MADHUSUDAN BANIK
Position hold : SR.SURVEY ENGINEER
Date of Birth : 25th May 1985
Nationality : Indian
Height :175 cm
Weight : 78 KG
Passport No. : G9015240
Ph no. : +918*********(A.P)
Email- :
b6dqfe@r.postjobfree.com,b6dqfe@r.postjobfree.com
Marital status : single
INSTRUMENTS HANDLED:-
i) Global Positioning System GPS- 1200(LEICA,
SOKIA,TRIMBLE)
ii) Total Station Leica TC1202+ & TCR1205.
iii) Pentax Electronic Total Station R300.
iv) Sokkia Electronic total station SET-6 &SET-
2130R
v) TOPCON-750(Total station)
vi) Nikon(total station)
vii) Auto level of Leica, Sokkia & Topcon.
viii) Scanner-leicaHDS3000
ix) Theodolite(1sec & 20 sec)
x) EDM(electronic distance measurement)
xi) BRUNTON COMPASS &CHAINS
xii) PLANIMETER to measure area on D.W.G
COMPUTER LITERACY :- I. DOWNLOADING,PROCESSING & PLOTTING DATA USING TOTAL
STATION SOFTWARES LIKES Leica Geo-office, Prolink etc.
II. PROCESSING
& PLOTTING DATA USING AutoCAD
III. AutoCAD2007
IV. 12d
model(for contour & volume calculation)
V. Civil 3D
2011(for contour & volume calculation)
VI. Auto lisp
VII. MICROSOFT
WORD & EXCEL.
EDUCATION:--
Diploma in Survey Engineering, (3 years course) From W. B. Survey
Institution under State Council for Engineering and Technical Education,
India, in 2008
For your kind information this is the only Survey Diploma institution(GOVT)
in all over India pioneering in Survey Education and intensive practical
training.
EXPERIENCE:--
OVER FIVE YEARS (IN GULF-TWO YEARS & IN INDIA-THREE YEARS)
I.MAY12 TO PRESENT:- GAMMON INDIA L.T.D(ANDHRA PRADESH,WARANGAL,
GHANPUR,CHELPUR(506168)
POSITION:-SR.SURVEY ENGINEER
PROJECT NAME:-KAKATIYA THERMAL POWER PROJECT(N.D.C.T-II)
DUTIES & RESPONSIBILITY:- Responsible for all survey work pertaining to
site development plan such as:- .In-charge with the use of the major survey
instrument utilized in the field ..Establishment of horizontal and vertical
control points for fixed reference using GPS & Topcon total station
..Conduct topographic survey ..Profile and cross sectioning of areas
covered by site construction area to determine portion to be cut or fill
for preparation of monthly progress accomplishment for monthly progress
billing. .Lay-out and as-built all structure facilities based on designed
plan such as: Raft, pedestal & Raker column, portable water pipe line,
drainage pipe line and other underground facilities. .Lay-out and setting
out of vertical and horizontal alignment of concrete Raker column & shell.
.Download, edit and process of data using leica geo-office, prolink,
AutoCAD civil 3d(for contour & volume),12d model(for contour & volume)
etc...Processing and plotting of data using AutoCAD
II. Dec 09 to Dec -11 EMIRATES SURVEY ENGINEERING SURVICES L.L.C
(RAS AL KHAIMAH,U.A.E)
POSITION: SR.SURVEYOR
PROJECT NAME: AL MARJAN ISLAND DEVELOPMENT (UAE).
Project Description:-
Scope of works covers the construction of 10 kms(circular-double way) in al
marjan island. with carriageway of 6.70 mtrs. and 2.50 mtrs. shoulder. PCC
pavement including preparation of sub grade, sub base, crushed aggregate,
and bituminous stabilized base course. Construction of side ditch
rectangular section, CHB wall with concrete canal bottom. Construction of
subsurface drain, filter materials with perforated pipe, 0.15 m diameter.
Construction of stonemasonry catch wall and road realignment at one
section, concrete asphalt overlay of 10 kms., including prime, bituminous
tack coat and asphalt cement wearing and binder course etc..
DUTIES & RESPONSIBILITY:- Responsible for all survey work pertaining to
site development plan such as:- .In-charge with the use of the major survey
instrument utilized in the field ..Establishment of horizontal and vertical
control points for fixed reference using necessary survey instruments
..Conduct topographic survey ..Profile and cross sectioning of areas
covered by site construction area to determine portion to be cut or fill
for preparation of monthly progress .
Providing data for monthly progress reports in connection with contractors
claim for payment. .Assist in checking/plotting the cross section for
as built drawings ..Perform verification survey ..Checking and settings out
of work requires.
SPATIALISATION AREA(U.A.E):-I.ROAD WORK:- (RECONAISANCE SURVEY,TRAVERSING
FOR REQUIRED CONTROL POINT FOR FUTURE WORK, ALIGNMENT &CHAINAGE MARKING OF
THE CORRIDORE, LEVEL MARKING OF THE ON THE STEEL AT THE 10M INTERVAL(SUCH
AS-FINISH ROAD LEVEL),CUTTING FILLING & LEVEL WORK BY GRADER TO REACH
REQUIRED GROUND LEVEL,WATERING & COMPACTION WORK, CHECKING THE REQUIRED R.L
CHAINAGE TO CHAINAGE TO THE CLIENT,ALIGNMENT MARKING OF CURVE-STONE ON THE
ROAD BASE FOR P.C.C, ALIGNMENT MARKING OF CURVE-STONE ON THE P.C.C,GIVE
THE CURVE-STONE TOP LEVEL TO FIX THE CURVE-STONE,PUTTING THE SUB-BASE,BASE
CAURSE,BITUMEN ACCORDING TO THE LEVEL & COMPACTION CHECKING,MARKING THE
ALIGNMENT OF CORRIDORE OF THE ROAD, FIXING THE BOLT & CHECK THE VERTICALITY
OF LIGHT POST etc.
II. PIPE LINE WORK(U.A.E) :- RECONAISANCE SURVEY,TRAVERSING FOR REQUIRED
CONTROL POINT FOR FUTURE WORK,ALIGNMENT &CHAINAGE & LEVEL MARKING,EXCAVATION WORK,CHECKING THE BEDDING AS PER REQUIRED COORDINATES & LEVELS
CHAINGE TO CHAINAGE,TAKING CROWN LEVEL & COORDINATES ACCORDING TO THE
CHAINAGE,MARKING THE LEVEL & COORDINATES BESIDES THE PIPE ON THE STEEL FOR
REQUIRED BACK FILLING, CHECKING BACK FILLING TO THE CLINT AS PER REQUIRED
STEP TO STEP etc.
III. OTHER WORKS(U.A.E):- TOPOGRAPHY SURVEY(RAMS HILLY AREA,HATTA OMAN
CITY,ALAIN HILLY AREA-UAE),TRAVESING TO FIX CONTROLL POINTS(AL-MARJAN
ISLAND-U.A.E),ALIGNMENT FIXING OF ROADS & PIPE LINES,DIFFERENT TYPES OF
EXCAVATION WORK,LAYOUT OF MECHANICAL WORK AT RAK FREE ZONE, PREPARATION OF
CONTOUR MAP & CALCULATE THE VOLUME WITH 12D MODEL & AUTOCAD CIVIL 3D,PREPARATION OF VARIOUS GENERAL DRAWINGS(ALIGNMENT FIXING,LONG-
SECTION,CROSS-SECTION & AS-BUILT DRAWINGS) AS PER CLIENT REQUIREMENT etc.
June 08 - Dec -09 GAMMON INDIA Ltd, New Delhi
POSITION:- JUNIOR ENGINEER SURVEY
PROJECT NAME:- WAZIRABAD BRIDGE PROJECT, NEW DELHI
Project Description:-
Scope of works covers the construction of SEVEN FLY OVER & SIGNATURE
BRIDGE(LAYOUT ONLY) at new Delhi. with carriageway and shoulder. PCC
pavement including preparation of sub grade, sub base, crushed aggregate,
and bituminous stabilized base course. Construction of side ditch
rectangular section, Construction of stonemasonry catch wall and road
realignment at one section, concrete asphalt overlay of including
prime, bituminous tack coat and asphalt cement wearing and binder course
etc..
DUTIES & RESPONSIBILITY:- Responsible for all survey work pertaining to
site development plan such as:- .In-charge with the use of the major survey
instrument utilized in the field ..Establishment of horizontal and vertical
control points for fixed reference using GPS & Topcon total station
..Conduct topographic survey ..Profile and cross sectioning of areas
covered by site construction area to determine portion to be cut or fill
for preparation of monthly progress accomplishment for monthly progress
billing. .Lay-out and as-built all structure facilities based on designed
plan such as:-open foundation of bridge pillar, segments of bridge in
casting yard etc..
SPATIALISATION AREA:- I.BRIDGE & ROADS:-(RECONAISANCE SURVEY,TRAVERSING
FOR REQUIRED CONTROL POINT FOR FUTURE WORK,LAYOUT MARKING OF FOOTING,
TAKING O.G.L GRIDEWISE,EXCAVATION WORK,P.C.C WORK,LAYOUT MARKING ON THE
P.C.C,LAYOUT MARKING ON THE STEEL CAGE(FOR OPEN FOUNDATION,CHECKING THE
COORDINATES TO THE CLINT,CONCRETING UPTO THE REQUIRED LEVEL,LAYOUT MARKING
ON THE FOOTING OF THE SHUTTER,CHECKING THE COORDINATES OF THE SHUTTER AT
THE TOP TO THE CLINT,CONCRETING OF THE PILLAR,ALIGNMENT OF THE SEGMENT
(PILLAR TO PILLAR) ACCORDING TO THE SUPPERELEVATION, CHECKING THE
COORDINATES & LEVEL OF THE SEGMENT TO THE CLIENT, CONCRETING,CURVE-STONE
WORK,LAYING ROAD BASE,SUB-BASE& BITUMEN, ACCORDING TO THE LEVEL &
COMPACTION TEST,FIXING THE ALIGMENT OF CORRIDORE etc.
JAN07 to june08 SUN SURVEY
Position: SURVEYOR
Project Name: RAIGANJ ROAD PROJECT
NATURE OF JOB PART TIME
DUTIES & RESPONSIBILITY:-
.TOPOGRAPHY SURVEY, TRAVERING(OPEN TRAVERSE),ALIGNMENT MARKING OF THE ROAD,
PIPE LINE WORK(PORTABLE WATER),LAYOUT MARKING OF
MANHOLE etc.
LANGUAGE KNOWN: - ENGLISH, HINDI, BENGALI, ARABIC etc.
REFERENCE:-
1.MR.BELIGH GUCHAIT 2.MR.KATHYANA(MANAGER-
GAMMON INDIA)
(SURVE MANAGER-E.S.E.S.LLC(UAE) (099********-ANDHRA PRADESH)
009***********-UAE)
CERTIFICATION:-
I, the undersigned, certify that to the best of my knowledge and belief,
these data correctly describe me, my qualifications, knowledges &
experiences.
(MADHUSUDAN BANIK) Date: 26.09.2012 Place:
(HYDERABAD)