Post Job Free
Sign in

Project Fiber Optic

Location:
Udupi, KA, 574106, India
Salary:
1500USD
Posted:
September 26, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

MUHAMMED FAIZAL

S/o M.K. Abdul Kadar

Post Kaup, Udupi District,

Karnataka, India. 574106

Mobile : +919*********

E-mail : ***********@*****.***

OBJECTIVE:

To seek a job in an organization that helps me to utilize my technical skills to maximum extent, to give the best to the organization.

TECHNICAL QUALIFICATION

Three years Diploma in ELECTRONICS AND TELECOMMUNICATION ENGINEERING.

OVERALL EXPERIENCE: 05 YEARS

1. Organization : Oriental Management Services.

A leading Afghan company, It handles most of the telecommunication projects of U.S. Army, NATO and ISAF.

Designation : Telecommunication Installation Team Lead.

Duration : From October 2011 to June 2012.

Client : CSC (BPA#22 OSP Project, FOB Sharana)

Out Side Plant & Area Distribution Node installation

Co-operating with Civil Contractor for digging, Trenching to install Manholes,Handholes and conduits as per the Engineering Design plan(EDP).

Installation of Manhole Racking, Telecommunication Grounding & Bonding.

Layout of Maxcell, Fiber Optic and Copper cables through Manholes and Handholes according to the plan drawing.

Preparation, Splicing, Terminations and testing of Fiber Optic/Copper Cables using Proper Splicing and Test equipements.

Co-operating with Prime contractor and also with QA/QC team for mandrell tests and inspections.

Installation of Area Distribution Nodes with all cabinet setup and internal grounding.

Area Distribution Node ground ring installations with cadwelding.

Co Operating with QA/QC Government representative for Final inspection.

2. Organization : CONDOR TECHNOLGY WLL BAHRAIN

A leading Bahrain Telecommunication company, having branches in multinationals, It handles most of the telecommunication projects of U.S. Army, NATO and ISAF

Designation : Telecommunication Installation Team Lead.

Duration : From April 2010 to October 2011

A) AFGHANISTAN PROJECT :

Client : CSC (JOC ISP Project, Camp Phoenix)

USIDC (48th BCT ISP Project, Camp Phoenix)

TRIBALCO (ISAF HQ Compound Communication ISP Project, Kabul)

NORTHERN GRUMMAN(TCF Project, Camp Phoenix)

CSC (BPA#20 OSP Project, FOB Shank)

1) Inside Plant

Cable ladders, trays,baskets and panduit installations according to the plan drawing.

Layout of different network cables like SIPPR, NIPPR, CENTRIX, ISAF, NATO, DARK NET and DSN using UTP, STP & Zip core fiber cables, according to the plan drawing.

Termination of DSN cables using wall mounted 110 blocks and other network cables in proper cabinet patch panels using T568A & T568B standards.

Wire management of communication cables(CAT6A, CAT6, CAT5e, CAT5) in patch panel racks.

Termination of faceplate jacks T568A, T568B, RJ45 & RJ11 at destination end.

Termination of fiber optic zip core cables using connectors in both ends by using proper termination kit(UNICAM) .

Testing of communication cables using cable test equipement DTX-1800.

Telecommunication Grounding& Bonding for Cabinets, Ladders, Trays, Sleeves and equipement groundings.

Co-operating with prime Contractor and also QA/QC team for final inspection.

2) Outside Plant

Co-operating with Civil Contractor for digging, Trenching to install Manholes,Handholes and conduits as per the Engineering Design plan(EDP).

Installation of Manhole Racking, Telecommunication Grounding & Bonding.

Layout of Maxcell, Fiber Optic and Copper cables through Manholes and Handholes according to the plan drawing.

Preparation, Splicing, Terminations and testing of Fiber Optic/Copper Cables using Proper Splicing and Test equipements.

Co-operating with Prime contractor and also with QA/QC team for final inspection.

2. Organization : PRIME PROJECTS INTERNATIONAL LLC (PPI) DUBAI

A leading British construction and maintainance company, having branches in multinationals. It handles most of the constructions & maintainance projects of U.S. Army.

Designation : Fiber Optic/Copper Technician.

Duration : From October 2008 to October 2009.

Client : US Army (Bagram, Afghanistan)

Perini Management Services(Baghdad, Iraq)

A) AFGHANISTAN(BAGRAM) PROJECT :

Client : U.S.Army (Prison Construction Project)

1) Fiber Optic/Copper Cable

Layout of Fiber Optic/Copper cable through Manholes and Hanholes according to the plan drawing.

Preparing Fiber/Copper cable for splicing.

Splice the Fiber Optic Cable using Splicing machine(Fujikura60s) and dressing of Fiber cores in splice trays.

Splice the Copper Cables using 3M splicing kit.

Termination of DSN cables using wall mounted 110 blocks.

Termination of Copper cable and dressing.

Testing fiber optic cables with OTDR.

Testing UTP and STP Cables with Agillent Technologies test eguipement.

Termination of Co-axial cables (CATV)

Testing CATV cables with Fluke Network Micro Scanner & DTX-1800.

Grounding and Bonding for cable ladders, baskets, sleeves and Cabinets.

Making proper labeling to cables, face plates and cabinets for identification.

2) Patch Panels

Wire management of communication cables(CAT6A, CAT6, CAT5e,CAT5) in patch panel racks.

Termination of jacks T568A, T568B, RJ45 & RJ11.

Testing of communication cables using cable testing equipements.

B) IRAQ(EEB) PROJECT :

Client : Perini Management Services (Temporary Housing Project)

Designation : Fiber Optic/Copper Technician.

Duration : From November 2009 to April 2010.

1) Fiber Optic/Copper Cable

Layout of Fiber Optic/Copper cable through Manholes and Hanholes according to the plan drawing.

Preparing Fiber/Copper cable for splicing.

Splice the Fiber Optic Cable using Splicing machine(Fujikura60s) and dressing of Fiber cores in splice trays.

Termination of Copper cable and dressing.

Termination of Co-axial cables (CATV)

Testing CATV cables with Fluke Network Micro Scanner & DTX-1800

Testing fiber optic cables with OTDR.

Testing Copper Cables with Fluke Network DTX-1800.

2) Patch Panels

Wire management of communication cables(CAT6A, CAT6, CAT5e,CAT5) in patch panel racks.

Termination of jacks T568A, T568B, RJ45 & RJ11.

Testing of communication cables using cable testing equipements.

3. Organization : TRADE AID COMPUTERS. DUBAI, UAE.

Duration : From July 2007 to October 2008

Act as a single point of contact for the customers (for technical support and queries ) and provide initial support to customers.

Coordinate and assign job cards to technicians as appropriate.

Assist Engineers in configuration, troubleshooting and installation.

4. Organization : TATA INDICOM BROADBAND(VSNL) BANGALORE, INDIA.

Duration : From August 2006 to July 2007

Installing broadband connections to customers

Network troubleshooting

Area maintainance

KEY SKILLS

Able to do splicing of SM/MM fiber cables upto 288 fibers and copper cables upto 2400 pairs.

Termination of SC, LC fiber optic connectors using Corning and Panduit termination(Unicam) kit.

Dressing of patch panels and termination of jacks T568A,T568B, RJ45 & RJ11.

Good hands of experience in trouble shooting and maintainance of communication systems.

Strong analytical skill and strong work ethics.

Knowledge of modem configuration & broadband installation.

TECHNOLOGY APPLICATION

Fujikura fsm60S splicing machine and Corning Splicing Machine.

Corning OTDR(Optical Time Domain Reflectometer), Acterna MTS5000e OTDR, AFL Communication OTDR, Fluke Network DTX1800 OTDR

Corning Fiber Optic Connector termination(Unicam)kit.

CAT6A, CAT6, CAT5E, CAT5 communication cables, Connectors with termination kits.

Single Mode/Multi Mode optical fiber cables upto 288 cores, copper cable upto 2400 pairs.

Fluke Network Cable analyzer DTX-1800(Copper module & Fiber Module).

Fluke Network Micro Scanner.

Agillent technologies UTP,STP test equipements.

3M Copper splicing kit.

Megger Tester for Gounding tests.

COMPUTER SKILLS

Operating systems-windows98, 2000, xp

MS-WORD, MS-EXCEL,Internet

C- Language

TECHNICAL TRAINING

Superior Essex, Corning Copper & Fiber Optic Cables.

Leviton Networking Solution Products for Copper & Fiber Optic Cabling Systems.

Corning Products for Telecommunication systems.

Tata Indicom Broadband Telecom Training.

PERSONAL DETAILS:

Permanent Address : S/o M.K. Abdul Kadar

Pakirnakatte, Mallar,

Post Kaup, Udupi District

Karnataka, India.574106

Date of Birth : 21-02-1986

Marital Status : Single

Languages Known : English, Hindi, Malayalam, Tamil, Tulu & Kannada.

Passport No. : GO747054

Issue Date : 05/12/2006

Expiry Date : 04/12/2016

MUHAMMED FAIZAL



Contact this candidate