Post Job Free
Sign in

Project Management

Location:
Leawood, KS
Posted:
March 05, 2012

Contact this candidate

Resume:

EXPERIENCE OVERVIEW:

• Over * years of experience in engineering project management

• Excellent analysis capabilities in schedule development, critical path analysis and resource loading.

• Over 5 years of exceptional experience in project reporting, project planning, project cost analysis, project cost estimation, earned value analysis, cash flow, forecasting and budget preparation.

• Over 5 years of experience in Energy Division projects involving power transmission and distribution systems.

• Knowledgeable on coal or combustion turbine power plants, nuclear power plants, petrochemical facilities, air quality modifications to existing power plants.

• Expert in technical tools like Primavera Project Planner, Oracle Database applications, and Microsoft Office product including MS Project.

• Experience in detailed engineering design, procurement of engineering equipment and construction performing according to project plans and contract requirements.

• Extensive knowledge and understanding of Industrial and Engineering business processes

• Excellent knowledge in cross functional educations like finance, project planning, statistics, management, accounting, economics, and engineering.

• Excellent analytical skills, logical reasoning, interpersonal skills, communications skills, fast & enthusiastic learner, work ethics and a good team player.

• Strong management, administrative and leadership skills to work in team.

RECENT PROJECT OVERVIEW:

Public Service Electric & Gas Company; (2011-Present)

Bayonne 230kV SWYD GIS Expansion EPC Project

SEMPRA Energy; (2010-2011)

Mesquite Solar Part 2 230-34.5 kV Substation and 4.5 mile 230 kV Double Circuit Transmission Line EPC Project

American Transmission Company (ATC) North Portfolio; (2010-Present)

Maintain project schedules that range from level 2 to level 3 schedules. Portfolio contains 20 active schedules

Potomac Electric Power Company (2007 to 2008)

Northeast 69 KV Underground Transmission Line EPC Project

Northeast 212 Substation EPC Project

Public Service Electric & Gas Company (2007 to 2009)

Roseland 230kV Capacitor Bank Addition EPC Project

Roseland 230/138KV Transformer Replacement EPC Project

Hope Creek-New Freedom 500 KV T-Line Project

Branchburg-Flagtown 230 KV T-Line Project

Baltimore Gas & Electric Company (2008 to 2009)

Conastone and Waugh Chapel 500 KV Substation Project

Paca and Orchard 115 KV Substation Project

Southern California Edison (2008 to 2009)

Tehachapi Renewable Transmission Line Segments 4 & 5

SKILLS:

Operating Systems: Windows

Languages: VB script, C++, FORTRAN and AMPL

PM Tools: Primavera Project Planner version 3, 5, 6 and 7 and MS Project 2007

Databases: Oracle 9i/10g and MS Access

Others: MS Office 2007 including VISIO

WORK EXPERIENCE:

Black & Veatch,

Kansas, USA

Project Controls Senior Associate - January 2007 – Present

Responsible for creating new schedule, prepare work breakdown structure (WBS), baseline plan, critical path analysis, and resource loading. Also responsible for updating schedule, track progress for actual vs plan, and generate lookahead report. Develop and update cost reports and reports financial progress to management. Also responsible to prepare and maintain project cash flow and forecasts.

Responsibilities:

• Provide schedule development, develop and maintenance of work breakdown structures (WBS), critical path analysis and resource loading for energy projects

• Develop and maintain cost reports from as-sold estimates and report financial progress to management.

• Prepare and maintain project cash flow and forecasts

• Develop and maintain monthly progress reports for both internal and external use

• Review payables and client invoices, assist on project cost estimation, earned value analysis and budget preparation

• Establishes trends and interacts with engineering disciplines to run the change management program.

• Analyze productivity to develop man-hour forecasts

• Assist in maintenance of project bill of quantities

• Track engineering deliverables, purchase specifications, field construction progress, and estimate client change orders and vendor back charges.

Greenland Engineers & Tractors Company Limited (GETCO)

(Annual Revenue US$50 Million)

Dhaka, Bangladesh

Planning Analyst - February 2002 – December 2004

Responsibilities:

• Conducted proposal preparation, reviewed contracts, and tracked action items

• Assisted in developing project plan and schedule

• Prepared various levels of project reporting for senior management

• Coordinated with various department for business development

EDUCATION:

Master of Science, Industrial Management, December 2006

University of Central Missouri, Warrensburg, MO

(formerly Central Missouri State University)

GPA 3.90/4.0

Bachelor of Science, Mechanical Engineering, December 2001

Khulna University of Engineering and Technology, Bangladesh

(formerly Bangladesh Institute of Technology, Khulna)

GPA 3.14/4.0

EXTRA ACTIVITIES:

• March of Dimes (March for Babies) – Actively participated in fundraising and organizing activities

• Christmas in October - Actively volunteered in organizing activities

REFERENCES:

Available upon requests



Contact this candidate