Classification: Shared Data Internal */*
TAMILSELVAN
SELVANATHAN
Senior Project Planner
PROFILE
** ***** ** ******* ********** in
Planning Works (Shipyard/Marine
Industry) (Brownfield and Greenfield-Oil
and Gas/Petrochemical) UAE
Transferable
EDUCATION
B.E in Electronicsand Instrumentation
Engineering
15-04-2008–15-04-2012
CONTACT
P.O. BOX 2260
Dubai, U.A.E
MOBILE:
+91-638******* WhatsApp
EMAIL: **************@*****.***
PROFESSIONALCOURSEWORKSANDTRAINING
[Primavera -2012][Maximo-CMMS][MS Projects, SAP,IFS,Mariner,Power BI] WORK EXPERIENCE
Drydocks World Dubai, Project Planner
(Shipyard/Marine Industry)
Wood Group PEI Singapore, EVONIK SIMEXProject(IPD0741/050) Brownfield Turnaround- Pre TAR, TAR3, TAR4 Senior PlanningEngineer Gulf Spic Kuwait, FEEDEngineeringProjects
Senior Planning Engineer
Rotary Thailand, Brownfield Thai oil Sriracha Refinery Clean Fuel Project) Turnaround -MAIN EIT WORKS Senior Planning Engineer SINOPECKuwait,Greenfield KIPIC Al-Zour NewRefineryProject L9ZR-FI-60-K031 - SMPEI Wastewater Treatment Plant (Unit 76) Planning Engineer
IMCO Kuwait, Greenfield KIPIC Al-Zour New Refinery Project L9ZR-FI-60-K034 - High Voltage andMainElectricalWorksPlanningEngineer KENTECHKuwait,Brownfield Shutdown KNPC-K529, K542, K513, K364 Planning Engineer
BPCL MadhyaPradesh,Brownfield (Redeveloping and Existing) Planning Engineer
ABB Singapore, Greenfield (Jurong Rock caverns &Jurong Aromatics complex) Planning Engineer
CPCL Chennai, Brownfield (Upgrading and Existing) Planner. Classification: Shared Data Internal 2/1
Offshore Project:
1.Norfolk Vanguard West and East
Offshore HVDC/HVAC Substation Wind Farm Renewable energy Project 1.4 GW
2.Ostwind 4
Renewable energy infrastructure project - offshore converter platform (topside and jacket substructure) 2GW High-Voltage Direct Current (HVDC) transmission system.
3.HuginATopside,Valhall WellbayModuleandPAU
4. FPSO, FSO, New Shipbuilding, PDQJacket,Conversion Platforms & Ship Repair/RigOffshore.
Onshore Project:
Brownfield( Redeveloping,upgrading existing)
1.Thai Refinery Main EIT works PKG 2,3B,5 &
Melaka Diesel Refinery EURO5-Thailand
2.Evonik Simex Project Pre TAR,TAR3,TAR4-Jurong Singapore 3.Exxonmobil CRISP Phase 2B Pre TA/ TA/ Post TA EIT- Jurong Singapore 4.KNPC K529,K542,K513,K364-Kuwait
Greenfield (Development of newenergy(oil, gas, renewables) and industrial. 1.Arkema Symphony Project EIT PKG 1& 2 - Singapore 2.Waste water Treatment plant Unit 76 SMPEI - Kuwait 3.High voltagemainelectricalworks-Kuwait
4.Jurong Rock cavern and Aromatic complex Projects (JAC/ JRC) - Singapore Contract:
Lump sum,Re- measurable (Star rate, Delta rate),Cost plus. Payment method:
(Progressive, MilestonePayment)
FEED Engineering:
(Inter disciplinecheck IDC, IFR,IFA/IFD,IFC/AFC, As Built) Procurement:
( Ordering- Issue enquiry, Receive bids from vendor, Technical evaluation complete, Issue purchase order, Manufacturing -Receipt vendor drawings or documents, Manufacturing clearance,manufacturing, FAT final inspection, Delivery-Packing & Delivery works, Receipt at site,ETA) Construction:
Civil,Structural, Mechanical, Piping,HVAC,C&G Electrical And Instrument,Pre-commissioning Commissioning,Mechanical dossier,Close out. Prepared for PlanningPackage:
RFQ,Manhours norms Estimation ( Labour, Material, Equipment), Bid Schedule
& L1 to L5) Contract Detail schedule, Resource
Loading,PMS,KPI,monitoring,Execution,EVM, Report WeeklyandMonthly, Schedule update,Delay constraints report,Catch up plan report,EOT,Two week lookaheadschedule,90 days Look ahead schedule, Productivity Report,Variance discrepancies Report, Man-hours & S-Curve,Manpower Histogram.