tanker (Front Puffin) (Crystal Ocean).

Development of Subsea Design procedures, Drafting requirements and drafting standards.

Development of Subsea installations, Subsea to shore pipelines, onshore facilities.

Project management support and scheduling.

Construction support and site supervision.

Development of Autodesk 3D Plant software with Autodesk.

Mechanical/Piping Engineer/Project Engineer

WorleyParsons (IRAQ)

US Department Of Defence

Iraqi Oil Northern Sector Upgrade Jan 05 – Feb 06

Site Mechanical/Piping engineering Support to construction group, preparation of work packs, evaluation of equipment requirements, Preparation of Purchase Orders, evaluation of vendor’s bids, acceptance of Vendor bids, site inspections to determine damage and re-instatement of Oil process plants, Mechanical installation supervision and control of works, Development of punch lists, review of contractor comments, progress reporting, plant safety and operability assessment, QA/QC documentation review and development of standards, Develop Pipeline Data and pipeline WT/test press, material selection and material substitution, Preparation of Hot tap procedures and supervision of site staff to complete Hot Taps, reassessment of piping and procedures due to insurgents damaging completed works. Project scheduling and Management of construction and design staff on site and remote offices, Project proposals and execution, Materials and Project cost control and reporting, development of tie-in schedules, scope of work and subcontractor liaison/re-training.

Mechanical/Piping Engineer

Worley ABB JV. (Australia)

Origin Energy

Bassgas Development Lang Lang Oct 04 – Dec 04

Site inspection of Piping and Mechanical installation work, Development of punch lists, review of contractor comments, Non-conformance reporting, plant safety and operability assessment, QA/QC documentation control.

Lead Designer

Worley ABB JV. (Australia)

Santos

Casino Development Sept 04 – Oct 04

Lead Mechanical/Piping Designer. Site checking and review of design with project Engineers, Development of proposals, Design of piping layout, materials control, Drafting support, generate line list, Tie-in schedules, special piping items list, Create/review & check isometrics, construction reviews, Produce Construction documentation.

Field Engineer

ETRS. (Engineering Testing and Research Services Australia)

ESSO Long Island Point /Longford/Off Shore Installations Nov-03 – Present

Involved in Field Checking of piping systems onshore and offshore, Field inspection of testing requirements, Preparation of field sketching, liaison with client and Fabricators, QA/QC control, Design and Development of Maintenance projects.

Materials/Procurement Engineer

J.P. Kenny. (Australia)

Phu My – Ho Chi Minh Gas Distribution Apr-03 – Nov-03

Development of Procurement Documentation, preparing procurement Philosophies, Materials Design reviews, Preparation of purchase orders, planning and co-ordination of materials supply, Cost assessment and budget costing and estimating, Engineering support for Discipline Engineers, Piping Specification development, liaison with client, materials selection, Progress reporting to PM and Client, QA/QC control for projects, Contracts Review.

Senior Designer

ETRS. (Australia)

ESSO Long Island Point Feb-03 – Apr 03

Involved in Field Checking of piping systems onshore and offshore, Field inspection of testing requirements, Preparation of field sketching, liaison with client, QA/QC control.

Senior Construction Engineer

Worley ABB JV. (Australia)

ESSO Longford Feb-02 – Dec-02

Involved in Project Design/Construction reviews for onshore projects, Construction/Fabrication planning and co-ordination between site and Fab shops, Engineering support for Construction Supervisors, liaison between construction and client shutdown requirements, critical lift planning and documentation, materials selection and substitution, Hot Tap engineering support and review, Safety reviews, preparation and approval of installation procedures, Project progress reporting to PM and Client, Non-conformance reporting, Field modifications and redesign, Commissioning of Piping/Instrumentation systems and Equipment, Modifications to commissioning procedures, Arrangement/participation of client/construction meetings, QA/QC control for projects,

Lead Designer

Worley ABB JV. (Australia)

ESSO Longford Pressure/Safety valve upgrade Dec 01 – Feb-02

Lead Piping Designer/Checker. Checking of third party documentation and review/re-design to suit current ESSO/Worley-ABB construction standards, additional design of piping systems Including hot tapping detailing and site review of location for suitability, Support selection, preparation of construction documentation.

ESSO Longford Molecular Sieves Upgrade Sep 01- Dec 01

Lead Mechanical/Piping Designer. Site checking and review of design with project Engineers and client Engineers, Development of proposals, Design of piping layout, materials control, Drafting support, generate line list, Tie-in schedules, special piping items list, review/check isometrics, construction reviews, Hazop review assistance, Produce Construction documentation, Construction field assistance.

ESSO Longford Lean Oil Project / Flare upgrade Mar 01- Sep 01

Piping Designer. Fab shop supervision of pipe spooling, delivery control and materials control, Assessing field welds requirement for site installation and transportation. Clarifying PDS Isometrics to Fab Shop staff and supervisors. Assisting in spooling priorities by Construction/Installation Engineers, Develop Weld procedures documentation, Sourcing of materials and material substitution.

ESSO Longford MDEA Regen. Gas Column Jan 01- Mar 01

Lead Piping Designer. Design new replacement Column to current ESSO design Spec’s.. Review of tray details from third party vendor and checking of drawings. Site survey information to match existing equipment, Project document control and Draftsman instructions to complete documentation required for construction and installation, Review and instructions for generating installation animated model.

ESSO Longford Fire main upgrade Jun 00- Dec 00

Designer for Longford Gas Plant Fire main replacement Works.

Piping design/Site and installation support of Concrete line Piping system, Piping Modifications Due to Unknown underground obstructions, Re-routing of piping to suit equipment location.

Design Engineer (Mechanical)

John Dohrmann and Partners (Australia)

Cabot Australasia Dryer Relocation Oct 99- May 00

Client Project review. Liaison with client project manager. Site inspection. Process Development and Hazop Review. Design of high temp. piping systems, Design of pipe supports. Design of Expansion bellows. Restraining of Mechanical Equipment. Hydrocarbon Storage Tank Inspection, installation of new nozzles. Project progress reporting. Purchase orders and enquiries. Preparation of tender documents. Review of Clients Valve specifications. Review of tenders and reply to tenders enquiries. Shutdown procedures. Site supervision of contractors. Supervision of designers Mech., Structural, Civil and Instrumentation. Site checking and Construction Supervision.

Lead Designer

Worley ABB JV. (Australia)

ESSO Longford General Maint. Works Aug 99- Oct 99

Lead Project Designer for Longford Gas Plant Maint. Works.

Piping/Mechanical design staff control and supervision, Mechanical Design, Piping Design, Client Liaison, Process Development, Hazop participation, document control, progress reporting and design group meetings participation. Site Inspections and data retrieval.

Construction Engineer

Worley ABB JV. (Australia)

Texas Utilities underground Gas Storage Feb 99- Aug 99

Supervision of fabrication workshop. Responsible to construction site manager, assign work orders. Resolve engineering issues to comply with relevant Australian or Client standards. Inspection of completed work, Rework of documentation for economic fabrication, Work scheduling, Co-ordination of 3 Fabrication Workshops.

Piping Designer

Worley ABB JV. (Australia)

ESSO Longford Reestablishment Sep 98- Feb 99

Site inspection and design of temp. piping systems, Site sketches and checking of by-pass piping systems.

Construction liaison, PDS design, PDS review terminal.

Lead Piping/Mech. Designer

Worley ABB JV. (Australia)

ESSO Longford fire main upgrade Feb 98 –Sep 98

Lead Project Designer for Fire main upgrade.

Piping/Mechanical design staff control and supervision, Mechanical Design, Piping Design, Client Liaison, Process Development, Hazop participation, document control, PDS Designers control and development of background documents, Progress reporting and design group meetings participation.

Chief Designer

John Dohrmann and Partners P/L (Australia)

CABOT Apr 95 –Feb 98

Drawing office/Project Coordinator for Wet Process upgrade.

Piping/Mechanical design staff control and supervision, Mechanical Design, Piping Design, Client/contractor Liaison.

Development of CAD Standards.

Albright and Wilson Apr 95 –Feb 98

Drawing office/Project Coordinator for ventilation/piping upgrade.

Mechanical Design, Client Liaison, site plan development.

PTC May 97 – Feb 98

Upgrade of plant air to Carriage refitting factory, piping layouts and details.

Site checks.

BASF Dec. 93 - Mar. 96

Drawing office/Project Coordinator for BASF Major upgrade.

Piping/Mechanical design staff control and supervision.

Process development and design.

Liaison with Client, Contractors and Suppliers.

Control of documents, Checking drawings and equipment data sheets.

Construction control and Supervision.

ANM Jan. 94 - Feb. 95

Development of 2 chemical dosing skids, Skid layouts, P&ID development, client liaison, site checks, equipment sourcing, commissioning of skids.

BASF Mar. 93 - Dec. 93

Set-up drawing office Standards and procedures.

As Built P&ID for entire plant.

Create drawing and equipment numbering system and database to store information on equipment.

Piping/Mechanical Design office Manager Mar. 91 - Feb. 93

Global Engineering V.B. (The Netherlands)

Shell Gabon, West Africa (Rabi Oil Field development)

Piping layouts, Isometrics, Tie-in schedules/details, P&ID development, Piping support details and calculations, construction packages, review of third party construction packages, development of standard oil well hookup, oil field development and upgrade, oil well platform review, flow line layouts, gathering station upgrades and maintenance, platform design, standard pipe support development, cad & engineering software evaluation, Materials sourcing, construction support and supervision, as-built field documentation, checking of construction packages prior to issue, liaison with contractors and local staff.

On site development of standard construction packages and advise.

Piping/Vessel Designer Sep. 90 - Jan. 91

Lummus Heat Transfer V.B. (The Netherlands)

Saedelmi/Baharain & Singapore Power Stations, Danish Power Facilities

Piping layouts, Isometrics, Tie-in schedules/details, P&ID development, Piping support details and calculations, Vessel design and configuration, Ducting design and calc., Site inspections.

AutoCAD Development.

Piping Designer Jan. 90 - Sep. 90

Fluor Daniel P/L (Australia)

Shell Corio (Geelong) upgrade

Piping layouts, Isometrics, Tie-in schedules/details, P&ID development, Steam tracing details, Piping support details, Site inspections.

Lead Piping Designer Sep. 89 - Dec. 89

John Dohrmann and Partners P/L (Australia)

PRA (Mobil) Heater upgrade

Piping and Instrumentation design, supervision of drafting/design team, procedures for contract, procedures for demolition and removal of asbestos insulated piping.

Gas piping design, Modification to burners.

Piping Designer Apr. 89 - Sep. 89

Sheddon Pacific P/L (Australia)

ESSO

Piping Layouts, P&ID development, offshore skid design, details of fire system piping and Isometrics, module design.

Development of AutoCAD and Evaluation of Third Party Piping software.

DUNLOP/GOODYEAR

Mechanical development of Nitrogen purging mobile skids, fire hydrant/sprinklers design and drawing.

Instrumentation/Piping Designer Nov. 87 – Apr.89

Fluor Daniel Aust. P/L (Australia)

P.R.A. (Mobil) Blending Area Automation Upgrade

Cad development, Piping Layouts, Isometrics, Pipe supports, Site checking, as-built P&ID, details of tanks and mechanical equipment.

Development of automated loop generation programme with database IV link to instrument index for data extraction, cabinet site checks, cabinet details, PLC loading schedules, Cable Schedules, TDC 3000 card selection and config.

Extensive use of AutoCAD.

B.P. KWINANA Upgrade (W.A.)

Development of Loop diagrams, Cable connection schedules, Instrument location layouts, cable rack info. and details, Cabinet drawings.

Extensive use of AutoCAD.

Piping/Mechanical Designer Aug. 86 - Nov. 87

Department of Defence (Australia)

Relocation and upgrade of explosives Manufacturing plant.

Piping/Vessel design (including Corning Glass modules and titanium piping systems)

site layouts, piping layouts, P&ID development, Isometrics, Site inspections, Development of CAD Software (Micro station/Intergraph).

Fitter and Turner Mar. 84 -Dec. 86

Sagasi Engineering P/L (Australia)

Management assistance of Family business .

Cost estimating of jobs, general Machining, N/C Programming and day to day running of factory and personnel.

REFEREES

Paul Dohrmann Engineering Manager Worley ABB 300 Flinders St. Melb 3000

Canada Ph. 03-9205 0500

Garry Smith Project Manager Worley ABB 300 Flinders St. Melb 3000

Ph. 03-9205 0500

Warren Lewis Platform Manager ESSO South Bank. Melb. 3000

Ph. 03-9270 3333

Bill Young Project Manager



Contact this candidate