Post Job Free
Sign in

Quality Engineer

Location:
Melbourne, FL, 32935
Salary:
65-75K Per Year
Posted:
April 18, 2010

Contact this candidate

Resume:

February **, ****

To: Human Resources Mgr.

Re: Engineering And Mfg Openings – Temporary Or Permanent

Good Morning:

After Close To 15 Years Of Being A Contract Engineer In A Variety Of

Assignments And Disciplines I Have Decided To Pursue Employment In The Melbourne /

Orlando / Vero Beach Area Of Florida Where I Now Make My Home.

I Am An Experienced Manufacturing, Industrial, And Facilities Engineer In A Variety

Of Disciplines Including Electronic Assembly, Machining, Sheet Metal, Aerospace, Rapid Transit

Vehicles, Automotive, Motorcycles And More.…Even An Artificial Heart Project . Also, I Am A

Certified ISO 9000 Auditor.

My Operations Mgr. Experience Includes (3) Electronic Mfg. Companies…(2) In

Rochester, NY And (1) In Largo, FL….Reporting To The Owner. I Also Have Management

Experience In Manufacturing Engineering And Engineering Model Shop

I Feel That My Manufacturing And Engineering Experience Will Be Of Great Value To

Your Company As You Will See By Reading My Attached Resume. I Hope To Have The Pleasure

Of Hearing From You.

Wayne Fish

1609 Derby Lane

Melbourne, FL 32935

321-***-****

WAYNE R. FISH 1609 Derby Lane

Melbourne, FL 32935

321-***-****

b6061v@r.postjobfree.com

OBJECTIVE: PERMANENT POSITION AS MANUFACTURING , INDUSTRIAL, PROCESS, PROJECT, QUALITY, OR FACILITIES ENGINEER.

In my over 25 year manufacturing career I have taken numerous products from design stage throughout production, including Value Analysis, Design Review and Equipment Specification, Justification, Purchase and Implementation. My Methods, Tooling, Process Development and Writing, Time Standards (including MTM, Work Factor, MOST, EASE and StopWatch Studies), and Facilities (including Equipment Selection and Plant Layout) background makes me a productivity specialist in the manufacturing environment…. for both high and low volume assembly.

I am knowledgeable in Automotive Assembly, Aerospace Engineering, Aircraft Mfg., Medical Products Manufacturing, Rapid Transit Vehicle Manufacturing, Military Manufacturing, Electronic and Mechanical Assembly, Machining, Sheet Metal Fabrication and Hydraulic Assembly with additional experience in Purchasing, Production Control, Quality Assurance, Customer Liaison and Design Drafting Functions. Also have ISO 9000 experience….including preparation of companies for audit and certification. Have management experience in Manufacturing, Manufacturing / Industrial Engineering , Model Shop , Production Machine Shop , and Cost Reduction.

EMPLOYMENT EXPERIENCE:

Manufacturing Process Engineer Sparton Electronics Corp.

November 1999 To November 2000 Jackson, MI / Brooksville,FL

June 2001 To September 2001

March 2003 To December 2003

April 2007 To March 2008

Assigned To New Product Intro. Group…Developed Process Instructions Using Cimbridge/Valor System ….Including Technical Support For Manufacture Of PWB & Unit Assemblies Per IPC-A-610 Standards… Included Tooling, Methods, Standards and Engineering Changes On Thru-Hole ,SMT and Unit Assembly Processes, Wire Harnessing, Bonding, and Conformal Coat.

(Sub-contracted by Oxford Corp. , Aerotek Corp., Aries Corp. , And Patriot Technical)

Manufacturing Project Engineer Eaton Aerospace Corp.

August 2006 To March 2007 Sarasota, FL

Tasked With Preparing Switch Assembly Area For Move To Tijuana, Mexico….Requiring Equipment And Process Analysis…Using Oracle…Of Approximately 2000 Switch Assemblies Being Manufactured In (5) Work Cells. Developed Shared Equipment Analysis….Revised And Updated Process Routings…..Completed Tooling Study To Locate And Assign Numbers To All Tooling. Developed Capital Equipment And Purchase Order Requirements For Tijuana Engineering Group On Replacement Equipment. Coordinated Training And Advised Engineer From Tijuana On Equipment, Processes And Anomalies Of The Assembly Of The Product(s). Coordinated With Crating And Freighting Vendors For Equipment Move.

(Sub-contracted by Advanced Resources Of St. Louis, MO)

Industrial Engineer McKesson Automation Systems

October 2002 To March 2003 Alexandria, LA

Assigned To Mfg Engineering Group Tasked With Introduction Of New Automated Pill Dispensing Systems Product To Assembly. Developed Process Instructions, Tooling Requirements, Product Design Modifications For Ease Of Mfg., and Facility Layout For Final And Sub Assembly Areas. Assisted In Development Of Final And Sub Assembly Areas Including Conveyor Systems, Power Tooling Material Flow And Presentation.

(Sub-contracted By Oxford Corp. Of Jupiter, FL)

Manufacturing Engineer Aerospace Interconnect Systems Inc.

November 2000 To June 2001 Titusville , FL

Developed Assembly Instructions For Manufacture Of Wire Harnesses And Cables For The Bradley Fighting Vehicle Using MS Office.

This Included Interpretation Of Customer And Military Specifications , Methods Analysis , Required Tooling , Harness Board Design , Bill Of Material Development , And Technical Liason With The Customer.

(Sub-contracted by ProtoSpec Associates Of Melbourne, FL)

Industrial Engineer Aerostructures Corp.

July 1999 To October 1999 Nashville, TN

Developed productivity studies on Gemcor NC Drivmatic Drill And Riveting Machines to manufacture aircraft panels for

customers such as Gulfstream, Cessna, and Airbus. Determined percentages of downtime, run time, non-\productive time, etc.

Made recommendations for changes in equipment design, tooling, support personnel, operator duties definition, etc.

(Sub-contracted by Volt Technical Of Marietta, GA)

EMPLOYMENT EXPERIENCE: -2- Wayne R. Fish

Industrial Engineer Crestview Aerospace Corp.

January 1999 To May Of 1999 Crestview , FL

Assigned to evaluate , recommend , and implement changes in methods, procedures, employee supervision, and equipment for existing

Manufacturing Group to assemble. fabricate, machine, hydroform, heat treat, and paint sheet metal parts for aircraft customers. Also

assigned to develop and implement production layout in new building. Reported to Director Of Manufacturing.

(Sub-contracted by Advanced R & D of Pensacola , FL)

Project Engineer American Quantum Cycles

February 1998 to October 1998 Melbourne, FL

Assigned to setup final assembly area for motorcycle manufacturing. Developed and documented production build process -including tooling - being used by mfg. group. Applied time standards for line balance using EASE Industrial Engineering System and developed a conveyor system concept with cost estimates. An overall building modification and upgrade plan was conceived which consisted of establishing truck docks, door openings, air conditioning, electric power, shop air, painting, insulating, floor refinish., etc.

(Sub-contracted by Interim Personnel of Melbourne, FL)

Operations Manager National Communications Electronics

August 1997 to January 1998 Largo, FL

Directed total manufacturing efforts of over 40 employees in Assembly, Machine shop, Manufacturing Engineering, Production Control, Production Test, Purchasing and Stockroom functions for electronic SMT manufacturing. Established a manufacturing control system for scheduling, manpower requirements, open orders, job costing, etc. Upgraded personnel, reduced scrap and rework, improved workflow and efficiency. Reported directly to President.

Manufacturing Engineer Harley-Davidson Corporation

September 1996 to August 1997 Kansas City, MO

Part of team assigned to develop assembly process for manufacture of XL model motorcycle at new manufacturing facility. Responsibilities included development of assembly process, standards and line balancing data using computerized EASE (Engineering Assembly Standards & Estimates) System, work place layout, equipment and tooling selection, material presentation and logistics, conveyorized system requirements, ISO 9000 recommendations, and ergonomic and safety considerations.

(Sub-contracted by Techstaff of Milwaukee, WI)

Manufacturing Engineer 3M Healthcare Company

August 1995 to August 1996 Ann Arbor, MI

Responsible for development and implementation of a Manufacturing Plan capable of producing “Total Artificial Heart Units” to specifications developed during design process. This included giving manufacturability input to the design team, developing all manufacturing specifications and procedures, development of equipment, tooling and facilities used during fabrication. Trained all manufacturing personnel. Ensured that all manufacturing processes were fully developed and validated. Part of team assigned to qualify vendors. (Sub-contracted by Manpower Technical of Ann Arbor, Michigan

Material Handling Engineer General Motors Corporation

April 1995 to August 1995 Lordstown, OH

Assigned to Manufacturing Engineering Group tasked with resolving material handling problems with existing equipment in Body Shop. Preformed analysis on Rack Handling Machines taking into account equipment design, required maintenance effort, cycle time requirements, sequence analysis, downtime evaluation, predicted long term reliability and compatibility with Lordstown environment. Presented findings to management – recommended replacement of (10) units. As part of (2) man team… a bid specification package was developed, vendors were solicited for bids, vendor finalist were visited and the selected vendor was awarded a contract.

(Sub-contracted by TRS of Marlton, New Jersey)

Industrial Engineer Johnson Controls Incorporated

January 1995 to April 1995 Ann Arbor, MI

Provided Industrial Engineering expertise for manufacture of Automotive Power Seat Frame Assemblies for Ford and Chrysler. Included methods, tooling, standards, processes and line balancing. Implemented material handling and assembly line equipment modifications and improvements for increased efficiency.

(Sub-contracted by Manpower Technical of Ann Arbor, Michigan)

Quality Assurance Engineer General Electric Transportation Systems

March 1994 to December 1994 Erie, PA

Attended BSI International Training Course and successfully passed Lead Assessor Exam for ISO 9000. Performed internal audits as part of auditor/assessor team to ensure compliance to quality system based on ANSI/ASQC STD Q91 – Prior to initial third party audit for ISO certification. Responsible for auditing all electronic control units manufacturing, machine shop, PCB assembly, and meetings with business leaders and technical staff for each of areas audited. (Sub-contracted by CDI Corp. of Erie, PA.)

-3-

EMPLOYMENT EXPERIENCE: Wayne R. Fish

Manufacturing Engineer Morrison – Knudsen Corp.

September 1993 to March of 1994 Hornell , NY

Developed methods, tooling, process instructions, and time standards for manufacture of Rapid Transit Vehicles on Bay Area Rapid

Transit (BART) project. Teamed with design engineering and production personnel on mechanical assembly and wire/cable

Development and installation plans… for initial production units. All efforts geared to follow-on production effort in Pittsburg, CA.

(Sub-contracted by Tech-Aid of Rochester , NY)

Manufacturing Engineer Lockheed-Martin Company

January 1993 to September 1993 East Windsor, NJ

Provided Quality Engineering technical support for manufacture of commercial and military spacecraft – including computerized corrective action for rejected items…rework, MRB, use as is, scrap, etc. Member of ODC Elimination Committee for Hazardous Materials. Liaison with production, manufacturing engineering, design engineering and production management for product quality and delivery to schedule. Member of New Product Identification Team. Prepared and gave quality status presentations to management group.(Sub-contracted by Aerotek Engineering of Wayne, PA.)

Manufacturing Engineer AMP Corporation

June 1992 to December 1992 Harrisburg, PA

Provided engineering floor support on semi-automated cable assembly line(s)…including methods, tooling, equipment maintenance and line balancing. Interfaced with production supervision, quality assurance, design/automation engineering, maintenance and new equipment installation groups. Set-up spare parts program for equipment and min./max. requirements. Involved with start-up effort for (3) assembly lines.

(Sub-contracted by Byrnes Group of York, PA

Manufacturing Project Engineer ABB Traction Corporation

December 1991 to June 1992 Elmira Heights, NY

Developed facility layouts of production, test and warehousing for rapid transit vehicle manufacturer. Layouts were based on methods improvement studies, tooling requirements, operation sequences, material flow, equipment requirements, and facility requirements and future plans for the facilities. Heavy interface with production, production supervision, material control, manufacturing engineering, safety engineering, purchasing and maintenance groups. Also assigned as facility move coordinator with purchase order “sign-off” for products.

(Sub-contracted by CDI Corp. of King of Prussia, PA.)

Facilities Project Engineer Saturn Electronics Corporation

September 1991 to December 1991 Rochester Hills, MI

Set-up production facility to manufacture PCB modules for military customers. Developed equipment requirements and specifications based on proposed production capabilities in ESD protective mode. Designed production layout based on workflow, available floor space, and equipment and production requirements. Assisted in development of project budget. Acted as purchasing contractor for electrical, plumbing, carpentry, ventilation and ducting, telephone, etc. Responsible for directing total effort. Reported to VP of Military Operations. (Sub-contracted by ProtoSpec Associates of Canandaigua, NY)

Prior To September 1991: Worked Contract Positions As Mfg/Industrial/Facilities Engineer. Also, Worked Permanent Positions As Mfg Engineer, Facilities Engineer, Mgr Of Mfg Engineering, Mgr Of Manufacturing And Operations Mgr.

EDUCATION: Xerox Corp. Courses: MTM II, MTM III, Xerography and Hard Metric Standards

Seminars: Wave Soldering, Building Std. Data, Basic Vacuum Technology, Work Simplification, MOST, Work Factor

Broome Technical Community College: Math – Science Major

Business and Technology Center (KC, MO): Autocad Release 12

REFERENCES:

Name/Home No. Title/Company/Work No. Name/Home No. Title/Company/Work No.

Mr. Mel Staudmyer Staudmyer Associates Mr. Mel Steele Contract Engineer

941-***-**** Punta Gorda, FL 817-***-**** Melbourne, FL

Mr. Pat Gibbons Mfg. Engineering Mgr. Mr. Thurman Bates Mfg Engineer – Eaton Corp.

856-***-**** Bombardier – Camden,NJ 662-***-**** Sarasota, FL



Contact this candidate